Ir al contenido
Georgia Commons
Menú

Jasper County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 113 - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL / Article II - MINIMUM REQUIREMENTS FOR EROSION, SEDIMENTATION AND POLLUTION CONTROL USING BEST MANAGEMENT PRACTICES

Sec. 113-26. Minimum requirements/BMPs.

Sobre este texto

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Best management practices as set forth in this section and section 113-27 of this chapter shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with subsection (b) of this section or any substantially similar terms contained in a permit for the discharge of storm water issued pursuant to O.C.G.A. § 12-5-30(f), the

Georgia Water Quality Control Act . As used in this subsection the terms proper design and properly designed mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion

and Sediment Control in Georgia specified in O.C.G.A. § 12-7-6(b).

(b) A discharge of storm water runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the Georgia

Water Quality Control Act, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This subsection shall not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.

(c) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the �Georgia Water Quality Control Act,� for each day on which such failure occurs.

(d) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur.

(e) The LIA may set more stringent buffer requirements than stated in section 113- 27(15), (16) and (17), in light of O.C.G.A. § 12-7-6(c).

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 1-8-2018, § IV(B))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:jasper-county/code/113-26@2026-11-23-0312547bc0

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Jasper County Code of Ordinances, Sec. 113-26. Minimum requirements/BMPs | Georgia Commons