Ir al contenido
Georgia Commons
Menú

Jones County · Código de ordenanzas

Appendix A - COMPREHENSIVE LAND DEVELOPMENT / Article VII - USE REQUIREMENTS BY DISTRICT

74.21. Permitted uses.

Sobre este texto

  • As published by Municode, current through 2026-01-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The following uses are permitted within an M-2 district:

(1) Business and professional offices.

(2) Public utility structures and buildings, which may contain offices and storage facilities, provided the installation is properly screened as provided in section 67.

(3) Contractor's storage and equipment yards when located entirely within a building or within a fenced area when properly screened as provided in section 67.

(4) Building and lumber supply yards, provided the requirements of section 67 are met.

(5) Wholesale and storage warehouses and distribution centers.

(6) Automobile service stations, provided the requirements of section 96 are met.

(7) Produce and farmers' markets.

(8) Bus and railroad terminal facilities.

(9) Truck terminals, provided that they are not located adjacent to residential uses, and that acceleration and deceleration lanes of at least 200 feet in length are provided for trucks entering and leaving the site.

(10) Auto auctions.

(11) Type A or Type B manufactured home units or other single-family dwellings for the exclusive use of a watchman or caretaker when located on the same tract as an industrial use, provided the dimensional requirements of the R-3 residential district are met.

(12) Automobile, boat, recreational vehicle, farm equipment and implement, manufactured home, and heavy equipment sales or servicing establishments, provided any repair or servicing must be conducted within a structure which shall not have any opening, other than a stationary window or door for pedestrian ingress and egress, within 100 feet of any residential district, and provided further that all vehicles on a used car sales lot shall be in operating condition at all times. Any operations or storage of vehicles or parts shall be properly screened from view from public rights-of-way, as provided in section 67.

(13) Dry cleaning and commercial laundry facilities.

(14) Car washes, provided that a paved area shall be located on the same lot equal to one-third the number of cars practically accommodated by any washing machinery, excluding hand-held sprayers, times 200 square feet. In addition, a maximum of two curb breaks, each no wider than 30 feet to a street intersection.

(15) Retail uses selling products manufactured on the premises.

(16) Temporary uses, including the sale of Christmas trees, carnivals, bazaars, the sale of seasonal fruits and vegetables from roadside stands, and tent revivals, subject to the provisions of section 93.

(17) Outside, aboveground storage tanks for gasoline, liquefied petroleum gas, oil or other inflammable liquids or gases, provided that all pertinent rules and regulations of the Georgia Safety Fire Commission are met.

(18) Radio and television broadcasting studios.

(19) Electrical, heating and plumbing supply stores.

(20) Farm and garden supply stores.

(21) Appliance stores, including repairs and service.

(22) Furniture and home furnishings stores.

(23) [Reserved.]

(24) Office supply stores.

(25) Automotive part and supply stores.

(26) Automobile, boat, recreational vehicle, farm equipment and implement, and manufactured home sales.

(27) Agriculture, forestry, livestock and poultry production, provided that the operation is conducted on a tract of land not less than ten acres in area, and that no structure containing poultry or livestock and no storage of manure or odor or dust producing substance or use shall be located within 200 feet of a property line.

(28) Signs as provided in section 97.

(29) Accessory buildings and uses customarily incidental to any use allowed as a permitted or conditional use and located on the same lot as the principal structure or use, provided the requirements of section 93 are met.

(30) Communication towers, provided the requirements of section 98.5 are met.

(31) All permitted uses within an M-1 wholesale and light industrial district.

74.22. Conditional uses. The following uses may be allowed as conditional uses within an M-2 district:

(1) The manufacturing, processing, fabrication, repair, and servicing of any commodity or product, subject to the following conditions:

(a) Any such use as determined by the zoning enforcement officer that may be obnoxious or offensive by reason of the emission of odors, dust, smoke, gas, noise, or vibration shall be referred to the environmental protection division of the Georgia Department of Natural Resources; and

(b) Prior to the issuance of a zoning compliance permit, the applicant shall provide the zoning enforcement officer with written approval of the nature, plans, and specifications of the said use from the environmental protection division of the Georgia Department of Natural Resources; and

(c) All other requirements within the district in which these industrial activities can be located shall be met.

(2) Development of natural resources, including the removal of mineral and natural materials, together with the necessary buildings, machinery, and appurtenances thereto, provided the requirements of section 98 are met.

(3) Junkyards, provided the following conditions are met:

(a) No such operation shall be permitted to locate closer than 1,000 feet from a residential subdivision and no closer than 50 feet from any property line.

(b) No such operation shall be permitted to locate on or facing a state or federal highway.

(c) All such operations shall be completely enclosed by an opaque fence or wall, except for driveway areas, having a minimum height of six feet, but in no case less than such height as will effectively screen all operations from view.

(d) The number of vehicular driveways permitted on any single street frontage shall be limited to one per 500 feet with a maximum of 20 feet of driveway width.

(4) Data center, provided all conditions/standards set forth in Sections 74.23 and

96.7 are satisfied.

A data center shall not be an as of right use in any zoning district in Jones County.

In order for an applicant to seek a M-2 conditional use authorization for a data center, an application shall be required and all procedures required under CLDR Sections 151 through 154 shall be observed.

(Ord. No. 201203-2o, 3-20-2012; Res. of 1-16-2026, § 1, 1-16-2026)

74.23. Performance standards. The following standards shall apply and govern the entire contiguous tract of land proposed for a data center. In the event of a conflict between these standards and any other provisions of the CLDR, these standards shall control:

(1) Use. Data center.

i) Minimum lot size: 100 acres.

(2) Setbacks.

i) Two hundred feet from all property lines, except 400 feet for buildings or structures that generate noise. For purposes of this provision, a setback is the distance between a right-of-way or property line and the nearest point of a structure, building or projection therefrom including the land area located between said points. This setback requirement may be adjusted by the Board of Commissioners by the use permit approval.

(3) Height Regulations. Principal buildings shall not exceed 75 feet in height, measured from structure pad level. This height limitation shall not apply to accessory structures such as water towers, conveyor belts, other incidental and uninhabited structures, or other items exempted by Section 52 of the CLDR.

(4) Buffer requirements. A minimum 200-foot wide buffer that complies with Section 84.2 shall be required along all property lines. This buffer may be located within required setbacks. This buffer requirement may be adjusted by the Board of Commissioners by the use permit approval.

(5) HVAC and mechanical screening. All air conditioning units HVAC systems, and other mechanical systems located outdoors shall be visually screened from view from public road rights-of-way and adjacent residential properties using buildings, walls, fencing, roof elements, berms, trees, natural elements or landscaping.

(6) Front building facade. The front building facade of principal structures shall be oriented toward street fronts or adjacent public road frontage. This requirement does not apply where the building is more than 500 feet from the public right-of-way or otherwise not visible from the closest public right-of-way.

(7) Security fencing. Security fencing and walls along the right-of-way shall not be located within the required buffer unless they comply with Section 84.9. Any security fencing installed that intersects, crosses, or otherwise interacts with a natural waterway shall be designed, constructed, and maintained in a manner that does not impede or obstruct the natural flow of water and in full compliance with all local, State, and federal requirements regarding impacting State waters.

(8) Accessory structures. Accessory structures shall comply with applicable CLDR provisions. Accessory structures that meet the buffer setbacks outlined in Section 74.23(4) are permitted. Guardhouses and secure entry features are permitted at entrance(s) to public right-of-way.

(9) Landscaping. Data centers shall comply with all landscaping requirements in Section 84, irrespective of proximity to the gateway overlay zoning district.

(10) Private roads. Private roads within the development are permitted and shall be designed and constructed in accordance with county public road standards under the CLDR.

(11) On-site power generation: On-site power generation using natural gas, solar, battery storage, or other technologies is permitted as an accessory use.

Emergency diesel generators are permitted without separate approval provided they comply with noise, screening, and all other pertinent requirements and are Tier IV compliant. Power generation via a steam-based power system shall only be authorized if specifically approved by the board of commissioners as part of use permit approval.

(12) Lighting. All outdoor lighting shall use full cutoff fixtures, limited to 3,500K, and be configured to prevent light spillage onto adjacent properties.

(13) Noise: Upon submission of an application for a building permit for a principal data center structure, said application shall include sound level modeling that complies with the levels established herein. Sound levels at any property line shall not exceed the dB levels set forth herein except during emergency generator testing, which is limited to one test period per week on weekdays between 11:00 a.m. and 1:00 p.m.

i) Data center: 55 dBA daytime (7:00 a.m. - 7:00 p.m.)/45 dBA nighttime (7:00 p.m. - 7:00 a.m.).

(14) Water consumption: Operations shall use closed-loop cooling systems or equivalent technologies to minimize water usage beyond initial system charging and personnel needs. Non-closed loop and evaporative cooling systems are prohibited.

A public water supply is required. The drilling or operation of wells for water supply is prohibited.

(15) Traffic management: A building permit application for a data center shall include a traffic impact study that identifies measures to minimize disruptions to local roads caused by heavy equipment and material transport.

(16) Environmental impact study: An application for a use permit for a data center shall be accompanied by a baseline environmental impact study acceptable to the Director the contents of which shall include information on potential impacts to air quality, water resources, energy generation, noise, light, traffic, natural resources, and archaeological or cultural resources. The study shall also include information on mitigation of those impacts. The information provided shall be considered by the commission in determining whether to approve or deny the application. Environmental benchmarks, over and above those in the baseline study, shall be identified by the board of commissioners upon approving any use permit. A study demonstrating compliance with such benchmarks shall be provided to the Director upon application for a building permit.

(17) Decommissioning plan: A building permit application for a data center shall include a decommissioning plan that includes detailed procedures for the management, recycling, and disposal of electronic waste and all other materials.

The decommissioning plan shall also include provisions addressing the proper handling, recycling, and disposal of electronic waste and other materials generated as a result of future technological upgrades or equipment replacements. The plan shall include a financial surety, such as a bond or letter of credit, in an amount sufficient to cover the estimated costs of decommissioning, as determined by the county.

(18) Waste water: Data centers shall connect to a publicly owned municipal or county sewer system. Where municipal or county sewer service is not available, on-site wastewater treatment and disposal systems are prohibited. The building permit application shall include a wastewater management plan that addresses:

i) Pretreatment methods for process wastewater (including cooling tower blowdown, water treatment reject, and any other non-sanitary flows) to meet all applicable local sewer-use ordinance limits prior to discharge into the public system;

ii) Estimated daily wastewater volumes under normal operation and during maintenance events; and

iii) Procedures for proper handling and disposal of any wastewater or sludge generated during equipment decommissioning or end-of-life of the facility.

(19) Other regulatory rules and regulations. All other local, State, and federal regulations shall be applicable. If there is a conflict between this Ordinance and such local, State and federal regulations, the more rigorous requirement shall control.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 1-16-2026, § 1, 1-16-2026)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:jones-county/code/74.21@2026-01-16-3b9ba08e61

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Jones County Code of Ordinances, 74.21. Permitted uses | Georgia Commons