Chapter 26 - ENVIRONMENT / Article II - GROUNDWATER RECHARGE AREA PROTECTION

Sec. 26-66. Permit requirements and enforcement.

Sobre este texto

  • As published by Municode, current through 2022-03-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

No building permit, rezoning request or subdivision plan will be approved by the permitting officer unless the permit, request or plan is in compliance with the groundwater protection standards set forth in this article.

(1) Enforcement. The permitting officer, his agent, officers and employees shall have authority to enter upon privately owned land for the purpose of performing their assigned duties and responsibilities under this article and may take or cause to be made such examinations, surveys or sampling as the permitting officer deems necessary.

a. The permitting officer may require a bond with surety and conditions sufficient to secure compliance with the conditions set forth in the permit. The particular amount and conditions of the bond shall be consistent with the purposes of this article. In the event of a breach of any condition of any such bond, the permitting officer may institute an action in a court of competent jurisdiction upon such bond and prosecute the same to judgment and execution.

b. The permitting officer shall have authority to enforce this article; issue permits under this article; and address violations or threatened violations of this article by issuance of violation notices, administrative orders and civil and criminal actions. All costs, fees and expenses in connection with such actions may be recovered as damages against the violator.

c. Law enforcement officials or other officials having police powers in the jurisdiction shall have authority to assist the permitting officer in enforcement.

d. The permitting officer shall have the authority to issue cease and desist orders in the event of any violation of this article. Cease and desist orders may be appealed to a court of competent jurisdiction, as identified in this article.

e. When the permitting officer determines that a building or other structure has been constructed in violation of this article, the violator may, at the discretion of the permitting officer, be required to remove the structure.

f. When removal of vegetative cover, excavation or fill has taken place in violation of this article, the violator may be required to restore the affected land to its original contours and to restore vegetation, as far as practicable.

(2) Permit review and site plan requirement. With the exception of certain exempted activities identified in subsection (4) of this section, applications for a development permit within the groundwater recharge area district shall include a site plan providing the following information:

a. A map, drawn to a scale of one inch equals 50 feet, showing all planned improvements including the width, depth and length of all existing and proposed structures, roads, water courses and drainage ways, water lines, wastewater and stormwater facilities and utility installations.

b. Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site.

c. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.

d. Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet.

e. Location and detailed design of any spill and leak collection systems designed for the purpose of containing hazardous or toxic materials which may be released accidentally.

f. Calculations of the amount of cut and fill proposed and cross sectional drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scale and vertical scale must be shown on cross sectional drawings.

(3) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of the site plan.

Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill or removal of vegetation during construction or otherwise result in an alteration of the overall appearance of the development as proposed can be amended only with the approval of the permitting officer. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions, are exempted from this requirement.

(4) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans:

a. Single-family detached homes constructed within a subdivision of fewer than five parcels.

b. Repair to a facility that is part of a previously approved and permitted development.

c. Construction of minor structures, such as sheds or additions to single-family residences.

(5) Review procedures. The application shall be made to the permitting officer and shall be reviewed within 14 days. The review period shall begin with the permitting officer's written determination that the application is complete. The review period shall include the preparation of findings (approval, conditional approval or disapproval) by the permitting officer. The applicant will receive written notification of the findings of the permitting officer. If the review process is not completed and written findings released within 30 days, the application is considered to be approved. Decisions of the permitting officer may be appealed to the board of commissioners.

(6) Duration of permit validity.

a. If construction described in the development permit has not commenced within six months from the date of permit issuance, the permit shall expire. The permitting officer is not required to notify the permittee of the pending expiration of the permit.

b. If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire six months after the date work ceased. The permitting officer is not required to notify the permittee of the pending expiration of the permit.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 11-13-2001, § 4)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:marion-county/code/26-66@2022-03-08-3d11501964

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Marion County Code of Ordinances, Sec. 26-66. Permit requirements and enforcement | Georgia Commons