Ir al contenido
Georgia Commons
Menú

Mitchell County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article II - CONSTRUCTION CODES / Division 3 - PERMITS

Sec. 18-97. Certificates.

Sobre este texto

  • As published by Municode, current through 2023-08-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Certificate of occupancy.

(1) Building occupancy. A new building shall not be occupied or a change made in the occupancy, nature, or use of a building or part of a building until after the building official has issued a certificate of occupancy. Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing, and fire protection systems have been inspected for compliance with the technical codes and other applicable laws and ordinances and are released by the building official.

(2) Issuing certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical, and plumbing systems in accordance with the technical codes, reviewed plans, and specifications, and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of the technical codes.

(3) Temporary/partial occupancy. A temporary/partial certificate of occupancy may be issued for a portion of a building, which may safely be occupied prior to final completion of the building.

(b) Service utilities.

(1) Connection of service utilities. No person shall make connections from a utility, source of energy, fuel, or power to any building or system which is regulated by the technical codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued.

(2) Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel, or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy.

(3) Authority to disconnect service utilities.The building official shall have the authority to authorize disconnection of utility, service to the building, structure of system regulated by the technical codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure, or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure, or service system shall be notified in writing, as soon as practical thereafter.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2002-007, exh. A(4.9), 10-8-2002)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:mitchell-county/code/18-97@2023-08-08-e4e4e9f7d0

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.