Ir al contenido
Georgia Commons
Menú

Oconee County · Código de ordenanzas

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 11 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT / 1117 - Stormwater management in the non-urbanized area.

Sec. 1117.11. Timing of installation.

Sobre este texto

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Construction of the stormwater system shall be initiated as part of the grading of the site.

Stormwater detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches shall be coordinated with the construction of streets and other site improvements, as appropriate, in accordance with an approved Stormwater Management Plan.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:oconee-county/code/1117.11@2026-04-07-b57de09771

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Oconee County Code of Ordinances, Sec. 1117.11. Timing of installation | Georgia Commons