Ir al contenido
Georgia Commons
Menú

Oconee County · Código de ordenanzas

División II. STORM DRAINAGE & STORMWATER MANAGEMENT

43 secciones

Buscar en los códigos de Oconee County

Legible por máquinas https://georgiacommons.org/counties/oconee/code/~part-code-of-ordinances/~chapter-66/~article-11/~division-ii.md · https://georgiacommons.org/counties/oconee.md · MCP https://mcp.georgiacommons.org/mcp

Contenido

  1. Sec. 1111. Purpose and intent
  2. Sec. 1112. Definitions related to storm drainage and stormwater management
  3. Section 122.26. (b) (14)
  4. Sec. 1113. Applicability
  5. Sec. 1114.01. Prohibitions
  6. Sec. 1114.02. Industrial or construction activity discharges
  7. Sec. 1114.03. Access and inspection of properties and facilities
  8. Sec. 1114.04. Notification of spills and accidental discharges
  9. Sec. 1115.01. Responsibility for maintenance
  10. Sec. 1115.02. Maintenance requirement
  11. Sec. 1115.03. Easements
  12. Sec. 1115.04. Access and inspection of properties and facilities
  13. Sec. 1116.01. General
  14. Sec. 1116.02. Stormwater application and permit
  15. Sec. 1116.03. Standards for stormwater management
  16. Sec. 1116.04. Stormwater collection and transport system design considerations
  17. Sec. 1116.05. Natural drainage
  18. Sec. 1116.06. Drainage system construction
  19. Sec. 1116.07. Materials and installation
  20. Sec. 1116.08. Field changes
  21. Sec. 1116.09. Endwalls
  22. Sec. 1116.10. Catch basins and storm sewer structures
  23. Sec. 1116.11. Timing of installation
  24. Sec. 1116.12. Maintenance responsibilities
  25. Sec. 1116.13. Stormwater discharge management
  26. Sec. 1117.01. General
  27. Sec. 1117.02. Stormwater application and permit
  28. Sec. 1117.03. Standards for stormwater management
  29. Sec. 1117.04. Storm drainage design considerations
  30. Sec. 1117.05. Natural drainage
  31. Sec. 1117.06. Drainage system construction
  32. Sec. 1117.07. Materials and installation
  33. Sec. 1117.08. Field changes
  34. Sec. 1117.09. Endwalls
  35. Sec. 1117.10. Catch basins and storm sewer structures
  36. Sec. 1117.11. Timing of installation
  37. Sec. 1117.12. Maintenance responsibilities
  38. Sec. 1117.13. Stormwater discharge management
  39. Sec. 1118.01. Violations
  40. Sec. 1118.02. Notice of violation
  41. Sec. 1118.03. Costs of abatement of the violation
  42. Sec. 1118.04. Civil penalties
  43. Sec. 1118.05. Remedies not exclusive

Georgia Commons es independiente y no está afiliado a este condado ni a su editorial. Nada aquí es asesoría legal.