Ir al contenido
Georgia Commons
Menú

Peach County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 26 - ENVIRONMENT / Article VIII.5 - POST DEVELOPMENT STORMWATER MANAGEMENT

Sec. 26-358. Post development stormwater management performance criteria.

Sobre este texto

  • As published by Municode, current through 2023-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article:

(1) Water quality. All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if:

a. It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual;

b. Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual;

c. The Georgia Stormwater Management Manual Stormwater Quality Site Development Review Tool shows that 85 percent of the total suspended solids (TSS) have been removed from post-developed stormwater runoff through the use of structural stormwater controls or nonstructural practices; and,

d. Runoff from hotspot land uses and activates identified by the county are adequately treated and addressed through the use of appropriate structural stormwater control, nonstructural practices and pollution prevention practices.

(2) Stream channel protections. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches:

a. Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer;

b. 24-hour extended detention storage of the one-year, 24-hour return frequency storm event;

c. Erosion prevention measures such as energy dissipation and velocity control.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 4-10-2018)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:peach-county/code/26-358@2023-11-14-52c527baf3

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Peach County Code of Ordinances, Sec. 26-358. Post development stormwater management performance criteria | Georgia Commons