Peach County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 26 - ENVIRONMENT / Article VIII.5 - POST DEVELOPMENT STORMWATER MANAGEMENT
Sec. 26-359. Over bank flooding protection.
Sobre este texto
- As published by Municode, current through 2023-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Downstream over bank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the predevelopment rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under section 26-359 is exempted, then peak discharge rate attenuation of the two-year through the 100-year return frequency storm event must be provided.
Historia
(Ord. of 4-10-2018)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.