Ir al contenido
Georgia Commons
Menú

Pulaski County · Código de ordenanzas

Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations. / 5.2.10 - Construction Methods—Roadways.

Section 5.2.10.2. Placing and Rolling Aggregate.

Sobre este texto

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All base course material shall be deposited and spread by means of spreader boxes, or approved mechanical equipment, or from moving vehicles equipped to distribute the material in a uniform layer.

Immediately following the spreading of the course aggregate, all material placed shall be compacted to the full width by rolling with a smooth wheel power roller weighing seven (7) to ten (10) tons. Rolling shall progress gradually from the sides to the center, parallel with the center line of the street and lapping uniformly each preceding track by one-half the width of such track, and shall continue until all the surface has been rolled and has been thoroughly keyed, the interstices of the stone reduced to a minimum and until it ceases to creep or wave ahead of the roller.

Any irregularities, areas of segregation, or depressions that develop under such rolling shall be corrected by loosing the material at these places and adding or removing material until the surface is smooth and uniform. The application of water, applied uniformly over the base course, may be required to achieve adequate compaction. Shaping and rolling shall be performed alternately as required to maintain a uniform compacted base until a surface or treatment has been applied to the base. Along curbs, headers, and walls, and at all places not accessible to the roller, the base course material shall be tamped thoroughly with mechanical tampers or approved hand tampers.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pulaski-county/code/5.2.10.2@2023-06-05-f3c842f880

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Pulaski County Code of Ordinances, Section 5.2.10.2. Placing and Rolling Aggregate | Georgia Commons