Section 5.2.10.3. Testing.
Sobre este texto
- As published by Municode, current through 2023-06-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Prior to construction of the graded aggregate base course, the subgrade compaction shall be tested by the developer and/or design professional of record and witnessed by the County Roads Superintendent or his/her duly appointed representative. Likewise, the compaction of the base course shall be tested prior to the application of Bituminous Plant Mix paving. Compaction testing shall be accomplished by visual inspections of actual live axle loads, commonly referred to as "Roll Test." All compaction tests shall be scheduled with the County Roads Superintendent, or his/her duly appointed representative no less than twenty-four (24) hours in advance. The contractor shall also provide an adequate testing vehicle, minimum eighteen (18) ton hauling capacity, fully loaded. All areas or sections of the subgrade and base course, which do not pass visual live load compaction testing, shall be corrected. Once the contractor makes all necessary corrections, it shall be his/her responsibility to schedule any and all subsequent roll tests.