Rockdale County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article III - WASTEWATER SYSTEM / Division 5 - NONDOMESTIC (INDUSTRIAL; COMMERCIAL; INSTITUTIONAL) USE OF PUBLIC WASTEWATER FACILITIES
Sec. 98-165. Significant contributing industries.
Sobre este texto
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All significant contributing industries (see definition of significant contributing industry in section 98-72) that discharge process wastewater effluent into the county wastewater system shall
comply with the following:
(1) Sampling manhole. In order to provide for accurate sampling and measurement of industrial wastes, each significant contributing industry shall provide and maintain on each of its industrial waste outlet sewers, a large manhole or sampling chamber
to be located outside the plant. If inside the plant fence, there shall be a gate near the sampling manhole with a key furnished to the county. There shall be ample room provided in each sampling manhole to enable convenient inspection and sampling by the county, or its agent. In certain sampling manholes where noxious fumes may accumulate, the county may
require a fume exhaust system to protect the life and health of the county employees who are required to enter the sampling manhole. The fume exhaust system shall extract the fumes from the bottom of
the manhole and provide not less than one air change per minute. The manhole shall include a waterproof 120-volt (120V), single phase electrical outlet at or near the installation.
(2) Provision for fiow monitoring. Each sampling manhole shall contain a properly installed primary flow monitoring device such as a Parshall flume, Palmer-Bowlus flume, or other similar device as is approved by the county. Plans of the proposed sampling manhole and monitoring device shall be prepared by a registered
engineer and submitted to the county for review and approval.
(3) Discharge permit required. It shall be unlawful for any significant contributing industry, as determined under this article, to discharge wastewater into the county wastewater system without a county issued discharge permit.
Historia
(Ord. No. 2007-07, § 1, 3-27-2007)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.