Ir al contenido
Georgia Commons
Menú

Rockdale County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article III - WASTEWATER SYSTEM / Division 5 - NONDOMESTIC (INDUSTRIAL; COMMERCIAL; INSTITUTIONAL) USE OF PUBLIC WASTEWATER FACILITIES

Sec. 98-164. Sampling and testing procedures.

Sobre este texto

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Sampling procedures. When wastewater sampling is required by the county of any user for any purpose, the following sampling procedures shall be utilized:

(1) Except as indicated in subsection (2) below, the user must collect wastewater samples using 24-hour flow-proportional

composite collection techniques where feasible. In the event flow-proportional sampling is infeasible, samples may be obtained through 24-hour time-proportional composite sampling or through a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effiuent being discharged. Samples shall be taken of

increments of not more than one hour, properly refrigerated and composited in proportion to the flow for a representative sample. The frequency of sampling, sampling chamber, metering device, sampling methods, and analysis of samples shall be

subject, at any time, to inspection and verification by the county. Sampling and measuring facilities shall be such as to provide safe access for authorized personnel of the county for making such inspection and verification.

(2) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques.

(b) Testing procedures.

(1) All wastewater monitoring samples required by the county shall be tested by an independent laboratory for the parameters required, with the results submitted to the county on the original laboratory

report sheets signed by an authorized company representative. The requirement for utilization of an independent laboratory may be waived by the county

when the required tests are performed by the county or other approved agency or when duplicate ("split") samples are provided to the county and the county's testing results of such duplicate samples show a reasonably good correlation with the

user's in-house testing results.

(2) All measurements, tests, and analyses of the characteristics of waters and wastes to which reference is made in this chapter shall be performed in accordance with the techniques prescribed in 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR 136 does not contain sampling or analytical techniques for the

pollutant in question, sampling and analyses must be performed in accordance with procedures approved by EPA.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2007-07, § 1, 3-27-2007)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:rockdale-county/code/98-164@2026-01-27-2db5db2264

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Rockdale County Code of Ordinances, Sec. 98-164. Sampling and testing procedures | Georgia Commons