Sec. 34-106. Stormwater management ponds.

Sobre este texto

  • As published by Municode, current through 2026-09-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

• Ponding elevations must be shown on profile of dam/outlet detail.

• Free board (minimum two and one-half feet from top of dam to 100-year storm ponding elevation and one-half foot from invert of emergency spillway.

• Emergency spillway must be able to safely pass the 100-year storm event inflow. Calculations for emergency spillway routing must be provided. If principal spillway is used as emergency bypass, it must be sized to pass the unrouted (inflow) 100-year storm event.

• No slopes shall be greater that 3:1.

• Top of all dams must be greater than or equal to ten-foot minimum width.

• Maintenance easement must be provided ten feet beyond the toe of slope and ten feet beyond top of bank.

• No utilities can be located within 20-foot of any portion of pond structure, dam, outlet, rip rap, etc.

• Calculations showing outlet pipe for detention ponds will accommodate 100 percent plus of Q-100 unrouted, if no earthen embankment emergency spillway is proposed.

• Twenty-four-hour detention of the one-year storm is required if water quality protection is required, unless other options approve by county engineering.

• Provide a cross-section of detention pond embankment including outlet pipe, emergency spillway, embankment slopes, minimum embankment top width, outlet control structures, headwalls, and riprap. Verify that minimum oneENVIRONMENT § 34-106 half inch freeboard above maximum water surface elevation to elevation of emergency overflow is to be provided. There shall be a minimum of

two and one-half feet to top of dam from the 100-year ponding elevation for all dams, earthen, concrete, etc.

• The minimum distance from outlet invert to adjoining property line, right-of-way, stormwater buffer shall be greater than 20 feet. Drainage and access easements shall be provided on all conveyances.

• Maximum ponding for parking lot detention:

six inches on ten-year storm, nine inches on 100-year storm.

• The rational method may not be used for detention pond design.

• The following outlet control structure pipe sizes are required based on outlet orifice diameter:

Orifice Diameter Minimum Pipe Diameter < 3" 6" 3" to < 5" 8" 5" to 11" 12"

• If the primary outlet is to serve as the emergency overflow all associated weirs, orifices, pipes, outlets, energy dissipaters, etc. must be

designed and properly sized to safely pass the un-routed 100-yr event pond inflow via the system.

• All outlet structures shall be RCP and shall have detail with ponding elevations shown, top of dam, emergency spillway, etc.

• Principal spillway shall be RCP or HDPE.

• All inflow pipes pipe to the pond less than or equal to 48 inches must be greater than 50 feet (horizontal) from the face of the outlet control structure or any opposing toe of slope and for pipes greater than 48 inches the distance must be 100 feet. If distance is less than specified, then baffles or diversion berms must be placed. The

methods used must be of a permanent nature and easily maintained. Methods employed are subject to county approval and lesser distance, even with diversion methods, is subject to county approval.

• Dams shall be constructed with base of dam, structure installation, and then the dam construction. Dams shall be built in lifts no greater than six inches and each lift compacted to 95 percent

standard proctor. Compaction test results may be required by Stephens County Public Works and it is the contractor's responsibility to coordinate with public works. For fills in excess of ten vertical feet, geotechnical testing may be required and it is the responsibility of the contractor,

developer, or owner to coordinate with Stephens County for requirements. See Stephens County's Construction Standards.

• If detention for project is claimed to be provided in a regional detention facility that was permitted prior to January 1, 2001, provide a copy of the original study that met the regulations at the time the facility was permitted. ACOE input

maybe required if using Lake Hartwell. The project shall provide proof that the detention facility was designed and intended to operate with the

flows generated by the site in question along with all other current or proposed drainage. If detention for project is claimed in an existing facility, provide documentation that:

(1) Existing facility was certified in last 18 months; or

(2) Documentation that facility meets the development requirements when the facility was approved and additional drainage

area and conditions were approved in the original concept; or

(3) That redesign and construction will be preformed to bring facility into compliance with this Code.

• All stormwater management facilities are to have an "as-built" survey stamped by a state registered land surveyor and a have all routing, BMPs "signed off" by engineer certifying the pond and flows does not exceed the "design parameters" set forth in this article. The report shall contain at a minimum the original design parameters (Q, WSEs, freeboard, etc) and a detail of the pond (plan and section) and outlet (section). Also the as-built routed (Q, WSEs, freeboard, etc.) and a detail of the pond (as-built plan and section) and outlet (as-built section detailing orifice size, elevation, etc.) shall be provided, along with other information as requested by county.

• If pond is private, copies of maintenance agreements shall be provided to county.

• Preparation of stormwater concept plan and meeting with county staff to review prior to submitting plans or plat. Concept plans shall include at a minimum the outline information in section

1.5 of the Georgia Stormwater Management Manual.

• Landscaping plan for SWMF per appendix F of the bluebook.

• Storm-drain design (See article II).

• All open channel design (See article II).

(Ord. No. 2010-34-2, 10-12-2010) Sec 34-107. Energy dissipation summary.

Provide energy dissipater calculations/designs for outlet headwalls of pipes and detention ponds.

The following energy dissipaters may only be used in the corresponding Froude number range:

Energy Dissipater Froude Number Range Riprap apron FN <= 2.5 Riprap outlet basin FN <= 2.5 Baffled outlet * FN from 1—9 depending upon conditions

* Outlet can be concrete, concrete with blocking, baffles, etc.

• Velocities must be notated on all pipe profiles and the associated energy dissipaters shown on profile.

• The velocity of the flow as it leaves the apron shall be shown on profile

• Non-erosive velocity from Storm Water Design Manual (GREEN BOOK)

• Energy dissipation measure shall be design for the 25-year storm frequency and in accordance with the "Manual for Erosion and Sediment Control in Georgia", latest edition.

Pipe outlet headwall/ Detention pond 25-year postdeveloped flow velocity at outlet headwall Nonerosive velocity from Stormwater Design Manual Froude Number Type of energy dissipation measures proposed A B C etc.

Downstream receiving conveyance velocity summary (by individual basin):

• Study point hydraulic structure/basin;

• One- two- five- ten- 25-, 50-, 100-year predeveloped flow velocity;

• One- two- five- ten- 25-, 50- 100-year postdeveloped flow velocity;

• Current condition of the channel (stable or is it eroding); to be justified with adequate documentation;

• Adverse impact expected from proposed project;

• Necessary detention.

(Ord. No. 2010-34-2, 10-12-2010) Sec 34-108. Maps.

• A map showing drainage areas used for pipe design.

• A map showing drainage areas for all hydrographs. Preferably county GIS.

• A map showing all on-site drainage areas, off-site drainage areas, and all pond bypass areas considered in detention calculations.

ENVIRONMENT Sec 34-108

• Calculations determining the capacity of existing pipe to carry the proposed discharges. No drainage pipe shall be under pressure. The 100-

year HGL shall be within the all pipes.

• Calculations showing discharge of concentrated flows into the streets do not exceed the following flow rates:

Local road Less than 2.0 cfs for 25-year event Minor collector Less than 1.0 cfs for 25-year event Major county roads Less than 0.5 cfs for 25-year event Maps should show time of concentration (TC) calculations for all flow paths, curve number calculations for both predeveloped and postdeveloped conditions for all basins.

All outlet structures shall be RCP and shall have detail with ponding elevations shown, top of dam, emergency spillway, etc.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2010-34-2, 10-12-2010)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:stephens-county/code/34-106@2026-09-08-937168ee2b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Stephens County Code of Ordinances, Sec. 34-106. Stormwater management ponds | Georgia Commons