Ir al contenido
Georgia Commons
Menú

Stephens County · Código de ordenanzas

Part - CODE OF ORDINANCES / Chapter 34 - ENVIRONMENT / Article IV - STORMWATER MANAGEMENT / Division 2 - STORMWATER MANAGEMENT REQUIREMENTS

Sec. 34-109. Ten percent downstream analysis.

Sobre este texto

  • As published by Municode, current through 2026-09-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Analysis of downstream conditions shall, at a minimum, include the following:

Ten percent downstream analysis (from all ponds and site in general);

• Ten percent downstream analysis (where site area, is less than ten percent of the drainage basin area);

• Identification of all affected structures between lower limit of site and ten percent analysis point;

• Analysis of all affected structures between lower limit of site and ten percent analysis point;

• Prerouting and postrouting analysis;

• Describe in combination with a topographic map, all culverts, obstructions, existing and potential erosion problems, elevations of existing improvements, and existing drainage complaints, between the downstream property line and the ten percent point;

• Analyze downstream watercourses and receiving conveyances to determine 25-year flow channel velocities. If the nonerosive velocity of

the stream is exceeded, detention may be required. Provide calculations with cross-section, depth of flow and velocity in channel;

• Analyze existing pipe systems and culverts for compliance with current development regulation design criteria. Culverts should pass QIOO. If existing pipes are not adequate for

increased 100-year flow, detention may be required. (DR 8.2.Ic);

• Hydrograph comparisons for the one-, two-, five-, ten- 25- 50- and 100-year storms for both the downstream property line study point and the point where the drainage basin equals ten times the project area;

• A detailed written description of the first 500 feet off site; at least one photograph looking downstream with some object included in the photograph for scale shall be included;

• Predeveloped on-site hydrograph;

• Basin area at study point excluding on-site area hydrograph;

• Postdeveloped on-site hydrograph;

• Since downstream analysis indicates adverse impacts are expected, provide stormwater detention in basin(s) for the one-, two-, five-,

ten-, 25-, 50- and 100-year storm event. Route the 100-year storm through the pond so that there is no overflow from the pond;

• Detain the runoff from the one-year storm for 24 hours. Use the SCS runoff equation to size the volume required. Use appropriate equations to size the orifice

• Schedule a meeting to discuss any county comment(s);

• All hydrographs shall be based on a 24-hour storm.

• Orifices less than three inches in diameter must be protected from clogging. A trash rack (maximum mesh opening of d/2) with a surface area of at least 10 square feet shall protect all orifices 15" or less in diameter. Provide detail.

Racks should be easily cleaned and maintained.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2010-34-2, 10-12-2010)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:stephens-county/code/34-109@2026-09-08-d634c5dc2d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Stephens County Code of Ordinances, Sec. 34-109. Ten percent downstream analysis | Georgia Commons