Union County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article I - IN GENERAL
Sec. 18-1. Electrical connections for water and sewer systems.
Sobre este texto
- As published by Municode, current through 2023-11-30
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) No public or private electrical authority, corporation, company, individual or otherwise shall provide, connect, supply or install, or cause to be provided, connected, supplied or installed, to or upon any building, mobile home or premises to contain in the future a water or sewage system or permanent connections for the supply of electrical power from an outside source until a valid sewage disposal permit and water system approval for such structures has been obtained from the county health department. For the purposes of this chapter the term "permanent connections" means any connection other than that provided solely during the immediate and continuous construction of a structure itself.
(b) Electrical wiring shall be in accordance with the minimum requirements and standards of the National Electrical Code.
(c) Water supply and sewage disposal shall be constructed and installed in accordance with the minimum standard of the state board of health and the department of public health under 1964 Ga. Laws, pages 499—507.
Historia
(Res. of 2-23-1973, § I; Amd. of 8-25-2005)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.