Ir al contenido
Georgia Commons
Menú

Walker County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 22 - LAND DEVELOPMENT / Article VIII - POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 4 - CONSTRUCTION INSPECTIONS OF POST-DEVELOPMENT STORMWATER MANAGEMENT SYSTEM

Sec. 22-790. Notice of construction commencement.

Sobre este texto

  • As published by Municode, current through 2026-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) The applicant must notify Walker County in advance before the commencement of construction or land development activities. Periodic inspections of the stormwater management system construction shall be conducted by the staff of Walker County or certified by a professional engineer or their designee who has been approved by Walker County. All inspections shall be documented and written reports prepared that contain the

following information:

(1) The date and location of the inspection;

(2) Whether construction is in compliance with the approved stormwater management plan;

(3) Variations from the approved construction specifications; and

(4) Any violations that exist. If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. No additional work shall proceed until any violations are corrected and all work previously completed has received approval by Walker County.

(b) In addition, the person responsible for carrying out the plan may be required to provide inspection monitoring and reports to ensure compliance with the approved plan and to determine whether the measures required in the plan provide effective erosion and sedimentation control and stormwater management.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 12-1-2004, § 5.1)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:walker-county/code/22-790@2026-07-09-bc1f37f926

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Walker County Code of Ordinances, Sec. 22-790. Notice of construction commencement | Georgia Commons