Sec. 28-115. Permit required to make connection.

Sobre este texto

  • As published by Municode, current through 2026-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Before the owner of any property connects such property into the Authority sewer, the owner or owner's agent shall make application to and be issued a permit (work order) by the Authority. The work shall be performed only by a plumbing contractor approved by the Authority. All connections shall be inspected and approved by the Authority.

(b) In order to secure the required connection permit, the owner or owner's agent shall make application at the Authority's office. The permit application shall be supplemented by any plans, specifications, or other information considered pertinent in the judgment of the Authority. A permit and inspection fee shall be paid to the Authority at the time the application for permit is filed.

(c) All connections to the public sewer and all building sewers from the building to the public sewer shall be inspected and approved by the building inspector before the underground portion is backfilled or covered.

(d) The applicant shall notify the building inspector when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the building inspector.

(e) Connections made without an approved application may be severed by order of the Authority. Such unapproved connection may be allowed to remain active if uncovered, inspected, and accepted; however, the owner shall be required to pay an unapproved/uninspected connection fee in lieu of the permit application fee in an amount double the current regular fee.

(f) No permit for a connection which may be used for discharge of industrial process wastes or other nondomestic wastes regulated by division 7 of article III of this chapter and which would cause the Authority to violate its NPDES permit, shall be issued except upon separate application to the Authority and approval of the discharge under the provisions of division 7 of article III.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. O-03-22, Exh. A, 11-10-2022)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:walker-county/code/28-115@2026-07-09-563ee3e15e

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Walker County Code of Ordinances, Sec. 28-115. Permit required to make connection | Georgia Commons