Ir al contenido
Georgia Commons
Menú

Washington County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 18 - ENVIRONMENT / Article II - GROUNDWATER RECHARGE AREA PROTECTION

Sec. 18-23. Permit requirements and enforcement.

Sobre este texto

  • As published by Municode, current through 2026-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The county will approve no building permit, rezoning request or subdivision plan unless the permit, request, or plan is in compliance with the groundwater protection standards listed in section 18-24.

(1) Enforcement. The county, its agent, officers and employees shall have the authority to enter upon privately owned land for the purpose of performing their duties under this article and may make or cause to be made such examinations, surveys or sampling as the county deems necessary.

a. An appointed enforcement authority is hereby designated as the administrator and enforcement officer for this article.

b. A person appointed by the county board of commissioners (hereinafter the "enforcement authority") shall have the authority to:

1. Enforce this article;

2. Issue permits hereunder; and

3. Address violations or threatened violations hereof by issuance of violation notices, administrative orders and civil and criminal actions. All costs, fees and expenses in connection with such actions may be recovered as damages against the violator.

c. Law enforcement officials or other officials having police powers shall have authority to assist enforcement authority in enforcement.

d. Any person who commits, takes part in or assists in any violation of any provision of this article shall be fined not more than $500.00 for each offense. Each violation shall be a separate offense and, in the case of a continuing violation, each day's continuance shall be deemed to be a separate and distinct offense.

e. The sheriff shall have the authority to issue cease and desist orders in the event of any violation of this article. Cease and desist orders may be appealed to a court of competent jurisdiction, as identified in section 18-25.

f. When a building or other structure has been constructed in violation of this article, the violator shall be required to remove the structure.

g. When removal of vegetative cover, excavation or fill has taken place in violation of this article, the violator shall be required to restore the affected land to its original contours and to restore vegetation, as far as practicable.

(2) Permit review and site plan requirement. With the exception of certain exempted activities identified in subsection (3) of this section, applications for a development permit within the groundwater recharge area district shall include a site plan. The following information is required for all site plans:

a. A map, drawn to a scale of one inch equals 50 feet or other approved scale, showing all planned improvements including the width, depth and length of all existing and proposed structures, roads, watercourses and drainage ways, water lines, wastewater and stormwater facilities and utility installations shall be provided by the applicant.

b. Location, dimensions and areas of all impervious surfaces, both existing and proposed, on the site.

c. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.

d. Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet.

e. Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.

f. Calculations of the amount of cut and fill proposed and cross sectional drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scale and vertical scale must be shown on cross sectional drawings.

g. Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform to the specifications of said site plan. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill or removal of the overall appearance of the development as proposed, can be amended only with the approval of the enforcement authority. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions are exempted from this requirement.

(3) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans:

a. Single-family detached homes constructed within a subdivision of fewer than five parcels.

b. Repairs to a facility that is part of a previously approved and permitted development.

c. Construction of minor structures, such as sheds or additions to single-family residences.

(4) Review procedures. The application shall be made to the county board of commissioners and will be reviewed within 60 days. The review period shall include the preparation of findings (approval, approval with conditions or disapproval) by the appointed enforcement authority. The applicant will receive written notification of the findings of the appointed enforcement authority. If the review process is not completed within 60 days, the application is considered to be approved. Decisions of the enforcement authority may be appealed to the board of commissioners.

(5) Public notice and public hearing. Public notice of permit applications, through publication in local newspapers, is required. A public hearing on the application, to be held before the county may be scheduled if requested by a citizen. Public announcement of the hearing shall be printed in a local newspaper of general circulation at least 15 but not more than 45 days prior to the hearing. A record of the proceedings shall be made and kept on file by the county. Any person may testify at the hearing. Decisions of the county may be appealed to a court of competent jurisdiction identified in section 18-25.

(6) Duration of permit validity.

a. If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire.

b. If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased.

c. Written notice of pending expiration of the development permit shall be issued by the appointed enforcement authority.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. No. WC-59, § 4, 1-11-2001)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:washington-county/code/18-23@2026-07-09-c296d0cdb7

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Washington County Code of Ordinances, Sec. 18-23. Permit requirements and enforcement | Georgia Commons