Washington County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 26 - PUBLIC PROPERTIES / Article II - COUNTY RIGHTS-OF-WAY / Division 4 - ABOVEGROUND AND BELOWGROUND UTILITIES
Sec. 26-149. Closing of trenches.
Sobre este texto
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Whenever open trenching is required for the installation or maintenance of utilities within the ROW, the work shall be so scheduled that not more than 500 feet of trench shall be open at any one time. More restrictive controls may be imposed where conditions warrant.
Insofar as possible work shall be scheduled so that open excavations will not be left overnight. Where trenches or pits are within the clear roadside areas and cannot be backfilled before leaving the job site, they shall be cordoned off and protected by reflectorized or lighted barricades as appropriate, or by other safety means as deemed appropriate.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.