Ir al contenido
Georgia Commons
Menú

Whitfield County · Código de ordenanzas

Chapter 13 - SITE CONSTRUCTION STANDARDS AND ROAD USE REGULATIONS / Article I - SITE CONSTRUCTION STANDARDS

Sec. 13-1. Earthwork.

Sobre este texto

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) The entire area within the typical grading section shall be cleared and grubbed of all trees, bushes, stumps and debris. Such debris shall be disposed of in a satisfactory manner, but in no instance, shall be used as fill in the road bed.

(b) Grading shall be accurately done to the lines and grades shown on the plans. Embankments shall be placed in uniform layers not to exceed six inches and compacted to a density of 95

percent of the maximum laboratory dry weight per cubic foot as determined by an approved method. Proof-rolling shall be accomplished prior to placement of embankments to detect soft spots.

Slopes in Cut or Fill Sections Depth of Cut or Fill Slopes (Maximum) 2 feet or less 4 to 1 2 feet to 5 feet 3 to 1 Over 5 feet 2 to 1 The depth of cut referenced in the table shall be construed to be the maximum cut or fill occurring in any one section of cut or fill. The slope on cut or fill shall be uniform throughout for each section of cut or fill. When a cut is made in rock that requires blasting, slope may be changed to vertical slope upon the written approval of the authorized county representative.

(c) After the earth work has been completed, all storm drainage and other underground utilities have been installed under the roadbed, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades and cross section shown on the plans. If

any sections of the subgrade are composed of unsuitable or unstable material, such material shall be removed to the depth directed by the road department and replaced with suitable, thoroughly compacted material. When the street is to be used for construction traffic before the paving

work is completed, a layer of No. 5 stone can be laid as a traffic surface if the developer so desires, provided:

(1) This material shall not be used as a part of the base material;

(2) It may be worked into the subgrade or it shall be removed before the base course is set up for paving;

(3) Provision shall be made to drain low points in road construction when the final paving surface is delayed.

(d) It shall be the responsibility of the developer to provide core samples to verify compaction requirements from a certified company to the

road department.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:whitfield-county/code/13-1@2026-05-11-67facbceb4

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Whitfield County Code of Ordinances, Sec. 13-1. Earthwork | Georgia Commons