(a) Sizing and location of all drainage structures shall be the responsibility of a registered professional land surveyor, subject to approval of
the road department.
Storm drainage pipes shall be sloped so as to maintain a minimum velocity of 3fps so that sediment will not collect.
State Highway Standard 1030D (or most current) shall be used in determining class (concrete) or gauge of pipe under fill, method of backfilling
and pipe installation, unless otherwise specified and approved by the road department.
Unless specified otherwise, the drainage formula used in determining size of drainage structure shall be determined by Q=CIA Formula.
Talbot's Formula shall use .80 run-off index or the equivalent.
Rational method shall use 50-year storm or rain as the stated frequency.
Drainage easements shall be a minimum of 20 feet wide when used as an open ditch. Piped storm drainage shall have a minimum easement width of 15 feet wide.
Catchbasins and/or drop inlets shall be designed by an engineer and subject to final approval by the road department.
Streetwater shall be limited to a maximum distance as follows: 400 feet on grades up to seven percent; 300 feet on grades from seven percent to ten percent; 250 feet on grades over ten percent.
Subdrainage will be installed to control the surplus groundwater by intercepting sidehill seepage or by lowering or regulating the groundwater level where such conditions exist.
Bridges shall be designed on a 50-year storm frequency.
(b) Cross drainpipes shall not be less than 18 inches in size when under the street and 15 inches under driveways.
Headwalls of a type approved by the county road department shall be required on inlet and outlet ends of the cross drain pipe.
A full shoulder width shall be maintained across all cross drains as the minimum length.
The maximum continuous length of side drain (ditch) pipe shall be 50 feet. A cleanout (open-top graded) catch basin shall be established at each 50-foot interval. The maximum continuous length of longitudinal pipe shall not exceed 300 feet.
Junction boxes having access to the pipe shall be constructed to meet the requirements of Georgia DOT Standard 1030D (or most current).
(c) Reinforced concrete pipe shall be used within the right-of-way. Pipe outside the right-of-way may be reinforced concrete, at the option of the owner, or other appropriate material.
Flat bottom and circular pipe sections shall be laid in a prepared trench with the socket ends pointing upstream. Sections shall be joined in accordance with manufacturer's instructions.
Metal pipe shall be fully coated.
Corrugated aluminum or steel pipe and pipearches sections shall be laid in a prepared trench with outside laps of circumference joints pointing
upstream and with longitudinal joints at the sides. Coupling bands, fastened by two or more bolts, shall join the sections. The space between adjoining sections shall be not more than the width of one corrugation.
All damaged spots in galvanized coating that expose the base metal shall be repaired before the structure is backfilled. All damaged spots in bituminous coating that expose the base metal shall be recoated with asphalt before the structure is
backfilled.
Elongation of metal pipes shall be as shown on the plans. The contractor shall order the elongation of the vertical axis of the pipe to be done in the shop. Corrugated metal pipe shall be shipped
with wire-tie in the pipe ends. Wire-ties shall be removed as soon as possible after the fill is completed.
(d) Before any traffic over a storm drain is allowed, the developer shall provide an adequate depth and width of compacted backfill to protect the structure from damage or displacement. Any debris or silt that constructs the flow through a pipe shall be removed by the developer as often as necessary to maintain drainage. All pipe structures shall be cleaned before the work is accepted.
Any damage or displacement that may occur due to traffic or erosion shall be repaired or corrected at the developer's expense. The developer's obligation to clean and repair pipes ceases after acceptance of the system by the county.
(e) Minimum clearances are one foot between the bottom of the roadway base and the exterior crown of the culvert. A minimum of 0.5 feet between underground utilities and exterior crown of culverts.
(f) Trench construction for storm drainage pipe shall be in accordance with standard drawings.