Chapter 14 - SITE DESIGN / Article IV - ROAD STANDARDS

Sec. 14-49. Minimum right-of-way and pavement widths.

Sobre este texto

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The minimum widths for right-of-way and pavement are as follows and are to be on the construction drawings:

Type Traffic volume (AADT) Number of lanes Right-of-way Width Local 0 — 4,999 1 lane each direction 50 (60 feet if no curb) Collector 5,000 — 9,999 1 lane each direction 80 Arterial 10,000 - 2 lanes each direction 100 or greater Minimum pavement width for any lane on any road is 12 feet.

On any existing street having a right-of-way less than the minimum which abuts a property being developed, one-half of the required width of right-of-way shall be dedicated at no cost to Whitfield County along the entire property boundary abutting the existing street.

Additional road right-of-way width may be required to be dedicated at intersections or other locations fronting the property where turning lanes, storage lanes, medians, islands, or realignments are required for traffic safety and minimum right-of-way standards would be inadequate to

accommodate the improvements.

If presented with a proposal that evaluates site-specific circumstances for new construction of local streets that will be part of an approved planned unit development (PUD, as defined in the Unified Zoning Ordinance), the county engineer, in his or her professional discretion, may allow a reduction in the required right-ofway width. Additionally, the county engineer, in his or her professional discretion, may allow

utility easements as substitution for rights-ofway. In such cases, the utility easement(s) shall be a minimum of 15 feet if provided along one

side of the right-of-way or a minimum of ten feet if provided along both sides of the right-of-way.

Utility construction shall occur outside the rightof-way and only within the provided easement(s). The county reserves the right to place equipment and facilities within the utility easement(s). Additionally, the county reserves the right to enter onto the utility easement(s) for the

purposes of maintenance and repair.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 6-9-03, § 4-4; Ord. No. 2019-090919, § 1, 9-9-19)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:whitfield-county/code/14-49@2026-05-11-efa405af9c