Whitfield County · Código de ordenanzas
Chapter 14 - SITE DESIGN / Article VI - STORMWATER MANAGEMENT
Sec. 14-76. Requirements for stormwater management plan.
Sobre este texto
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All stormwater management plans submitted to the county shall be submitted in accordance with the provisions as outlined in this article and the LDM.
(1) The stormwater management plan shall be prepared under the supervision of,
and certified by a professional engineer, professional land surveyor, or registered landscape architect with competency in
hydrology and hydraulics, currently registered in the State of Georgia and who shall maintain at all times in full force and effect Errors and Omissions Liability Insurance Coverage in an amount of not less than $1,000,000.00 per occurrence. The plan shall conform to the requirements of this article.
(2) Upon receipt of the stormwater management plan, the county shall perform appropriate reviews, and shall either
approve the stormwater management plan or return comments and reasons for rejection.
Historia
(Ord. of 12-01-06, §§ 2, 3)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.