Whitfield County · Código de ordenanzas
Chapter 14 - SITE DESIGN / Article VI - STORMWATER MANAGEMENT
Sec. 14-77. Permit procedures and requirements.
Sobre este texto
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Permit application requirements. No owner or developer shall perform any land development activities without first meeting the requirements of this article prior to commencing the proposed activity. Unless otherwise exempted by this article, or granted a waiver to meeting the minimum requirements outlined in the Whitfield County Stormwater LDM, a site development permit application shall be accompanied by the following items in order to be considered:
(1) Stormwater concept plan and consultation meeting certification if required by Whitfield County;
(2) Stormwater management plan and certificate of applicable liability insurance;
(3) Inspection and long term maintenance agreement;
(4) Performance bond, if applicable; and,
(5) Site development permit application and applicable review fees.
(b) Stormwater concept plan and consultation meeting. Projects that are complex in nature may require a stormwater concept plan and consultation prior to submittal of design plans for review by the county. The stormwater concept plan
shall meet the requirements outlined in the LDM. Stormwater concept plans and consultation meetings are encouraged for all projects prior to submittal of engineering plans for review.
For the purposes of this section, any proposed development activity that meets any of the following criteria shall be required to perform a stormwater concept plan and consultation meeting prior to submittal of engineering plans for review.
(1) Any residential subdivision with greater than 50 lots, unless such development contains exclusively two acre or larger lots.
(2) Any non-residential development with a disturbed area of ten acres or larger.
(3) Any non-residential development regardless of size which has an impervious surface coverage that covers 50 percent
or more of the property excluding those lands contained within undisturbed buffers including but not limited to floodplains, stream buffers and
undisturbed buffers between dissimilar zonings.
(4) Any non-residential development regardless of size which is defined as a "hot spot" land use.
(c) Stormwater management plan requirements. A stormwater management plan must be submitted in accordance with the LDM.
(d) Modifications for off-site facilities. The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made with the
county to manage stormwater by an off-site, or regional facility. The off-site or regional facility:
(1) must be located upon property legally dedicated for the purpose, (2) must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices, and (3) there must be a county approved, legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to address stormwater management issues upstream and downstream from the development site to the off-site or regional facility.
A stormwater management plan must be submitted to Whitfield County which shows the adequacy of the off-site or regional facility.
To be eligible for a modification, the applicant must demonstrate to the reasonable satisfaction of Whitfield County that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas:
(1) Increased threat of flood damage to public health, safety, welfare, and property;
(2) Deterioration of existing culverts, bridges, dams, and other structures;
(3) Accelerated streambank or streambed erosion or siltation;
(4) Degradation of in-stream biological functions or habitat; or
(5) Water quality impairment in violation of State of Georgia water quality standards, and/or violation of any state or federal regulations.
Historia
(Ord. of 12-01-06, §§ 2, 3; Ord. No. 2020-1214, § 3, 12-14-20)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.