Ciudad: Norcross
Norcross Architectural Review Board: reunión, 18 de noviembre de 2025
6:00 p.m. · 3 páginas
Estas son las actas tal como las publicó Norcross Architectural Review Board, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Norcross Architectural Review Board.
Registros de esta reunión
Cada enlace abre el sitio web o el portal de reuniones del propio órgano.
- ActasArchitectural Review Board Meeting Minutes 11.18.2025 (norcrossga.api.civicclerk.com) · se muestra en esta página
Resumen
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.
Architectural Review Board unanimously approved a two-story office warehouse on Goshen Springs Road and rooftop solar at 408 Autry Street.
The Architectural Review Board approved two certificates of appropriateness and chose a vice chair. It approved construction of a two-story office warehouse at 5956 Goshen Springs Road, after brief discussion of the exterior finish system (EIFS), floor layout, multi-tenant use and landscaping, with four conditions. It also approved a roof-mounted solar panel system on a single-family home at 408 Autry Street, with conditions. Each approval was unanimous. The board appointed a member as Vice-Chair, also unanimously, and approved the minutes of the October 21, 2025 meeting. The minutes record no appointment of a secretary.
Temas tratados: 5956 Goshen Springs Road office warehouse; 408 Autry Street solar panels; EIFS exterior finish; Vice Chair appointment; certificate of appropriateness; October 21, 2025 minutes.
Decisiones que constan en las actas (3)
Después de cada decisión va la oración de las actas que la registra, copiada palabra por palabra, en inglés.
Construction of a two-story office warehouse at 5956 Goshen Springs Road with conditions
unanimous
Las actas: “A motion to approve the construction of a two-story office warehouse at 5956 Goshen Springs Road, with the following conditions:”
Roof-mounted solar panel system on a single-family residence at 408 Autry Street with conditions
unanimous
Las actas: “A motion to approve the addition of a roof-mounted photovoltaic/solar panel system to a single-family residence at 408 Autry Street, with the following conditions:”
Appointment of Barbara Grayson as Vice-Chair of the Architectural Review Board
unanimous
Las actas: “A motion to appoint Barbara Grayson as Vice-Chair of the Architectural Review Board.”
Las actas
Tal como se publicó en norcrossga.api.civicclerk.com, leído el 12 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.
City of Norcross 65 Lawrenceville Street Norcross, GA 30071 Meeting Minutes Tuesday, November 18, 2025 6:00 PM 2nd Floor Community Room Regular Meeting Jeff Hopper, Chair Cindy Flynn Naim Harrison Bill McLees Barbara Grayson Livestream Here:
Regular Meeting Minutes November 18, 2025 City of Norcross Architectural Review Board (ARB) Page 2 of 3
B. Roll Call
C. Approval of Previous Meetings Minutes
1. 2025-334: Presentation of Previous Minutes A motion to approve the minutes of the Architectural Review Board Meeting of October 21, 2025.
RESULT: APPROVED [UNANIMOUS]
MOVER: Jeff Hopper, Board Chair SECONDER: Hugh Cooper, Board member AYES: Hopper, Cooper, McLees, Grayson, Harrison
D. Unfinished Business
E. New Business
1. 2025-332: COA2025-047 5956 Goshen Springs Road
• The Board Members briefly discussed the proposed EIFS (Exterior Insulation and Finish System) component to the new building, the floor layout and multi-tenant component, and landscaping. After a brief discussion, the ARB moved to vote on the request with staff’s recommendations listed below:
A motion to approve the construction of a two-story office warehouse at 5956 Goshen Springs Road, with the following conditions:
1. The applicant is reminded that this approval assumes general conformance with the adopted City of Norcross Architectural and Site Design Standards and Unified Development Ordinance. The applicant and/or builder is responsible for conforming with any specific design standard or UDO code section not addressed in the staff report and Architectural Review Board approval.
2. The applicant will be required to install the tree density units as specified by the Arborist as well as all other landscaping and foundation plantings as required by the Architectural Design Standards and the Unified Development Ordinance, if applicable.
3. Any changes from the Architectural Review Board approved component shall require ARB approval at another public hearing.
4. An architectural inspection shall occur prior to release of the certificate of completion or occupancy to confirm compliance with the ARB’s approval.
2. 2025-331:
RESULT: APPROVED [UNANIMOUS]
MOVER: Barbara Grayson, Board member SECONDER: Bill McLees, Board member AYES: Hopper, Cooper, McLees, Grayson, Harrison COA2025-048 408 Autry Street
• The Board discussed the supplemental use standards and permit review.
• The applicant, Seth Gunning, discussed the location of the roof-mounted solar panel and the importance of the solar panel facing south year-round.
A. Call to Order
Regular Meeting Minutes November 18, 2025 City of Norcross Architectural Review Board (ARB) Page 3 of 3
• After a brief discussion, the ARB moved to vote on the request with staff’s recommendations below.
A motion to approve the addition of a roof-mounted photovoltaic/solar panel system to a single-family residence at 408 Autry Street, with the following conditions:
o The applicant is reminded that this approval assumes general conformance with the adopted City of Norcross Architectural and Site Design Standards and Unified Development Ordinance.
The applicant and/or builder is responsible for conforming with any specific design standard or UDO code section not addressed in the staff report and Architectural Review Board approval.
o Any changes from the Architectural Review Board-approved component shall require ARB approval at another public hearing.
o An architectural inspection shall occur prior to release of the certificate of completion or occupancy to confirm compliance with the ARB’s approval.
3. 2025-333:
RESULT: APPROVED [UNANIMOUS]
MOVER: Bill McLees, Board member SECONDER: Barbara Grayson, Board member AYES: Hopper, Cooper, McLees, Grayson, Harrison Discussion and appointment of the Vice Chair and Secretary for the Architectural Review Board (ARB) A motion to appoint Barbara Grayson as Vice-Chair of the Architectural Review Board.
RESULT: APPROVED [UNANIMOUS]
MOVER: Jeff Hopper, Board Chair SECONDER: Hugh Cooper, Board member AYES: Hopper, Cooper, McLees, Grayson, Harrison
F. ADDITIONAL INPUT AND/OR DISCUSSION NOT OTHERWISE ADDRESSED BY THIS
AGENDA
G. Adjourn