Ir al contenido
Georgia Commons
Menú

Ciudad: Richmond Hill

Richmond Hill Architectural Review Board: reunión ordinaria, 17 de septiembre de 2026

2 páginas

Estas son las actas tal como las publicó Richmond Hill Architectural Review Board, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Richmond Hill Architectural Review Board.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.

Architectural Review Board approved signs for Avid/Candlewood Suites and Royal Ace Hardware, plus Royal Ace's revised elevations, and tabled the Love Hazel sign.

The Architectural Review Board met with three members present and took up signs and building elevations. It tabled the building sign for Love Hazel at 11254 Ford Avenue until the next meeting so a representative can attend, after saying the sign was too small compared with the neighboring sign. It approved the Avid/Candlewood Suites sign at 4330 Highway 17 on the condition that the base be oversized brick painted grey or another material allowed in the overlay. It approved two building signs for Royal Ace Hardware at 2415 Highway 17 on the condition that all other signs are removed. The board tabled, then reopened, the revised Royal Ace elevations, and approved them as submitted after a color sample was shown, recommending that the downspouts be painted to match. The board also said it wants qualified representatives and material and color samples at future reviews.

Temas tratados: Love Hazel building sign; Avid/Candlewood Suites sign; Royal Ace Hardware signs; Royal Ace Hardware building elevations; overlay district materials; representatives and color samples at meetings.

Decisiones que constan en las actas (4)

Después de cada decisión va la oración de las actas que la registra, copiada palabra por palabra, en inglés.

  1. Revised building elevations for Royal Ace Hardware at 2415 Highway 17, with downspouts painted to match

    Aprobadounanimous

    Las actas: “Jennifer Sheahan made a motion to approve as submitted with the recommendation that they paint the downspouts this color to match the metal accent being painted, which was seconded by Georgene Brazer and carried by all.”

    Leer este punto en las actas

  2. Avid/Candlewood Suites sign at 4330 Highway 17 with grey painted brick base condition

    Aprobadounanimous

    Las actas: “Jennifer Sheahan made a motion to approve the sign with the condition that the base be made of an oversized brick painted grey or other materials allowed in the overlay, which was seconded by Georgene Brazer and carried by all.”

    Leer este punto en las actas

  3. Two building signs for Royal Ace Hardware at 2415 Highway 17, with other signs removed

    Aprobadounanimous

    Las actas: “Jennifer Sheahan made a motion to approve”
  4. Building sign for Love Hazel at 11254 Ford Avenue

    Aplazadounanimous

    Las actas: “Jennifer Sheahan made a motion to table the sign until the next meeting when a representative can be present, which was seconded by Georgene Brazer and carried by all.”

    Leer este punto en las actas

Puntos del orden del día (5)

Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.

  1. 4. SIGNAGE:Una votación
  2. 5. EXTERIOR BUILDING ELEVATIONS:Aplazado
  3. 6. OTHER ITEMS FOR DISCUSSION
  4. 7. RE-OPENING ITEM 5(a) FOR DISCUSSION:Aprobado
  5. 8. ADJOURNMENTUna moción

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Las actas

Tal como se publicó en richmondhill-ga.gov, leído el 12 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.

ARCHITECTURAL REVIEW BOARD

SEPTEMBER 17, 2026 2:30 PM

MEETING MINUTES

MEMBERS PRESENT: Jack Giddens, Georgene Brazer, Jennifer Sheahan STAFF PRESENT: Director Brian Crooks, Asst. Dir. Amanda Styer GUESTS PRESENT: Bubba Beasley, Coby Royal, Jon Royal

1. CALL TO ORDER Jack Giddens called the meeting to order at 2:30 PM

2. APPROVAL OF THE SEPTEMBER 17, 2026 AGENDA Jennifer Sheahan made a motion to Approve the September 17, 2026 agenda, which was seconded by Georgene Brazer and carried by all.

3. APPROVAL OF THE AUGUST 20, 2026 MINUTES Georgene Brazer made a motion to approve the August 20, 2026 meeting minutes, which was seconded by Jennifer Sheahan and carried by all.

4. SIGNAGE:

a) Approval/disapproval of the building sign for Love Hazel, located at 11254 Ford Avenue.

ARB felt the sign was too small, Director Crooks stated Dixon & Lasseter’s sign (next door) is 36” x 140” and they felt the LH sign should be larger and more similar size to D&L and fill the gable space better. They felt the lettering should be bolder to make it more visible.

Jennifer Sheahan made a motion to table the sign until the next meeting when a representative can be present, which was seconded by Georgene Brazer and carried by all. The board requests that a rep be present at the next meeting.

b) Approval/disapproval of the signage for Avid/Candlewood Suites, located at 4330 Highway 17.

ARB was concerned about the aluminum material on the structure. Mrs. Sheahan felt the painted metal would chip over time. Director Crooks explained this hotel was built before the property was in the overlay, but the sign is being submitted after the property was added to the overlay, so the building has material on it that wouldn’t be allowed in the overlay. The ARB preferred the base of the sign be brick painted the grey color shown instead of the aluminum material. Jennifer Sheahan made a motion to approve the sign with the condition that the base be made of an oversized brick painted grey or other materials allowed in the overlay, which was seconded by Georgene Brazer and carried by all. Bubba Beasley, the representative from Sign Mart stated he’d send an updated rendering to reflect these conditions.

c) Approval/disapproval of the building signs for Royal Ace Hardware, located at 2415 Highway 17.

Asst. Director Styer explained that the applicant has stated they would be removing all of the existing building signs and only putting these two new signs on the building. Coby Royal explained the signs currently on bldg. are old and these will give nice fresh look.

Asst. Director Styer stated that the 2 proposed signs meet all sign regulations such as quantity, size, and color requirements. Jennifer Sheahan made a motion to approve

the signs as submitted with the condition that all other signs are removed, which was seconded by Georgene Brazer and carried by all.

5. EXTERIOR BUILDING ELEVATIONS:

a) Approval/disapproval of the revised building elevations for Royal Ace Hardware, located at 2415 Highway 17.

Director Crooks stated that the applicant had appeared previously before ARB and has now revised what they’d like to do. He now plans to only paint the metal accent feature along the upper portion of the building. He stated that the color meets requirements and is a shade of white. Coby stated the color is a gray color not white and that the color sample picture in the packet is lighter than it actually is. ARB asked if he had the color swatch and he said at his business down the road. Jennifer Sheahan made a motion to table the item until later in the meeting so the applicant could retrieve a color swatch, which was seconded by Georgene Brazer and carried by all.

6. OTHER ITEMS FOR DISCUSSION

ARB asked if the agenda order can be modified when a meeting begins to move items with a representative in attendance up on the agenda and Director Crooks confirmed that can be done. ARB expressed wanting qualified representatives to be present during the ARB meetings moving forward, meaning a person who can appropriately discuss the item.

ARB also expressed wanting to require material and color samples to be provided for exterior building elevation reviews moving forward. Director Crooks reminded the board that they (serving as HPC) will have a DCA training session on December 9, 2026 at 9am.

7. RE-OPENING ITEM 5(a) FOR DISCUSSION:

Jennifer Sheahan made a motion to re-open item 5(a) Royal Ace Hardware building elevations for discussion, which was seconded by Georgene Brazer and carried by all. Coby Royal provided a color sample which was darker than it appeared to be in the packet.

Jennifer Sheahan made a motion to approve as submitted with the recommendation that they paint the downspouts this color to match the metal accent being painted, which was seconded by Georgene Brazer and carried by all.

8. ADJOURNMENT

Jennifer Sheahan made a motion to adjourn which was seconded by Georgene Brazer and the meeting closed at 4:15 PM.

Legible por máquinas https://georgiacommons.org/meetings/2026-09-17/richmond-hill-architectural-review-board.md · https://georgiacommons.org/meetings/local/index.md · MCP https://mcp.georgiacommons.org/mcp

Richmond Hill Architectural Review Board: reunión ordinaria, 17 de septiembre de 2026 | Georgia Commons