Ciudad: Richmond Hill
Richmond Hill Architectural Review Board
Actas de Richmond Hill Architectural Review Board: 25, del 2024-01-18 al 2026-09-17.
Qué contiene esta colección y qué deja fuera
- Georgia Commons holds a body's meetings only from the dates shown, and only the records the body has posted: a meeting with no posted record is not here.
- Each record's text is read from the file the body posted; the file's address is kept with it.
- Summaries, topics, and decision lists are written by AI from the record and labeled; they are never the record.
- 6 posted records of this body are scanned images with no text layer and are not included.
El sitio web del propio órgano: richmondhill-ga.gov
Para máquinas: https://georgiacommons.org/meetings/richmond-hill-architectural-review-board.md
Reuniones
Reunión ordinaria, 17 de septiembre de 2026
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved signs for Avid/Candlewood Suites and Royal Ace Hardware, plus Royal Ace's revised elevations, and tabled the Love Hazel sign.
Reunión ordinaria, 20 de agosto de 2026
Resumen de Georgia Commons (escrito por IA): Architectural board approved signage for Innovative Orthodontics and elevations for two LUV Car Wash sites, and tabled the Avid/Candlewood Suites sign.
Reunión ordinaria, 16 de julio de 2026
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved the building elevations for the Coastal Empire Periodontics addition at 1075 Gandy Dancer, with materials matching the original building.
Reunión ordinaria, 18 de junio de 2026
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved building elevations for Lot 11 Interchange Drive, Parker's Kitchen and the Shell C-Store renovation, without signage approval.
Reunión ordinaria, 21 de mayo de 2026
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved signage for Enmarket and elevations for iONNA, and required a redesigned South Elevation for Public Storage.
Reunión ordinaria, 16 de abril de 2026
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved elevations for Horizon Behavioral Health and the HCA Memorial clinic with conditions, and tabled the iONNA and Love Hazel items.
Reunión extraordinaria, 31 de marzo de 2026
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved two bank and collision shop signs with conditions and tabled Horizon Behavioral Health's building elevations pending better renderings.
Reunión ordinaria, 19 de febrero de 2026
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved signs for Navy Federal, Yum Yum and the city's Richmond Heights freestanding sign, all by unanimous vote.
Reunión ordinaria, 18 de diciembre de 2025
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved the sign base material for Southern Shores Family Care and the Royal ACE Hardware exterior addition.
Reunión ordinaria, 20 de noviembre de 2025
Resumen de Georgia Commons (escrito por IA): Architectural board approved Publix paint colors, Hupman Group building elevations with rear metal panels, and several signs, while holding one sign base for review.
Reunión ordinaria, 16 de octubre de 2025
Resumen de Georgia Commons (escrito por IA): Architectural Review Board tabled Publix and initial Torch'd paint requests and approved the Way Station Food Pantry elevations and the Torch'd sign.
Reunión extraordinaria, 28 de agosto de 2025
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved signs for Home on the Hill, Camellia Row and Cadance Bank, the latter two with conditions.
Reunión extraordinaria, 28 de agosto de 2025
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved signs for Home on the Hill, Camellia Row and Cadance Bank, two with conditions.
Reunión ordinaria, 17 de julio de 2025
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved signage for 10 Federal Storage and, with a condition, for Richmond Hill Karate.
Reunión ordinaria, 17 de abril de 2025
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved reconsidered elevations for 10512 Ford Avenue with eleven conditions and approved signs for Audio Nova and Jersey Mike's Subs.
Reunión ordinaria, 20 de marzo de 2025
Resumen de Georgia Commons (escrito por IA): Architectural board approved a Dunkin Donuts sign and Ford Ave elevations, and partly denied Community House elevations for the chapel and hyphen area.
Reunión ordinaria, 17 de octubre de 2024
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved revised building elevations for the 10 Federal Self Storage facility on Highway 17, formerly Richmond Hill Climate Storage.
Reunión ordinaria, 19 de septiembre de 2024
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved Parker's Kitchen signage and Sherwin Williams signage, elevations and site plan recommendation; the Integrative Behavior Analysis motion has no recorded result.
Reunión ordinaria, 18 de julio de 2024
Resumen de Georgia Commons (escrito por IA): Review board approved a Miller Cleaning Service sign and conditioned elevations for Southern Shore Family Care; the site plan recommendation result is not recorded.
Reunión ordinaria, 20 de junio de 2024
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved three signs, tabled one pending a corrected rendering, and recommended council approve a setback variance for Amber & Fig.
Reunión ordinaria, 16 de mayo de 2024
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved a monument sign for 28 Laurel St. and building elevations for a restaurant at 11026 Ford Ave.
Reunión ordinaria, 18 de abril de 2024
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved a Honey Bee Auto sign, Cedar Animal Hospital changes, and periodontics elevations, and recommended two site plans to the Planning Commission.
Reunión ordinaria, 21 de marzo de 2024
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved the City Hall exterior renovation with a roof choice left to council, plus three business items, and tabled the Cedar Animal Hospital project.
Reunión ordinaria, 15 de febrero de 2024
Resumen de Georgia Commons (escrito por IA): Architectural Review Board approved the SGA Dental Office Building elevations with required changes and tabled Carpet Store Plus color changes for lack of a representative.
Reunión ordinaria, 18 de enero de 2024
Resumen de Georgia Commons (escrito por IA): Architectural board tabled the SGA Dental Office Building elevations for design changes and recommended the site plan for Planning Commission approval, with a condition.