Título 12. CONSERVATION AND NATURAL RESOURCES · Capítulo 5. WATER RESOURCES · Artículo 5. RIVERS AND RIVER BASINS · Parte 3. DAM SAFETY
12-5-377. Dam removal.
Actualizado hasta: Including Acts of the 2025 Regular Session of the General Assembly.
El texto siguiente es la ley tal como la imprime el estado, en inglés.
- (a)
It shall be unlawful for the owner or operator of any dam for which a permit is required by this part to remove the dam without the approval of the director.#
- (b)
Prior to the commencement of removing any such dam, such owner or operator shall apply to the director on forms supplied by the division for permission to remove the dam.#
- (c)
Within 60 days after the receipt of a completed application for removal, the director shall approve, or approve subject to appropriate conditions, the applicant’s request for removal.#
- (d)
Upon receipt of approval for removal, the removal shall be commenced as soon as practicable; and the impoundment shall be drained and the structure permanently breached.#
- (e)
Nothing in this part shall be construed to prevent the owner or operator of any impoundment from draining such impoundment without authorization from the director.#
History
Ga. L. 1978, p. 795, § 8.
Leer la página oficial (el PDF del estado, abierto en la página de la que se leyó este texto).
Actualizado hasta: Including Acts of the 2025 Regular Session of the General Assembly.
Texto leído de t12-(v10)-2021-pdf.pdf, Volumen V10, edición 2021, páginas 597 a 598; acción de fusión: carried; SHA-256 del archivo a1ca11f804f2.