Título 36. LOCAL GOVERNMENT · Capítulo 39. STREET IMPROVEMENTS
36-39-7. Payment for street improvements and construction of water, gas, and sewer connections; payment of costs of connections.
Actualizado hasta: Including Acts of the 2025 Session of the General Assembly of Georgia.
El texto siguiente es la ley tal como la imprime el estado, en inglés.
Whenever the petition provided for in subsection (b) of Code Section 36-39-3 is presented or when the governing body has determined to improve any street and has passed the resolution provided for in subsection (a) of Code Section 36-39-3, the governing body shall have the power to enact all such ordinances and to establish all such rules and regulations as may be necessary to require the owners of all the property abutting on the improvement and of any railway in the street to pay the cost of such improvement and to cause to be put in and constructed all water, gas, or sewer pipe connections to connect with any existing water, gas, or sewer pipes in and underneath the streets where such improvement is to be made. All cost and expense of making water, gas, or sewer pipe connections shall be taxed solely against the property abutting on the improvement; but such cost and expense shall be included and made a part of the general assessment to cover the cost of the improvement.
History
Ga. L. 1927, p. 321, § 6; Code 1933, § 69-406.
Leer la página oficial (el PDF del estado, abierto en la página de la que se leyó este texto).
Actualizado hasta: Including Acts of the 2025 Session of the General Assembly of Georgia.
Texto leído de t35-t36-ch1-59-(v27)-2025-pdf.pdf, Volumen V27, edición 2025, página 829; acción de fusión: bound only; SHA-256 del archivo 6c7b6bcea397.