Canton · Ordenanza de zonificación
Artículo III. CONSTRUCTION STANDARDS
23 secciones
Contenido
- Sec. 114-121. Permit required
- Sec. 114-122. Application for connection permit
- Sec. 114-123. Separate service to separate buildings
- Sec. 114-124. Utilization of previously used pipes and materials
- Sec. 114-125. Compliance with technical codes
- Sec. 114-126. Elevation of wastewater connections
- Sec. 114-127. Conditions to determine if building may be served by system
- Sec. 114-128. Connection of downspouts or drains to wastewater system
- Sec. 114-129. Water and wastewater connections
- Sec. 114-130. Restoration of disturbed public property
- Sec. 114-131. Backflow prevention
- Sec. 114-132. Temporary water supply standpipes
- Sec. 114-133. Capping and sealing of discontinued connections
- Sec. 114-134. Location of water meters
- Sec. 114-135. Wastewater lift stations
- Sec. 114-136. City approval of construction plans
- Sec. 114-137. Fire hydrant installation and repairs
- Sec. 114-138. Fire service metering requirements
- Sec. 114-139. Extension of mains
- Sec. 114-140. Specifications
- Sec. 114-141. Main extensions to developed areas
- Sec. 114-142. Main extensions to other areas
- Secs. 114-143—114-170. Reserved