Section 300-37. Grading plan.
Sobre este texto
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
When required, grading plans shall include:
(1) All information required under Subsection 300-24(b) (unless included elsewhere in the plans);
(2) Topographic layout proposed grading of the development must be at two-foot (maximum) contour intervals based on mean sea level datum;
(3) Site grading plans superimposed over existing drainage structures. Drainage area that contributes to each existing structure shall be specified or shown;
(4) Location, and construction details, and design criteria of accessory structures (headwalls, drainage ditches, catch basins, junction boxes, drop inlets, retention areas, and retention outlet controls) shall be provided on plan and/or detail sheet;
(5) Maximum cross-slope on sidewalks is three percent, on other pavement, six percent;
(6) Northern and eastern coordinates shall be shown for all stormwater and sanitary sewer appurtenances;
(7) Bicycle and/or pedestrian-safe grates specified as appropriate for all drain inlets;
(8) Top and bottom elevations indicated for all walls, steps and ramps;
(9) Drainage at intersections indicated by flow arrows on plan;
(10) The 100-year floodplain limits and elevations, or note absence (specify latest floodplain map and panel);
(11) Structural detail and dimension of the detention pond including section through detention pond, dam or wall;
(12) All retaining walls over four feet in height must be certified by a structural engineer licensed in the State of Georgia;
(13) Ingress/egress easement from a public street to stormwater detention structure and maintenance easement to include the surface area ten feet outside the area inundated by the 100-year storm event. The ingress/egress easement shall be a minimum of 20 feet wide with a grade of 20 percent or less;
(14) Detail of outlet control structure;
(15) Show limits of actual grading (plus ten-foot grading buffer at the bottom of proposed slopes) outside of the root protection zone for all trees to remain;
(16) Establish easements for dedication of all stormwater drainage features directing concentrated flows across property lines as directed by the City;
(17) All development must satisfy the requirements of this UDO concerning potential flood areas;
(18) Show or indicate whether the site is part of and in compliance with a master/parent stormwater management plan;
(19) Water quality BMPs as recommended in the 2016 edition of the Georgia Stormwater Management Manual, Volumes 1, 2 and 3. For any project that requires a land disturbance permit the project shall consider water quality. The following BMPs may be used:
a. Wet ponds (extended detention for less than 20 acres)—ED-micro pool;
b. Extended dry detention ponds;
c. Wetland-constructed;
d. Infiltration trenches;
e. Dry swales;
f. Sand filter;
g. Bio-retention;
h. Vegetated filtration systems; and
i. Any other best management practice approved by the City Engineer.