Ir al contenido
Georgia Commons
Menú

Harris County · Ordenanza de zonificación

Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 2 - STORMWATER MANAGEMENT

1014.02. Standards for stormwater

Sobre este texto

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

management.

(a) All stormwater detention facilities shall be designed to detain the 1-year storm runoff, for the area draining to the pond, for 24 hours. For the project, this volume, called the channel protection volume, shall be equal to or greater than the 1-year storm runoff volume from the project. In addition, these facilities shall control the peak flow rates associated with storms having 2-year, 5-year, 10-year, and 25-year return frequencies so that flows from the developed site do not exceed those associated with predevelopment conditions at the project boundary nor increase the peak flows downstream from the project to the point in the drainage basin where the project area is 10% of the total basin. Where adverse impacts occur during the 100-year storm, the 100-year storm shall also be regulated.

(b) To eliminate detention facilities for stormwater, a registered design professional shall evaluate the basin utilizing the ten percent rule as defined in the current edition of the "Georgia Stormwater Management Manual." The design professional shall demonstrate that post-developed peak flows at the ten percent point of analysis are not increased for all storm events up to and including the 25-year storm. Where adverse effects occur for the 100-year storm, the 100-year storm shall also be regulated.

(c) Non-detained, post development runoff shall leave the project site as sheet flow and will not have an adverse impact on downstream properties.

(d) As part of the hydrological study, the design professional shall complete a downstream analysis in accordance with the current edition of the "Georgia Stormwater Management

Manual." Consideration shall be given to the flow capacity of downstream drainage structures from the property line up to and including the 10% point of analysis. If the downstream system is inadequate, the developer is required to either improve the downstream drainage structure or provide additional storage in the detention facility.

(e) In approved cases, damming a natural basin with minimal clearing may provide the detention. In such cases:

(1) The required discharge structure opening must be large enough to prevent stoppage from leaves and other debris

naturally occurring. Also, the volume should be adequate to account for natural growth of vegetation.

(2) Documentation shall be provided for the natural drainage way that it is not

jurisdictional state waters or for an approved Georgia EPD Buffer Variance Application.

(3) Documentation shall also be provided showing compliance with the Clean Water

Act Section 404, permitting requirements.

(4) Fencing of natural ponds shall be considered by the Public Works Director on a case-by-case basis.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:harris-county/zoning/1014.02@2023-12-05-aaa53e48ef

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Harris County Zoning Ordinance, 1014.02. Standards for stormwater | Georgia Commons