Ir al contenido
Georgia Commons
Menú

Harris County · Ordenanza de zonificación

Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 2 - STORMWATER MANAGEMENT

1014.03. Stormwater detention facility

Sobre este texto

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

location criteria.

For purposes of these regulations, a detention facility shall be deemed to consist of the area within the maximum design ponding limits, the dam (if one) including all embankment slopes and wall footings (if applicable), primary and emergency outlet works, any drainage and access easements, and any energy dissipation devices.

(a) In residential subdivisions, any required retention and/or detention areas shall be incorporated into the common areas of

the residential development or incorporated into an individually platted parcel, which the homeowners association shall be responsible for its maintenance and continuing operation.

(b) In nonresidential subdivisions, the detention facility may be located on a separate lot and owned by a property owners'

association, which shall be responsible for its maintenance and continuing operation; or located on each lot within the subdivision and constructed when the lot is developed.

(c) In multi-family and nonresidential development projects, separate detention facilities shall be provided for each

development. The owner of the property shall be responsible for maintenance and continuing operation of the facility.

(d) The county may approve stormwater detention facilities serving 2 or more developments, provided that private ownership of the facilities and provisions for their perpetual maintenance and

continuing operation are clearly established in a manner acceptable to the County attorney.

(e) No portion of any detention facility shall disturb any required (as opposed to

voluntary) buffer not otherwise authorized without first obtaining the required

approvals.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:harris-county/zoning/1014.03@2023-12-05-bed6091c9b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Harris County Zoning Ordinance, 1014.03. Stormwater detention facility | Georgia Commons