6.11.07. Storm Water Detention Facilities

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Each project shall provide stormwater controls such that predevelopment peak flow rates are maintained, unless otherwise approved by Division Manager of Stormwater Management or his/her designee

B. Storms with a statistical rate ofreturn of two (2), five (5), ten (10), twenty-five (25), fifty (50), and one hundred (100) years shall be evaluated and controls created to attenuate peak flows.

C. Responsibility for calibration and application of the empirical equations rests with the design engineer.

D. Times of concentrations ofless than ten ( 10) minutes for existing/undeveloped conditions are not acceptable for design nor are runoff percentages CN's higher than fifty-five (55) for on-site area, without supporting documentation acceptable to the City of Kennesaw Stormwater Management Division.

E. Hydrologic calculations must employ an engineering methodology currently recognized and accepted within the industry. This methodology must include a hydrograph routing analysis, which generates an inflow hydrograph to the detention pond to create an outflow hydrograph. Multiple inflow hydrographs shall be combined on a real time basis. Multiple outflow hydrographs shall be combined on a real time basis. Multiple detention ponds in series must be routed from one to the next and so on throughout.

F. A hydrograph routing analysis shall be submitted for all proposed areas drainage structures, which intercept more than three hundred twenty (320) acres (one-half (1/~) square mile).

G. Where existing developed sites are changed, only those portions of the site, which are unchanged, are "grandfathered" as existing conditions for allowable runoff calculations. That is, impervious areas will be grandfathered as "existing conditions" in only those areas that are not changed, modified, or improved and constitute less than forty percent (40%) of the total impervious area. The calculated allowable flow from all areas razed and reformed must be considered in the undeveloped condition.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2012-03, 5-7-12)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:kennesaw/zoning/6.11.07@2026-11-11-54057b7c9b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Kennesaw Zoning Ordinance, 6.11.07. Storm Water Detention Facilities | Georgia Commons