Ir al contenido
Georgia Commons
Menú

Kennesaw · Ordenanza de zonificación

Appendix A - UNIFIED DEVELOPMENT CODE

6.11.08. Stormwater Hydrologic Methodology.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. The design professional engineer may utilize any industry-accepted methodology for creating hydrologic design which routes a hydro logic model of the storm through the detention pond and outlet control structure and generates a related hydrologic model for output. All storms from two (2) year to the one hundred (100) year event shall be analyzed and controlled such that corresponding peak flows leaving the site are not increased.

B. To expedite City of Kennesaw's review, the hydrologic study for the project must include the listing of input parameters:

1. Drainage areas in acres;

2. Time of concentration/lag time;

3. Amount or percentage of impervious area within the drainage area both before and after the project;

4. Length, in feet, of all drainage system improvements along the route; and,

5. Soil Conservation Services (SCS) curve numbers estimates for before and after project conditions.

C. Analysis of stream flow and backwater elevations shall be consistent with FEMA's accepted methodologies whether or not the project is within a Federal Emergency Management Agency (FEMA) Flood Zone. The U.S. Army Corps of Engineers' standard step HEC II analysis, HEC RAS or approved equal shall be utilized. Routing of flood waters through an impoundment using a hydrologic model (to justify attenuated peak flows, for example) may be allowed, subject to approval of the Public Works Director or his or her designee (Ord. No. 2012-03, 5-7-12)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:kennesaw/zoning/6.11.08@2026-11-11-738ca1d248

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Kennesaw Zoning Ordinance, 6.11.08. Stormwater Hydrologic Methodology | Georgia Commons