  • As published by Municode, current through 2025-12-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 5 de 9. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

43,560 square feet for on-site sewage management systems with Non-public (Individual) water supply; in Section 210-190.06 add reference to Table 17.M of the Georgia Department of Public Health "Manual for On-Site Sewage Management Systems"; in Section 210-190.06.A strike the minimum lot size listed and add subsections i. 20,000 square feet for public sewage management systems with public water supply, ii. 21,780 square feet for on-site sewage management systems with public water supply and iii.

43,560 square feet for on-site sewage management systems with Non-public (Individual) water supply; in Section 240-10 revise Table 240.1 and Table 240.3; in Section 240-140.02 strike "Buffers are required to be installed on properties adjacent to dissimilar districts in accordance with the following specifications:"; in Table 240.4 remove references to PV Zoning District and update citation 1

; in Section 240-140.02.L strike shall and replace with are encouraged and add Trees selected for planting shall be a species listed in Table

240.5. Standards for transplanting shall be in keeping with those established by the International Society of Arboriculture, as included in the latest edition of the "Tree and Shrub Transplanting Manual". Refer to the American Association of Nurserymen publication "American Standard for Nursery Stock" (ANSI Z60, 1971) for plant material quality specifications. Refer to the "Manual of Woody Landscape Plants" (Michael Dirr, 1983, Castle Books) for information on tree species site requirements and strike the list of trees listed for planting; add Section 240-140.02.M requiring protective tree fencing along limits of undisturbed areas; add Table 240.5 "Recommended Tree Species List"; in Section 240-140.05 strike current text and replace; add Section 240-190 as it relates to Yard Tree Requirements in Residential Districts; add Section 240-200 as it relates to Street Tree Requirements in Non-Residential Districts; in Section 280-80.01 revise to provide for voting by the Board of Commissioners on the meeting scheduled for the 2nd Tuesday of each month. Title 4: In Section 600-250.03.B correct the numbering of subsections and correct reference to Development Regulations; in Section 600-250.03.C correct reference to Development Regulations; in Section 600-250.04.B correct reference to Development Regulations. Title 5: in Section 720-20.01.A update the single point of contact related to broadband network projects.

3. Ordinance 23-04 - March 14, 2023 Amendment to:

Title 1: Update Section 100-70 to include the latest amendment; In Section 110-40 add definitions for Conveyor Car Wash; Distilleries; In-bay Automatic Car Wash; Recycled Water System, Self-service Car Wash and amend the definition of Beer and Wine Retailers, excluding Liquor (445320) to include Distilled Spirits and strike excluding Liquor. Title 2: In Section 210-170.03 by revising subsection H. to read "Beer, Wine and Distilled Spirits Retailers" and subsection J. to read "Breweries and Distilleries". In Section 210-190.03 by revising subsection G. to read "Beer, Wine and Distilled Spirits Retailers", subsection I to read "Breweries and Distilleries" and by inserting "Massage Therapy" in alphabetical order and renumbering accordingly. In Section 210-240.03 by adding "Breweries and Distilleries" and renumbering the other uses accordingly. In Section 220-50.05.F by striking R-2 with Sewer and replacing with R-3. In Section 230-30 by adding Distilled Spirits to "Beer and Wine Retailers" in the list of Special Exception uses, by adding Distilleries to "Breweries and Distilleries" in the list of Special Exception uses and by adding a third provision requiring "All new commercial conveyor car washes, permitted and constructed after January 1, 2011 must install operational recycled water systems. A minimum of 50% water utilized will be recycled" to the Special Exception Use of Car Washes. In Section 260.20.01 Table 260.1 by adding Distilled Spirts to the use of "Beer and Wine Retailers", by adding Distilleries to "Breweries" and by striking spaced and replacing with spaces for Amenity Areas. Appendix: In Section 1-50 "LDQRD Low Density Quality Residential Development District" by striking the current text and replacing with a version accurately representing the LDQRD District located in the 2003 Zoning Ordinance as it was when inactivated.

APPENDIX A—UNIFIED DEVELOPMENT ORDINANCE

4. Ordinance 23-07 - June 13, 2023 Amendment to:

Title 1: In Section 100-80.03 strike subsection "C" to remove reference to administrative variances. In Section 110-40 add definitions for Crop Production, Electrical Equipment, Appliance and Component Manufacturing (335); Event Venue, Fabricated Metal Product Manufacturing (332); Machine Shops, Turned Product; and Screw, Nut, and Bolt Manufacturing (3327); Machinery Manufacturing(333); Millwork (32191); Miscellaneous Manufacturing (3399), Miscellaneous Wood Product Manufacturing (321999); Plastics and Rubber Manufacturing (326); Resin Synthetic Rubber, and Artificial and Synthetic Fibers and Filaments Manufacturing (3252), Storage Yards and Textile Mills (313); strike definition for Leather and Hide Tanning and Finishing (316110) and replace with "Leather and Allied Product Manufacturing (316); strike definition for Printing (32311) and replace with Printing and Related Support Activities (323); delete the duplicated definition of "Shared Workspaces/Co-Working Spaces". Title 2: In Section 210-10.02 add "s" to Backyard Chickens; add Crop Production including those uses listed in NAICS 1119 to list of permitted uses; renumber other permitted uses accordingly. In Section 210-10.04 add "Event Venue" to the list of uses requiring a Special Use Permit; renumber accordingly. In Section 210-40.01 add "Event Venue" to the list of uses requiring a Special Use Permit; renumber accordingly. In Section 210-40.06.A correct subsection numbering by changing lower case Roman numerals to Arabic numerals. In Section 210-70.14.A correct subsection numbers by changing the second "1." to "2." and "2." to "3.". In Section 210-140.06.A correct subsection numbering by changing lower case Roman numerals to Arabic numerals. In Section 210-150.06.A correct subsection numbering by changing lower case Roman numerals to Arabic numerals. In Section 210-160.06.A correct subsection numbering by changing lower case Roman numerals to Arabic numerals. In Section 210-170.02 modify the "Food and Beverage Retailers (excluding Liquor Stores, package" to "Food and Beverage Retailers (excluding Beer, Wine and Distilled Spirits Retailers); add "Event Venue" to the list of Permitted Uses; renumber accordingly. In Section 210-170.07.A correct subsection numbering by changing lower case Roman numerals to Arabic numerals. In Section 210-190.02 add "Event Venue" and "Food and Beverage Retailers (excluding Beer, Wine and Distilled Spirits Retailers) to the list of Permitted Uses; renumber accordingly. In Section 210-190.05.A correct subsection numbering by changing lower case Roman numerals to Arabic numerals. In Section 210-230.02 add "Electrical Equipment, Appliance and Component Manufacturing", " Miscellaneous Manufacturing as identified in NAICS Code 3399" to the list of Permitted Uses and renumber accordingly. In Section 210-230.04 add "Resin, Synthetic Rubber, and Artificial and Synthetic Fibers and Filaments Manufacturing" to the list of Special Use Permits; renumber other uses accordingly. In Section 210-240.02 add "Electrical Equipment, Appliance and Component Manufacturing", " Miscellaneous Manufacturing as identified in NAICS Code 3399" to the list of Permitted Uses; modify the permitted use of "Printing" to "Printing and Related Support Activities" and renumber other uses accordingly. In Section 210-240.03 add "Millwork" to the list of Special Exception Uses;

renumber other uses accordingly. In Section 210-240.04 add "Resin, Synthetic Rubber, and Artificial and Synthetic Fibers and Filaments Manufacturing" to the list of Special Use Permits; renumber other uses accordingly. In Section 210-250.02 add "Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing" to the list of Permitted Uses and renumber accordingly. In Section 210-250.03 add "Millwork" to the list of Special Exception Uses; renumber other uses accordingly. In Section 210-250.04 add "Fabricated Metal Product Manufacturing except those uses identified in NAICS 3324 and 3328"; modify "Leather and Hide Tanning and Finishing" to "Leather and Allied Product Manufacturing"; add "Machinery Manufacturing"; add Miscellaneous Wood Product Manufacturing as identified in NAICS Code 32199'; add "Plastics and Rubber Manufacturing"; add "Textile Mills" and renumber uses accordingly. In Section 210-260.02 add Crop Production including those uses listed in NAICS 1119 to list of permitted uses; renumber other permitted uses accordingly. In Section 210-260.04 add "Event Venues" to the list requiring Special Use Permits. In Section 230-30.01 add "Garbage Collection Services (I-1, I-2) provided all requirements of the Rules and Regulations of the State of Georgia Chapter 391-3-4 have been met."; "Millwork provided any outdoor storage is screened from view by a solid opaque wall or existing natural screen at least eight feet in height".

In Section 230-40.03 insert new subsection "C" to require printed copies of standards outlined in 230-40.03.B be made available for distribution to the general public at the public hearing; renumber following subsection accordingly. In Section 230-40.01 strike "and" from "Amusement and Recreation Industries, Outdoor as identified in NAICS Code 713990 except Shooting Ranges and"; add Event Venues; add "Fabricated Metal Product Manufacturing except those uses identified in NAICS 3324 and 3328"; add "Leather and Allied Product Manufacturing"; add "Machinery Manufacturing"; add Miscellaneous Wood Product Manufacturing as identified in NAICS Code 32199'; add "Plastics and Rubber Manufacturing"; add "Textile Mills" to the list of Uses Which Require a Special Use Permit. In Section 230-60.03 add new subsection "E" to require printed copies of standards outlined in 230-40.03.B be made available for distribution to the general public at the public hearing. In Section 240-140.03.M second sentence, insert "of" in between beginning and clearing. In Section 260-20.01 update Table 260.1 to include minimum parking requirements for the following uses: Crop Production; Electrical Equipment, Appliance and Component Manufacturing; Event Venues; Fabricated Metal Product Manufacturing; Machinery Manufacturing; Millwork; Miscellaneous Manufacturing; Miscellaneous Wood Product Manufacturing; Plastics and Rubber Manufacturing, Resin, Synthetic Rubber, and Artificial and Synthetic Fibers and Filaments Manufacturing;

Textile Mills; update the following uses Machine Shops, Turned Product; and Screw, Nut, and Bolt Manufacturing; Leather and Allied Product Manufacturing and Printing and Related Support Activities. Strike the current Chapter 280 and replace entirely with a new Chapter 280. Strike the current Chapter 290 and replace entirely with a new Chapter 290.

APPENDIX A—UNIFIED DEVELOPMENT ORDINANCE

5. Ordinance 24-02 - February 13, 2024 Amendment to:

Title 1: In Section 110-40 add definitions for Automotive Parts, Accessories and Tire Retailers (4413); Convenience Retailers; Gasoline Stations with Convenience Stores;

Supermarkets and other Grocery Retailers (except Convenience Retailers) and Truck Stops; strike definitions for Food and Beverage Retailers except Liquor Retailers (445) and Gasoline Stations (4571). Title 2: In Section 210-160 revise the Purpose and Intent;

Strike Food and Beverage Retailers (except Liquor Stores, package) and Gasoline Stations from the list of Special Exception Uses and add Specialty Food Retailers and Supermarkets and other Grocery Retailers (except Convenience Retailers to the list of Special Exception Uses. In Section 210-170 revise the Purpose and Intent; Strike Grocery and Convenience Retailers and Tobacco, Electronic Cigarette, and other Smoking Supplies Stores from the list of Permitted Uses; Add Specialty Food Retailers and Supermarkets and other Grocery Retailers (except Convenience Retailers) to the list of Permitted Uses; Add Fuel Pumps accessory to Supermarkets and/or General Merchandise Retailers to the list of Special Exception Uses and strike Gasoline Stations from the list of Special Exception Uses; Add Gasoline Stations with Convenience Stores and Tobacco, Electronic Cigarette, and other Smoking Supplies Stores to the list of Special Use Permits. In Section 210-180 strike Grocery and Convenience Retailers and Tobacco, Electronic Cigarette, and other Smoking Supplies Stores from the list of Permitted Uses; Add Specialty Food Retailers and Supermarkets and other Grocery Retailers (except Convenience Retailers) to the list of Permitted Uses; Add Fuel Pumps accessory to Supermarkets and/or General Merchandise Retailers to the list of Special Exception Uses and strike Gasoline Stations from the list of Special Exception Uses; Add Gasoline Stations with Convenience Stores and Tobacco, Electronic Cigarette, and other Smoking Supplies Stores to the list of Special Use Permits.

In Section 210-190 revise the Purpose and Intent; Strike Food and Beverage Retailers (excluding Beer, Wine and Distilled Spirits Retailers), Grocery and Convenience Retailers and Tobacco, Electronic Cigarette, and other Smoking Supplies Stores from the list of Permitted Uses; Add Specialty Food Retailers and Supermarkets and other Grocery Retailers (except Convenience Retailers) to the list of Permitted Uses; Add Fuel Pumps accessory to Supermarkets and/or General Merchandise Retailers to the list of Special Exception Uses and strike Gasoline Stations from the list of Special Exception Uses; Add Gasoline Stations with Convenience Stores and Tobacco, Electronic Cigarette, and other Smoking Supplies Stores to the list of Special Use Permits. In Section 210-240 add Gasoline Stations with Convenience Stores and Truck Stops to the list of Special Use Permits. In Section 210-250 add Truck Stops to the list of Special Use Permits. In Section 230-30.01 add Fuel Pumps accessory to Supermarkets and/or General Merchandise Retailers (B-1, PSC and B-2); strike Gasoline Stations (NB, B-1); correct the numbering for Religious Organizations with attendant Educational and Recreational Buildings and Cemeteries; add Specialty Food Retailers (NB) and Supermarket and other Grocery Retailers (NB). In Section 230-40.04 add the following to the list of Uses which require a Special Use Permit: Gasoline Stations with Convenience Stores (B-1, PSC, B-2 and I-1);

Tobacco, Electronic Cigarette and other Smoking Supplies Stores (B-1, PSC and B-2);

Truck Stops (I-1 and I-2). In Section 260-20.01 revise list of Commercial/Industrial Uses in Table 260.1 to strike Gasoline Stations and add parking requirements for Fuel Pumps accessory to Supermarkets and/or General Merchandise Retailers; Gasoline Stations with Convenience Stores; Specialty Food Stores, Supermarkets and other Grocery Retailers (except Convenience Retailers) and Truck Stops.

APPENDIX A—UNIFIED DEVELOPMENT ORDINANCE

6. Ordinance 24-05 - April 9, 2024 Amendment to:

Title 1: In Section 100-80.02 insert "environmental" in front of health; in Section 100-80.03 add new subsection "C" authorizing Community Development Director to make non-substantive changes without BOC approval; in Section 100-90.04 insert verbiage about re-inspection of SESPC at the fault of the developer; In Section 100-90.06 strike "or Certificate of Occupancy" and "such recording fees" and insert "proof of recording of the final plat". Title 2: In Section 210- 260 strike "Riding Stables" from the list of permitted uses and renumber accordingly; insert "Riding Stables" to the list of Special Exception Uses and renumber accordingly; Strike Section 230-30 in its entirety and replace with new which includes provisions for certification of Special Exceptions to become null and void after 12 months if no building permit is obtained or if the use is not established including requests for extension; the list of "Uses which Require a Special Exception" has been updated to include reference to the applicable zoning districts for each special exception use; insert Riding Stables and delete uses that are no longer special exception uses. In Chapter 280 strike Section 280-50 — 70 and mark as "Reserved" and renumber following sections accordingly; Insert new section to be titled "Re-Application after Denial" to read "If an application for a rezoning is denied, no re-application shall be allowed until 12 months have passed from the date of final decision by the Board of Commissioners"; in Section 280-110.03(F) strike 90 days and replace with 12 months. Appendix: Strike Section 1-20 PRD Planned Residential Development District and replace to match the order of the original ordinance; correct numbering; add Section 1-20.09 "Building Design" and Section 1-20.10 "Buffer Requirement" and renumber accordingly; insert footnote "1 Commencing August 28, 2018, no new applications for rezoning to the PRD Planned Residential Development district will be accepted by the Board of Commissioners."

APPENDIX B

DEVELOPMENT REGULATIONS*

2.1 Use of words and interpretation.

4.1 Submittal process.

4.2 Checklists for preliminary plats.

4.3 Checklists for residential construction plans.

4.4 Checklists for nonresidential construction plans.

4.5 Checklists for final plats.

Article 4.15 C-O, Corridor Overlay District

5.3 Minimum right-of-way and street improvements.

5.6 Subgrade preparation for all streets.

5.7 Base preparation and paving application.

5.11 Utilities.

5.12 Sidewalks.

5.14 Roadway design.

6.1 General.

6.3 Materials.

6.4 Execution.

6.5 Site preparation, restoration and related work.

7.4 Excavation and construction.

7.5 Inspection and tests.

7.8 Decentralized sewer systems, private sewer treatment facilities and community septic systems.

Systems Requirements

8.1 Site grading.

8.2 Stormwater detention.

8.4 Surface drainage.

using best management practices.

9.5 Inspection and enforcement.

11.1 General.

11.3 Materials.

11.4 Execution.

11.5 System identification and signage.

11.6 Site preparation, restoration and related work.

APPENDIX B—DEVELOPMENT REGULATIONS

12.7 Additional information requirements for development on buffer zone properties.

and Redevelopment

14.2 Maintenance and performance bonds.

14.5 Modifications, waivers, appeals and judicial review.

ARTICLE 1 AUTHORITY, TITLE, PURPOSE, INTENT AND SUBDIVISION OF

PROPERTY

1.1 Authority and title.

1.1.1 Authority. These development regulations are adopted under the authority of the Constitution of the State of Georgia and laws enacted pursuant thereto.

1.1.2 Title. These regulations shall be known as "The Development Regulations of Paulding County, Georgia," and may be referred to generally as "the development regulations" or, as used herein, "these regulations."

1.2 Purpose.

These regulations are intended to serve the following purposes:

1) To protect and promote the public health, safety and general welfare.

2) To provide a system for the subdividing of lands and the accurate recording of land titles.

3) To provide assurance that those lots shown on recorded subdivision plats are usable by the purchasers for their intended and permitted functions.

4) To encourage economically sound and orderly land development in accordance with the policies and objectives of the Comprehensive Plan of Paulding County.

5) To assure the provision of required streets, utilities and other facilities and services to new land developments in conformance with public improvement policies of the county.

6) To assure adequate provision of safe and convenient traffic access and circulation, both vehicular and pedestrian, in new land developments.

7) To assure the provision of needed open spaces and public facility sites in new land developments through the dedication or reservation for purchase of land for public purposes.

8) To assure equitable review and approval of all subdivision and site plans by providing uniform procedures and standards for the developer.

1.3 Intent and application.

It is the intent of these regulations that they apply to and provide guidance for the development of any lands within the unincorporated area of Paulding County, or any other areas over which the Paulding County Board of Commissioners has authority pertaining to land development. These regulations apply to all land disturbing activity and development activity, whether the development involves the subdivision of land for sale to individual users or pertains only to the construction of buildings or other improvements on a single parcel.

1.4 Agricultural exemption.

Clearly agricultural uses, limited to the cultivation of the land, dairying or animal husbandry, are not intended to be governed by these regulations, provided that land proposed to be converted to a new agricultural use must be zoned A-1 to be exempt from the provisions herein.

1.5 Subdivision of property.

1.5.1 Subdivision of two or more lots. These regulations shall govern all subdivision of land into two or more individual parcels or lots, within the unincorporated limits of Paulding County, Georgia, or any other areas over which the Paulding County Board of Commissioners has authority pertaining to land development.

1.5.2 Preapplication review. Whenever the subdivision of a tract of land is proposed, the subdivider is urged to consult with the Paulding County Development Control Committee. The subdivider may submit concept plans and data showing existing conditions within the site and its vicinity and the proposed development layout of the subdivision.

1.5.3 Approvals. The development control committee shall approve all preliminary plats and construction plans in accordance with these regulations.

1.5.4 Time limits on preliminary plat and construction plan approval. Preliminary plats shall be good for a period of one year after development control committee approval. Within that year construction plans must be submitted and approved. Construction of the project must begin within one year of construction plan approval. If these time limits are exceeded, the project shall be void and subject to reapplication.

1.5.5 Construction of phased developments. Developers shall be responsible for damages and maintenance of previously accepted streets. When construction traffic of new phases/ developments impact severely on existing county streets, as determined by the Paulding County Community Development Department, and the developer fails to take necessary corrective action, the developer's maintenance bond may be used for these off site repairs and maintenance.

1.5.6 Status of platted streets and other public spaces and utilities. After final approval by the development control committee and the completion of all improvements required by these regulations and the expiration of the required maintenance bond period, the subdivider may request the county to accept platted streets and other public spaces and utilities.

1.5.7 Priority of health department. Nothing contained in these regulations shall be construed as preventing the health department, after study of the conditions existing in a proposed subdivision, from requiring that all or any portion of the area of such subdivision shall not be built upon or that the minimum lot sizes set forth in these regulations are inadequate and must be increased to insure the protection of public health.

1.6 Subdivision lot criteria.

1.6.1 Jurisdictional boundary lines. Lots shall not be divided by corporate or county boundary lines.

1.6.2 Corner lots. Corner lots shall be sufficiently large to permit the location of buildings so as to conform with the building lines on both streets. Corner lots shall have driveways on only one street.

1.6.3 Double frontage.

1) For double frontage lots (i.e., lots having street frontage both in front and rear) in residential subdivisions along major thoroughfares, a no-access easement of at least ten feet in width, across which there shall be no right of access, shall be provided along the line of lots abutting said major thoroughfare. The no-access easement shall be planted with a single line of shrubs or trees, or contain a solid or decorative fence, or contain other such screening treatment as may be proposed by the developer and approved by the development control committee.

2) For double frontage lots in subdivisions along minor collectors or local streets, there shall also be a no-access easement as described in the paragraph immediately above, except that any planting or screening of the no-access easement shall be at the sole option of the developer.

1.6.4 Lot lines. Insofar as practical, side lot lines shall be at right angles to straight street lines and radial to curved street line.

1.6.5 Minimum lot dimensions and area. The minimum lot width at the front building line and minimum lot area shall be in accordance with the Paulding County Zoning Ordinance.

1.6.6 Lot depth. Except in instances of extreme topography or unusual physical conditions, lot depth shall not be more than four times the lot width at the building line.

1.6.7 Street access.

1) Every lot hereafter established shall front or abut on a street which is to be dedicated to the public and conforms to the requirements of these regulations, unless on an approved driveway easement or as otherwise approved by the development control committee. Generally, lots shall not derive access exclusively from any street designated as an arterial or collector street on the roadway classification map. If access must be obtained from an arterial or collector street, single-family residential driveways shall be designed and arranged to avoid requiring vehicles to back into traffic. Multiple family residential driveways and drives serving all nonresidential land uses shall be designed and arranged to avoid requiring vehicles to back into traffic on all streets.

2) A maximum of 120 residential dwelling units shall be allowed to be constructed with only one street outlet on an existing public street. For the purposes of this section "existing public street" means a street not included as a part of a platted subdivision, unless classified as a collector roadway or higher roadway functional classification. If a second access to an existing public street is not available or its existence may induce nonresidential traffic through the development as determined by the Paulding County DOT, the second access requirement may be waived by the Paulding County DOT if and only if the original street outlet is designed and constructed with sufficient right-of-way and improvements to provide a divided median road with two lanes in and two lanes out. The 120 dwelling unit threshold is applicable for any location within the development. No further building permits may be issued within the development upon reaching the capacity of 120 residential dwelling units without a second access or without an approved waiver of the second access requirement. All accesses to an existing public street will be required to be a full access intersection. For the purposes of this section, "full access intersection" means allowing all potential movements, including left-in, left-out, right-in, right-out, and through movements, i.e., no turning movements are restricted.

Subdivisions with greater than 400 residential dwelling units will be required to provide three access outlets onto existing public streets. No further building permits may be issued within the development upon reaching the capacity of 400 residential dwelling units without three access outlets onto existing public streets.

(Ord. No. 22-12, § 1, (Exh. A) 8-23-2022; Ord. No. 25-03, § 1(Exh. A), 3-11-25)

1.7 Easements.

1.7.1 Utility easements. When it is found to be necessary and desirable to locate public utility lines in other than street rights-of-way, easements shall be shown on the plat for such purposes. Such easements shall not be less than 12 feet in width and, where possible, shall be centered on rear or side lot lines.

1.7.2 Watercourse and drainage easements. Where a proposed subdivision is traversed by a watercourse, drainage way or stream, appropriate provisions shall be made to accommodate stormwater and drainage through and from the proposed subdivision. Such easement shall conform substantially with the lines of said watercourse and be of sufficient width for construction and/or maintenance. All easements and appropriate storm drain pipes shall be subject to the following:

Easements for Watercourse and Drainage Storm Drain Pipes Pipe Size (Inch) Maximum Pipe Invert Depth (Ft.)

Minimum Easement Width (Ft.)

NA 4 5 6 7 8 9 10 11 12 13 14 15 16 15 20 20 20 20 20 25 25 30 30 30 35 35 40 18 20 20 20 20 20 25 25 30 30 30 35 35 40 24 20 20 20 20 20 25 25 30 30 30 35 35 40 30 20 20 20 20 25 25 25 30 30 35 35 35 40 36 20 20 20 20 25 25 25 30 30 35 35 35 40 42 NA 20 20 20 25 25 30 30 30 35 35 40 40 48 NA 20 20 20 25 25 30 30 30 35 35 40 40

54 NA NA 20 25 25 25 30 30 35 35 35 40 40

60 NA NA 20 25 25 25 30 30 35 35 35 40 40

66 NA NA NA 25 25 30 30 30 35 35 40 40 40

72 NA NA NA 25 25 30 30 30 35 35 40 40 40

1.7.3 Private easement subdivisions.

1) There is hereby created a classification of subdivisions known as "private easement subdivisions." This classification is to be used in those instances where there has been a subdivision of property by a person (hereinafter referred to as the "subdivider") wherein the property lacks the minimum required amount of county road frontage in order to obtain building permits.

2) When a subdivider desires to create a private easement subdivision, the following shall apply:

(a) The person desiring to create the private easement subdivision shall make application to the development control committee in the same manner as all other subdivisions are approved in Paulding County. The person shall submit to the development control committee six copies of the final plat along with copies of any deed restrictions or road maintenance agreements that will affect the property being subdivided. The final plat must be labeled as a private easement subdivision.

(b) On each deed that is conveyed by the subdivider to any other person of the property contained in the private easement subdivision the following language must be shown on the deed:

The grantee herein recognizes that any and all means of ingress and egress to the property conveyed hereby that is provided by the grantor or his successors or assigns are considered by the Paulding County Development Control Committee and the governing body of Paulding County to be a private easement and is not maintainable by said governing body. The grantee and the property owner hereby agree that they will be responsible for their proportionate share of the upkeep and maintenance of this private easement and completely hold the governing body of Paulding County harmless from any necessity for such upkeep and maintenance.

(c) There shall be a maximum of three single-family dwelling permits issued for each private easement subdivision. Waivers of this requirement may be submitted to the development waiver review committee pursuant to article 14 of this ordinance. Provided however, in no event shall more than six building permits be allowed fronting off a single easement access through the waiver and/or variance process except that any lot of record which meets requirement 1.7.3(d) and existed prior to September 12, 2006, as confirmed by the planning and zoning division manager, may be used as a building site for one singlefamily dwelling.

1. In addition to the requirements set forth herein and within article 14, the development waiver review committee and/or Paulding County Board of Commissioners, shall require written notification of the waiver application to all persons with residences located on the private easement of the waiver application.

2. The development waiver review committee and/or the board of commissioners, at its discretion and request, may require a joint maintenance agreement for the private easement as a part of the application and/or approval process.

3. As a part of the variance application for an additional permit, the applicant must show special circumstances and/or a hardship as the basis for the request for an additional permit.

4. In addition, as part of any waiver or variance application, the applicant shall provide a title certificate from a licensed attorney certifying the title of the property being applied for and the specific ability of the applicant to subdivide the easement rights to allow for another easement access point and building permit.

(d) Each subdivided lot contained in a private easement subdivision shall be a minimum of two acres in size.

(e) The minimum width of the private easement servicing the private easement subdivision shall be 30 feet wide.

(f) There shall be no more than one private easement subdivision for every 500 feet of county road frontage unless the development control committee specifically finds that this would create an undue hardship on a proposed subdivider and allows a modification of this item.

(g) All easements for private easement subdivisions shall be inspected by the county department of transportation to determine if the private easement is suitable for drainage, travel of emergency vehicles and proper maintenance by the property owners. The proposed easement road is to be a minimum 15-foot gravel surface with a 40 foot turn-around, dead end.

(h) The subdivider shall install any pipe required by the county and the subdivider or his heirs or assigns shall be responsible for all maintenance of said easement as shown by the deed restrictions.

(i) All state and county specifications shall apply to all construction of buildings on all lots contained in the private easement subdivision.

(j) In order to facilitate the location of persons by emergency vehicle personnel, mailboxes of parties residing on the easement shall be placed at the intersection of the easement with the county-maintained road with complete names and addresses of the parties living on the easement posted thereon.

(Res. No. 16-17, § 1, 4-12-2016)

1.8 General requirements.

1.8.1 Monuments. Lot corners shall be marked with an iron pin at least 18 inches long and driven flush or up to two inches above the finished grade. A minimum of two GPS ties with coordinates shall be shown on the final plat.

1.8.2 Natural gas. When gas lines are located in a street right-of-way and it will be necessary to cut into the street surface to serve the abutting lots, a connection shall be stubbed out to the property line to serve each lot prior to surfacing the street.

1.8.3 Water supply. Where public water is available at the property being subdivided, the subdivider shall install water mains, fire hydrants and appurtenances according to plans and specifications approved by the Paulding County Water, Sewer and Environmental Services Department. When the water main is located in the street right-of-way and it will be necessary to cut into the street surface to serve the abutting lots, a connection shall be stubbed out to the property line to serve each lot before the street is surfaced.

1.8.4 Sanitary sewerage. Where public sewerage is available at the property being subdivided and the topography is such that extension is feasible, the subdivider shall install public sanitary sewers to plans and specifications approved by the water, sewer and environmental services department. When the sewer is located in a street right-of-way and it will be necessary to cut into the street surface to serve the abutting lots, a connection shall be stubbed out to the property line to serve each lot prior to surfacing the street.

1.8.5 Sewage disposal system. Prior to the construction of any community sewage disposal system such as an oxidation pond or other facility, the location, size, plans and specifications of such a facility shall be approved by the appropriate county official, the health department and the Georgia Environmental Protection Division as required.

1.8.6 Curbs and gutters. Concrete curbs and gutters are required and shall be installed according to the specifications of the Paulding County Department of Transportation.

1.8.7 Street grading and surfacing. Streets shall be graded and surfaced with asphalt plant mix according to article 5.

1.8.8 Storm drainage. An adequate drainage system, including necessary open ditches, pipes, culverts, storm sewers, intersection drains, drop inlets, bridges and other necessary appurtenances shall be installed by the subdivider according to plans and specifications approved by the Paulding County Community Development Department.

1.8.9 Utility strips. The street right-of-way shall be graded at least ten feet, measured from the back of the curb or the edge of the pavement on both sides of the street, to provide space for installation of utilities, to prevent the encroachment of driveways into the street surface, to provide walkways off the paved vehicular surface, and to provide space for the future installation of sidewalks; provided, however, the development control committee may waive this requirement in cases where the subdivider can demonstrate that the topography of the land being subdivided is such that compliance with this provision would be impractical.

1.8.10 Street trees (nonresidential developments only). The planting of street trees is required within nonresidential developments in order to enhance the appearance of such developments. The minimum required tree planting is one tree for every 35 linear feet of road frontage. The minimum tree size is two-inch caliper or larger, as measured at the diameter breast height. Plantings may occur within parking lot islands instead of right-of-way plantings as long as the tree count and caliper are maintained.

1.8.11 Temporary construction offices. An office mobile unit may be moved in by the developer for a 12-month period with an additional 12 months approved by the community development director if necessary.

ARTICLE 2 DEFINITIONS

2.1 Use of words and interpretation.

2.1.1 Use of words.

1) When appropriate to the context, words used in the singular shall include the plural, and the plural the singular; words used in the present tense shall include the future tense, and vice versa.

2) Words in the masculine gender shall include the feminine.

3) The word "shall" or "must" is mandatory and not discretionary.

4) The word "may" is permissive.

5) Use of the word "and" is inclusive and requires that all of the component phrases so connected must be present or fulfilled for sufficiency.

6) Use of the word "or" is not exclusive (as in "either... or"), and requires that at least one of the component phrases so connected must be present or fulfilled for sufficiency. The word "or" may allow more than one component phrase to be present or fulfilled, as is implied by the common term "and/or."

2.1.2 Interpretation.

1) Words and phrases defined in this article shall be interpreted as defined herein without regard to other meanings in common or ordinary use, unless the context of the word indicates otherwise.

2) Words or phrases not defined herein shall be interpreted as defined in the Zoning Ordinance of Paulding County or any other county ordinance, as applicable to the use of the word within the context of these regulations.

3) Words not defined herein or in the zoning ordinance or any other applicable code, regulation, or ordinance of Paulding County shall be construed to have the meaning given by common and ordinary use, and shall be interpreted within the context of the sentence, section, and article in which they occur.

2.2 Definitions of words and phrases.

Addition (to a new building). Any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a fire wall; or any walled and roofed addition that is connected by a fire wall or is separated by independent perimeter load-bearing walls in new construction.

Alley or service drive. A minor, permanent, public service-way which is used primarily for vehicular service access to the back or the side for properties otherwise abutting on a street.

Applicant. A person, either the owner or the bona fide representative of the owner of land or structures governed by these regulations, who seeks authority to use, develop, construct upon or otherwise enjoy the use of property through any of these procedures established under these regulations.

Area of shallow flooding. A designated AO or VO zone on a community's flood insurance rate map (FIRM) with base flood depths from one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.

Area of special flood hazard. The land in the floodplain within a community subject to one percent or greater chance of flooding in any given year (i.e., the 100-year frequency flood).

Arterial. A principal arterial, major arterial, or minor arterial street as defined and designated in the Comprehensive Plan of Paulding County and in the Roadway Classification Map of Paulding County.

"As-built" survey. See record drawings.

Base flood. The flood that has a one percent probability of occurring in any calendar year (i.e., the 100-year frequency flood).

Base flood elevation. The highest water surface elevation anticipated at any given point during the base flood.

Best management practices (BMP's). A collection of structural measures and vegetation practices that, when properly designed, installed and maintained, will provide effective erosion and sedimentation control for all rainfall events up to and including a 25-year, 24-hour rainfall event.

Block. A piece or parcel of land entirely surrounded by public streets, other than alleys.

Board of commissioners. The Board of Commissioners of Paulding County, Georgia.

Breakaway wall. A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation system.

Buffer (for erosion/sedimentation control purposes). An area along the course of any state waters to be maintained in an undisturbed and natural condition.

Buffer (general). A barrier that is created by the use of trees or other acceptable plant or vegetative material alone or in combination with berms, fencing or walls used to physically separate or screen one use or property from another so as to visually shield or block noise, lights and/or dissimilar uses.

Buildable lot of record. A lot or parcel of land that existed as a single parcel of ownership, recorded as such in its entirety and present boundaries with the clerk to superior court prior to June 2, 1970, or which is shown in its entirety and present boundaries on a final plat or exemption plat duly approved under these or any previously applicable regulations providing for the subdivision of land in Paulding County and recorded with the Clerk to Superior Court of Paulding County.

Building setback line. A line across a lot parallel to a street right-of-way or other property line establishing the minimum open space to be provided between any principal building and the street or other property line. All building setback lines shall be at least as restrictive as the corresponding minimum yard setbacks required in the zoning ordinance. On corner lots, the terms of the Paulding County Zoning Ordinance shall apply.

Certificate of occupancy. Final approval by the community development department for the use or occupancy of a structure for which a building permit was issued.

Clearing. The removal of trees or other vegetation, but not including grubbing activities.

Community development department. A department of the Paulding County government comprised of the development division, the planning and zoning division and the permits and inspections division, that has the primary responsibility for overseeing physical land development in the county and carrying out the terms of these regulations.

Comprehensive plan. A plan summarizing and illustrating the adopted goals and objectives of the board of commissioners regarding the future location and character of anticipated land uses, transportation, and other public facilities in Paulding County. The term "comprehensive plan" includes component or functional plans for the county, including but not limited to a plan for land use (i.e., land use plan) or a plan for transportation facilities, and includes the classification of streets and thoroughfares as shown on the adopted long range road classification map.

Concept plan. A drawing that shows the overall concept of a proposed development, and that may include lots and streets in a subdivision or the general location of buildings and improvements for a multifamily or nonresidential project, and that may be drawn to approximate dimensions in a freehand style. These drawings are for information purposes only and shall not be formally reviewed or approved by the county.

Condominium. A building, or group of buildings, in which dwelling units or floor area are owned individually, and the structure, common areas and facilities are owned by all the owners on a proportional, undivided basis, subject to all applicable provisions of Georgia law.

Construction plans. A set of plans that must be formally submitted to the development control committee for review and approval following the approval of a preliminary plat on residential subdivisions and upon application for a nonresidential development project. Such plans shall include, but not be limited to, grading plans, soil erosion and sediment control plans, hydrology studies, transportation plans, water plans, sanitary sewerage plans, on-site sewer plans and public safety plans.

County. Unless otherwise stated, the term "county" shall mean Paulding County, Georgia.

Cul-de-sac. A street having one end open to traffic and being permanently terminated within the development by a vehicular turnaround. For the purpose of designation, a cul-de-sac street shall be interpreted to begin at the intersection of two or more streets nearest to the vehicular turnaround.

Cut. A portion of land surface or area from which earth has been removed by excavation;

also, the depth below original ground surface to excavated surface.

Department of transportation. Unless otherwise stated, this term refers to the Paulding County Department of Transportation.

Developer. Any person, individual, firm, partnership, association, corporation, estate, trust, or any other group or combination acting as a unit who directs the undertaking or proposes to undertake development activities as herein defined, whether the development involves the subdivision of the land for sale to individual users, the construction of buildings or other improvements on a single land ownership, or both.

Development - 1 (verb). All activities associated with the conversion of land or the expansion or replacement of an existing use to any new use intended for human operation, occupancy or habitation, other than for agricultural purposes devoted strictly to the cultivation of the land, dairying or animal husbandry. Such activities include land disturbance (clearing and grubbing the land of vegetation and stumps, and grading) and the construction of improvements such as but not limited to streets, driveways or parking areas, water or sewer mains, stormwater drainage facilities, sidewalks or other structures permanently placed on or in the property.

2 (Noun). Where appropriate to the context, the term "development" also may be used to denote a specific subdivision or project that is a single entity or intended to be constructed as an interrelated whole, whether simultaneously or in phases.

Development control committee. A committee comprised of the departments of community development, fire, environmental health, transportation, and water, sewer and environmental services. The primary function of the development control committee is to review and approve all proposed subdivisions of property, commercial or multifamily site developments and other such similar projects that fall under the purview of these regulations.

Development division. The Development Division of the Paulding County Community Development Department.

Development permit. A permit issued by the community development department authorizing clearing, grubbing, grading and construction of storm drainage facilities, access drives, streets, parking or other improvements exclusive of buildings.

Diameter breast height (dbh). The diameter of a tree measured at a point four and one-half feet above the ground.

Drainage improvements. Those facilities and structures intended to control and direct the passage of stormwaters and other surface water flows from and across a property; including, but not limited to, swales and ditches, cross drains and other piping systems, catch basins, detention ponds and velocity dissipation devices.

Driveway. A vehicular access way in private ownership, other than a private street, which provides access primarily to only one property, or to no more than two single-family detached residences.

Dwelling unit (D.U.). A residence for one family, whether a freestanding building or a part of another building containing other residences.

Easement. A grant of one or more of the property rights by the property owner to and/or for use by the public, a corporation, or another person or entity, and recorded in the superior court clerk's office.

Elevated building. A nonbasement building built to have the lowest floor elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns (posts and piers), shear walls or breakaway walls.

Erosion. The process by which land surface is worn away by the action of wind, water, ice or gravity.

Erosion and sedimentation control plan. A plan for the control of soil erosion and sedimentation resulting from a land disturbing activity.

Fee simple. A form of property ownership in which the buildings and surrounding lands are owned by the same person.

Federal Emergency Management Agency (FEMA). The federal agency that administers the national flood insurance program. FEMA prepares, revises and distributes the maps and studies referenced in these regulations.

Fill. A portion of land surface to which soil or other solid material has been added; the depth above the original ground.

Final plat. A finished drawing of a subdivision showing completely and accurately all legal and boundary information and certification, as specified in article 4 of these regulations.

Finished grade. The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.

Fire flow. The minimum volume flow rate of water established by the water, sewer and environmental services department with a minimum residual pressure of 20 psi.

Fire services division. A division of the Paulding County Department of Public Safety charged with the responsibility of enforcing the county's fire prevention and life safety codes.

Flood or flooding. A general or temporary condition of partial or complete inundation of normally dry land areas from either the overflow of inland or tidal waters or the unusual and rapid accumulation or runoff of surface waters from any source.

Flood hazard boundary map. An official map of a community, issued by FEMA, where the boundaries of the areas of special flood hazard have been defined as zone A.

Flood insurance rate map (FIRM). An official map of a community, on which FEMA has delineated both the areas of special flood hazard and the risk premium zones applicable to the community.

Flood insurance study. The official report provided by FEMA, containing flood profiles as well as the flood boundary floodway map and the water surface elevation of the base flood.

Floodway. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot.

Floor. The top surface of an enclosed area in a building (including basement), i.e., top of slab in concrete slab construction or top of wood flooring in wood frame construction. The term does not include the floor of a garage used solely for parking vehicles.

Functionally dependent facility. A facility that cannot be used for its intended purpose unless it is located or carried out in close proximity to water, such as a docking or port facility necessary for the loading and unloading of cargo or passengers, shipbuilding, ship repair, or seafood processing facilities. The term does not include long-term storage, manufacture, sales or service facilities.

Georgia DOT. The Department of Transportation of the State of Georgia.

Grading. The movement, removal or addition of earth on a site by the use of mechanical equipment.

Grading permit. An official authorization issued by the development division permitting grading of a site, and may include installation of attendant stormwater drainage facilities.

Ground elevation. The original elevation of the ground surface prior to cutting or filling.

Grubbing. The removal of stumps or roots from a property.

Health department. The Environmental Health Services Division of the Georgia Department of Human Resources for Paulding County.

Highest adjacent grade. The highest natural elevation of the ground surface, prior to construction, next to the proposed walls of a structure.

House location plan (HLP). A drawing showing lot information and all improvements, as identified in article 3.

Land disturbance permit. Any permit other than a building permit issued by Paulding County that authorizes land-disturbing activities on a site or portion of a site. Said permit may be a timber permit; grading permit; or development permit as defined and authorized herein.

Limited certificate of occupancy. Approval by the community development department for the use of a model home for sales and marketing purposes.

Lot. A designated parcel, tract or area of land established by plat, subdivision or as otherwise permitted by law, to be separately owned, used, developed or built upon; also, a parcel of land, whether or not platted, in single ownership, and not divided by a street.

Lot, corner. A lot fronting on two streets at their intersection. When the frontage of one street exceeds the frontage of the other, the one with the least frontage shall be deemed the front of the lot. The side yard setback for a corner lot shall be 25 feet in all zoning districts except where otherwise noted in the Paulding County Zoning Ordinance.

Lot, double frontage. Any lot, other than a corner lot, that has frontage on two streets.

Lot width. The width of the lot at the building line measured parallel to the street right-of-way or, in the case of a curvilinear street, parallel to the chord of the arc between the intersection of the side lot line and the street right-of-way line.

Major intersection. The intersection of two or more public streets in which at least one of the streets is an arterial or major collector as designated by the comprehensive plan and the roadway classification map.

Major thoroughfare. Any public street, existing or proposed, which is shown in the comprehensive plan and roadway classification map as an arterial or major collector.

Mean sea level. The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of these regulations, the term is synonymous with National Geodetic Vertical Datum (NGVD).

Minor collector. A through street having the primary function of connecting subdivisions or other areas to major thoroughfares, or functioning as a central route within a subdivision channeling traffic from the local streets to either an abutting major thoroughfare or another minor collector street. For the purposes of these regulations, a central but nonthrough route within a subdivision or other project will be considered as a minor collector, if the average daily traffic generated by the development on the route will exceed 2,000 trips.

National Geodetic Vertical Data (NGVD). As corrected in 1929, a vertical control used as a reference for establishing varying elevations within the floodplain.

Natural ground surface. The ground surface in its original state before any grading, excavation or filling.

Nephelometric turbidity units (NTU). Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed particles are present.

Owner. A person having a majority fee simple interest in real property, or a majority interest through any other form of ownership.

Pedestrian way. A right-of-way within a block dedicated to public use, intended primarily for pedestrians and from which motor propelled vehicles are excluded.

Person. An individual, firm, partnership, corporation, joint venture, association, social club, fraternal organization, estate, trust, business trust, receiver, syndicate, or other group or combination acting singly or collectively for a common purpose, and the duly authorized agents thereof.

Planning commission. The Paulding County Planning Commission, which is the body that reviews, conducts public hearings and makes recommendations to the board of commissioners on all requests for rezoning in the county.

Planning and zoning division. The Planning and Zoning Division of the Paulding County Community Development Department.

Preliminary plat. A drawing that shows the perimeter boundary, topography, lot arrangements, street layout and other features of a proposed subdivision, as specified in article 4 of these regulations.

Private dwelling. For the purpose of these regulations, a private dwelling is a single-family or duplex residence located on any property that is not part of a platted subdivision.

Project. A principal building or structure, or group of buildings or structures, planned and designed as an interdependent unit together with all accessory uses or structures, utilities, drainage, access, and circulation facilities, whether built in whole or in phases. Examples include: a principal building on a lot, a residential subdivision, a multi-family development, a shopping center or an office park.

Project access improvement. Any improvement or facility that is planned and designed to provide service or access for a particular project and that is necessary for the use, safety and convenience of the occupants or users of the project and is not a system improvement. A project access improvement includes, but is not limited to: pedestrian access improvements; site driveways; new streets; median cuts; right turn lanes; left turn lanes; acceleration lanes;

deceleration lanes; traffic control measures made necessary to serve site driveways or new streets; intersection improvements whose primary purpose at the time of construction is to provide access to the project; and necessary right-of-way dedications required for any project access improvement.

Record drawing. A survey or other drawing based on a field survey which shows existing features or components and horizontal or vertical information (grades or location of improvements).

Residential street classification. Streets are hereby classified as follows:

S1—Streets that serve no more than 20 dwelling units (D.U.s) S2—Streets that serve from 21 to 150 D.U.s.

S3—Streets that serve from 151 to 250 D.U.s.

Any street serving more than 250 D.U.s is not classified as a residential street. For the purpose of the above shown residential street classification, the count of the number of dwelling units served by a street shall begin at its intersection with another street and continue for its duration throughout the remainder of the development, unless otherwise specified by the development control committee.

Road. See "street, public".

Roadway. The paved portion of a street from back of curb to back of curb (or edge to edge of pavement for streets not having curbs) but excluding driveway aprons, bridges, and large single and multi-cell culverts that in an hydrologic sense can be considered to function as a bridge.

Roadway classification map. A map maintained by the Paulding County Department of Transportation that shows the classification, as defined in these regulations, of all roadways in Paulding County.

Roadway drainage structure. A device such as a bridge, culvert or ditch that conveys water under a roadway by intercepting the flow on one side of a traveled way consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.

Sediment. Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by air, water, ice or gravity as a product of erosion.

Sedimentation. The process by which eroded material is transported and deposited by the action of water, wind, ice or gravity.

Sheet flow. Diffused water running overland to a defined watercourse.

Site work. Development activity to prepare a property for construction of buildings or finished structures, including clearing, grubbing, grading and installation of soil sedimentation and erosion control facilities.

Stabilization. The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.

State waters. Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells and other bodies of surface or subsurface water, natural or artificial, lying within or forming part of the boundaries of the state that are not entirely confined and retained completely upon the property of a single individual, partnership or corporation. Generally, state waters do not include basins that are 20 acres and smaller, dry, without running water.

Street, private. An access way similar to and having the same function as a public street, providing access to more than one property, but held in private ownership (as distinct from a "driveway").

Street, public. A right-of-way dedicated to and accepted by Paulding County for vehicular traffic, or over which Paulding County may hold a prescriptive easement for public access, and including designated and numbered U.S. and state highways. For the purposes of these regulations, the term "public street" shall be limited to those which afford or could afford a direct means of vehicular access to abutting property, and exclude limited access roadways which abut a property, but from which direct access may not be allowed under any circumstances.

Street, local nonresidential. A surface street intended primarily to provide local access to adjacent existing or planned commercial or industrial development and not for through traffic.

Street, local residential. A surface street intended primarily to provide local access to adjacent residential development and not for through traffic (see also, "residential street classification" on page 18 of these regulations).

Street, marginal access. A local street that is parallel to and adjacent to a major thoroughfare and provides access to adjacent properties and protection from through traffic.

Structural erosion and sedimentation control measures. Measures for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures, sediment traps and land grading, etc. Such measures can be found in the publication, Manual for Erosion and Sediment Control in Georgia.

Structure. Anything constructed or erected on the ground or attached to something on the ground.

Subdivider. Any person, individual, firm, partnership, association, corporation, estate, trust, or any other group or combination acting as a unit dividing or proposing to divide land so as to constitute a subdivision as herein defined, including an agent of the subdivider.

Subdivision - 1 (verb). Any division or redivision of a lot, tract or parcel, regardless of its existing or future use, into two or more lots, tracts or parcels for the purpose, whether immediate or future, of sale, legacy or building development. This includes all division of land involving a new street or change in existing streets and includes re-subdivision and, where appropriate to the context, relates to the process of subdividing or to the land or area subdivided; provided, however, that the following are not included within this definition:

(a) The combination or re-combination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards set forth in these regulations.

(b) The division of land into parcels of ten acres or more where all of such parcels have frontage on a county maintained road; provided, however, in such cases a final plat shall be submitted to the development control committee for approval.

2 (noun). Where appropriate to the context, the term "subdivision" also may be used in reference to the aggregate of all lots held in common ownership at the time of division.

All subdivisions shall have preliminary plats submitted to the Paulding County Development Control Committee. (Exception: division of land into ten-acre or larger tracts with county maintained road frontage, do not require plat submittals.)

Substantial improvement (for flood-related purposes only). Any combination of repairs, reconstruction, alteration or improvements to a structure, taking place during the life of a structure, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure. The market value should be either the appraised value of the structure prior to the start of the initial repair or improvement; or, in the case of damage, the value of the structure prior to the damage occurring. For the purpose of these regulations, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include any project for improvement of a structure required to comply with existing health, sanitary or safety code specifications that are solely necessary to assure safe living conditions.

System improvement. Any improvement or facility such as streets, bridges or rights-of-way identified in the comprehensive plan, and any traffic control measures, landscaping or other features to same and is further designed to provide service to the community at large.

Tie point. The point of reference for a boundary survey. Said point of reference shall be an established, monumented position that can be identified or relocated from maps, plats or other documents on public record. Two GPS ties with coordinates shall be required on all final plats.

Tree. Any self-supporting woody perennial plant, usually having a main stem or trunk and many branches, and at maturity normally attaining a trunk diameter greater than three inches at any point and a height of over ten feet.

Tree diameter. The widest cross-sectional dimension of a tree trunk measured at diameter breast height (dbh) or at any point below dbh for new trees or multi-trunked species, but in no case less than six inches from the ground.

Tree protection area. Any portion of a site wherein are located existing trees that are proposed to be retained in order to comply with the buffer requirements of the zoning ordinance or other applicable ordinances and regulations of Paulding County.

Tree protection plan. A plan that identifies tree protection areas, existing trees to be retained and proposed trees to be planted on a property to meet minimum requirements of all applicable ordinances and regulations of Paulding County.

Trout streams. All streams or portions of streams within a watershed as designated by the Game and Fish Division of the Georgia Department of Natural Resources, under the provisions of the Georgia Water Quality Act. Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown or brook trout. Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.

Vegetative erosion and sediment control practices. Practices for the stabilization of erodible or sediment-producing areas by covering the soil with: a) permanent seeding, sprigging or planting, producing a long-term vegetative cover; b) temporary seeding, producing short-term vegetative cover; or c) sodding, covering areas with a turf of perennial sod-forming grass.

Water, sewer and environmental services department. The department charged with the responsibility for the design, installation, inspection, approval and maintenance of the potable water supply and distribution system, the public sanitary sewer system, wastewater treatment and solid waste and recycling services for areas under Paulding County's jurisdictional control.

Watercourse. Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.

Wetlands. Areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions.

Wetlands generally include swamps, marshes, bogs and similar areas.

Zoning ordinance. The currently adopted Zoning Ordinance of the Paulding County Board of Commissioners and all succeeding amendments thereto.

(Ord. No. 20-05, § 1, 4-21-2020)

ARTICLE 3 PERMITS AND APPROVALS REQUIRED FOR DEVELOPMENT OR

CONSTRUCTION

3.1 Developments of regional impact.

The Georgia Planning Act of 1989 authorized the department of community affairs (DCA) to establish procedures for regional review of development projects that are of sufficient size that they are likely to create impacts beyond the jurisdiction in which the project will be located. These large-scale projects are referred to as developments of regional impact (DRIs).

Projects that exceed the minimum thresholds established by the DCA are required to go the DRI process prior to commencement of development activity. This process involves submittal to the Coosa Valley Regional Development Center (RDC) and review and comments from other local governments and affected parties. Within 30 days, the RDC will issue the results of the review process including a review finding that the proposed activity is or is not in the best interest of the state.

3.2 Community development permits.

3.2.1 Land disturbance permits. No disturbance of the land, including clearing, grubbing or grading activities, shall commence or proceed except in accordance with the provisions of these regulations, unless the activity is exempt as an agricultural activity, or is for the construction of an approved private dwelling on a buildable lot of record. The following permits covering portions of the land development process may be issued in accordance with the requirements of these regulations:

1) Timber harvesting requirements. Pursuant to O.C.G.A. § 12-6-24, no timber permit shall be necessary for timber harvesting as an agricultural activity, with no grubbing or other land disturbance (as defined in the Georgia Soil Erosion and Sedimentation Act) activity. Provided, however, the following shall apply:

(a) All timber harvesting activities are to be consistent with the provisions of these regulations, including Article 9 (Soil Erosion and Sediment Control), as well as the Paulding County Zoning Ordinance, and all other ordinances of the Paulding County Code unless otherwise provided herein.

(b) A 25-foot undisturbed buffer from any county road right-of-way, excluding driveways, must be maintained.

(c) Prior written notice shall be required of any person or firm harvesting such timber for each separate tract to be harvested thereby, shall be in such form as prescribed by the director of community development, and shall consist of the following:

(1) A map or survey of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road;

(2) A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale, or owner harvest for purposes of ad valorem taxation under O.C.G.A. § 48-5-7.5;

(3) The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale or of the timber owner if the harvest is an owner harvest; and

(4) The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber.

(d) Notice may be submitted in person, by transmission of an electronic record via telefacsimile or by mail to the community development department. Provided however, that if a telefacsimile is used, an original of the notice must follow by U.S. mail to the community development department.

(e) In the event the ingress and egress route for the timber operation shown in the notice to the county intersects with and includes property located in the incorporated municipalities, the notice, as set forth herein, shall also be provided to said applicable municipality.

(f) In conjunction with the notice provided for above, a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting the county against any damage caused by such person, firm or entity in the amount of $5,000.00 or at the option of the person, firm or entity harvesting the timber, a valid irrevocable letter of credit issued by a bank or savings and loan association (as described in O.C.G.A. § 7-1-4), protecting the county against any damage caused by such person, firm or entity in the amount of $5,000.00, must be submitted to the community development department. If said bond or letter of credit is not submitted with the notice, the notice shall not be or remain effective for such harvesting operations unless and until the person or firm providing such notice has delivered to the community development department a valid surety bond, as described above, or a valid irrevocable letter of credit, as described above. For purposes of this paragraph, any such surety bond or letter of credit shall be valid only for the calendar year in which it is delivered.

(g) Notice shall be effective for such harvesting operation on such tract within such unincorporated area of the county upon receipt of the same by the community development department, provided said surety bond and/or credit letter is provided therewith, and until such time as the person, firm or entity giving such notice has completed the harvesting operation for such tract. Provided however, any subsequent change in the facts required to be provided for purposes of such notice shall be reported to the community development department within three business days after such change.

(h) The notice requirements provided herein shall be applicable to any such timber harvested on or after the effective date of the ordinance from which this subsection 1) was derived.

(i) Persons, firms or entities which will be harvesting timber are not required to receive a driveway permit or road use permit provided the information required above in the notice is furnished. However, all persons, firms or entities which will be completing timbering activities by utilizing county maintained roads and rights-of-way are hereby on notice that damage to said roads and/or rights-of-way will result in forfeiture of the surety bond and/or credit unless such damage is repaired within 90 days upon receipt of notification of the damage to the roads and/or rights-of-way by the county to the persons, firms or entities at issue.

(j) In the event grubbing or other land disturbance (as defined in the Georgia Soil Erosion and Sedimentation Act) activity is included as a part of the timbering activity, a grubbing, land disturbance or other such applicable permit must be acquired in accordance with the Paulding County Development Regulations.

(k) Nothing in the ordinance from which this subsection 1) was derived shall exempt any persons, firms or entities which will be harvesting timber from complying with the Manual for Uniform Traffic Control Devices or other applicable Paulding County Department of Transportation traffic control regulations. In addition, all persons, firms or entities which will be harvesting timber shall be responsible for posting advance warning signs near the ingress and egress driveway location of the timbering site along the right-of-way. Said signage shall remain posted during the pendency of the timbering operation.

(l) Violation of the notice requirements of the ordinance from which this subsection

1) was derived shall be punishable by a fine not exceeding $500.00.

2) Grading permit.

(a) A grading permit, which may include clearing and grubbing, may be issued based on approval of a grading plan, soil erosion and sediment control plan, and hydrology study. Grading activities must also be consistent with the zoning ordinance, any conditions of zoning approval and the comprehensive plan (as applicable). A grading permit may also be issued for earth-borrow, where no development or construction is proposed or imminent, based on approval of the same items.

(b) A permit authorizing but limited to grading (and clearing and grubbing) shall expire unless activities are commenced within 60 days of issuance of the permit or if activities lapse and the project is abandoned for a period exceeding 14 calendar days. Any site for which the grading permit expires shall immediately be stabilized to prevent erosion.

(c) A grading permit shall be limited in its authorization to land grading activities along with associated clearing and grubbing, and demolition activities, and may authorize the construction of storm drainage improvements and soil erosion and sedimentation facilities as allowed by the permit itself. The approval of a grading permit shall not imply the approval of or authorization to construct any improvements, buildings or other structures on the property.

3) Development permit.

(a) A development permit shall be issued to authorize all activities associated with the land development process, including clearing and grubbing, grading and the construction of such improvements as streets, surface parking areas and drives, sewer systems, stormwater drainage facilities, sidewalks, or other structures permanently placed on or in the property except for buildings or other structures requiring the issuance of a building permit.

(b) A development permit (which may include grading, clearing and grubbing) shall be issued at the developer's request following approval of a preliminary plat and residential construction plans for a subdivision project, or nonresidential construction plans for a nonsubdivision project, as detailed in article 4 of these regulations. All plans approved for a development permit shall expire after 12 months if no permit is issued within that time period.

(c) A development permit shall expire 12 months after issuance unless development activity as authorized by the permit is initiated within the 12-month period or if such authorized activities lapse and the project is abandoned for a period exceeding 90 calendar days. Provided, however, that the community development director may approve one extension not exceeding three months within which time development activity must commence or the permit shall expire. Said extension shall be applied for within the first 12 consecutive calendar months after the permit's issuance.

(d) For the purposes of these regulations, a lapse in or suspension of development activity as authorized by a development permit, as a direct result of action or inaction on the part of Paulding County completely beyond the control of the developer, shall not be considered as a lapse in activity causing the development permit to expire. The 12 months within which development activity must begin shall exclude any such time period during which the activity is prohibited or has been caused to lapse by said county action or inaction.

3.2.2 Building permits.

1) Single-family detached, single-family attached, cottage dwelling, duplex and townhouse subdivisions.

(a) A building permit for a single-family detached, single-family attached, cottage dwelling, duplex and townhouses in a platted subdivision may be issued after the recording of a final plat or after the lot upon which the building is to be located has otherwise become a buildable lot of record. The following also apply to the issuance of such building permits:

i. Manufactured homes cannot be placed in platted subdivision.

ii. Approval of a house location plan by the community development department may be required prior to issuance of the building permit as noted and conditioned on the final plat.

iii. In all such lots requiring house location plan pursuant to subsection (i), an as-built survey of the dwelling, building or structure shall be provided to the community development department prior to final inspections and the issuance of a certificate of occupancy. In the event the as-built survey shows the dwelling does not have proper setbacks, flood standards set forth herein in article 10, floor elevations or other discrepancies, the community development department may deny the issuance of the certificate of occupancy.

(b) Within any single-family detached, single-family attached, attached cottage dwelling, duplex and townhouse subdivision that is under construction on the basis of approved preliminary plat and development permit, up to six model homes may be permitted for construction on proposed lots prior to final plat approval and recordation, subject to the following requirements:

i. Paved road access must be in place between each model home and the nearest public street.

ii. The main water line shall be installed, pressurized, and providing potable water service in front of the model home prior to construction, including providing adequate fire-fighting pressure and flow at the nearest fire hydrant.

iii. Sewer mains, and taps, including those off-site mains serving the model home shall be installed and have met test criteria for placing them in service.

iv. Such model homes must obtain a limited certificate of occupancy which shall only authorize the use of the model home for sales and marketing purposes. No model home may be occupied as a residence until the model home obtains a full certificate of occupancy.

2) Single-family and duplex private dwellings.

(a) A private dwelling approval is required prior to issuance of a building permit on any property that is not part of a platted subdivision.

(b) A current survey plat is necessary showing street right-of-way width, easements, etc.

(c) A private dwelling form is required to be approved by the community development department, health department, tax assessor's department, department of transportation and the water, sewer and environmental services department prior to issuance of a building permit.

(d) More than two lots created as a result of subdividing parcels must meet the subdivision requirements of these regulations.

3) Nonresidential and multifamily structures.

(a) Issuance of a building permit for any principal building other than a singlefamily detached or duplex residence (and associated accessory structures) shall first require issuance of a development permit for the building site, and the building permit shall be consistent with said development permit.

(b) Building plans must be reviewed and approved by the community development director or his designee prior to permitting for all structures, except for one and two-family residences or accessory structures. Building plan approval shall expire after one year, after which re-review and approval by the community development department shall be required prior to issuance of a building permit for the building or additional buildings.

(c) Building permits shall only be issued on buildable lots of record, as defined in these regulations, except under special circumstances limited to and as specifically described in this section. In nonresidential subdivisions, building permits may be issued by the community development department on the basis of an approved preliminary plat with corresponding construction plans for specific buildings and associated site improvements and after a development permit has been approved. Issuance of the building permits shall be conditioned on the following:

i. A maintenance bond or other approved surety shall have been received in a form acceptable to the county attorney, drawn in favor of Paulding County in accordance with these regulations.

ii. Fire services division approval shall be required prior to issuance of any building permit, which may include approval of acceptable access and water under pressure for combustible construction.

iii. Approval of the health department for on-site sewage disposal or by the water, sewer and environmental services department for a building to be served by public sewer shall be required prior to issuance of any building permit.

iv. Construction of the required public improvements shall proceed concurrently with construction of the buildings.

v. No certificate of occupancy shall be approved for any structure within the subdivision prior to recording of the final plat without the express written approval of the community development director.

4) Health department approval for on-site sewage disposal. For any structure to be served by on-site sewage disposal, a permit issued by the health department shall be required prior to issuance of a building permit. Said permit may first require approval by the health department of a plan showing the location of the sewage disposal system and other site improvements, in accordance with their regulations.

3.2.3 Plan review and approval. Any developer of land within Paulding County's jurisdictional control shall first submit to the community development department plats and construction plans as required by these regulations, and shall have been granted a permit consistent with these regulations and approved by the department prior to the initiation of development activities. Approval of plans by Paulding County officials or employees shall not imply nor transfer acceptance of responsibility for the application of the principles of engineering, architecture, landscape architecture or any other profession, from the professional corporation or individual under whose hand or supervision the plans were prepared and sealed. Article 4 of these regulations details the elements of the required plans.

3.2.4 Interdepartmental review and approval. The community development department shall not issue a permit for any development activities until all plats and construction plans, as applicable, have been approved by such other departments or agencies as may have authority or jurisdiction over said activities in whole or in part.

3.2.5 Activities limited to permit authorization. Development activities shall be limited to those as authorized by the applicable permit and as may be further restricted by conditions of approval pertaining thereto attached by the community development department or other department or agency as may have authority or jurisdiction over said activities in whole or in part.

3.2.6 Developer's responsibility for compliance. No permit shall be interpreted to relieve any developer or subdivider of the responsibility of maintaining full compliance with all codes, ordinances and other regulations of Paulding County except as amended by an approved variance, or other relief granted through applicable formal appeal procedures for a specific property or application. Any permit issued in error or in contradiction to the provisions of an adopted code, ordinance, or regulation of Paulding County shall be considered to have been null and void upon its issuance.

(Res. No. 02-13, § 1, 6-25-2002; Ord. No. 20-05, § 2, 4-21-2020)

3.3 Department of transportation permits.

3.3.1 Road use permit. The Paulding County Road Use Ordinance was established to protect the county's bridges, ditches, and road system from damage and excessive maintenance costs occasioned by the travel of heavily laden vehicles. In addition to land disturbance permits, a road use permit may be required in accordance with the road use ordinance and the Paulding County Department of Transportation.

3.3.2 Encroachment permit. In addition to land disturbance permits, an encroachment permit may be required in accordance with the Paulding County Utilities Ordinance and the Paulding County Department of Transportation.

(Ord. No. 22-15, § 1 (Exh. A), 12-13-2022; Ord. No. 23-09, § 1 (Exh. A), 9-12-2023)

3.4 Public safety permits.

3.4.1. Open burning for the purpose of land clearing. All contractors must call the Georgia Forestry Commission at (770) 443-7821 to obtain a land clearing burn permit.

3.4.2 Blasting requirements.

1) The following requirements must be presented to the Paulding County Fire Chief's office:

(a) A certified copy of the State of Georgia Explosive License issued by the state.

(b) A certified copy of liability blasting insurance.

(c) Exact location of blasting activity.

(d) Notification of 911 prior to blasting.

(e) Familiarity with Chapter 120-S-10, Georgia Safety Regulations.

Note: OSHA requires that Title 29 C.F.R; Part 1926 Subpart U, Blasting and use of explosives be compliant with all blasting operations contractors.

3.4.3 Trenching/excavation requirements. All work must be in compliance with the provision with any applicable laws of the State of Georgia or the United States or any rules and regulations of the United States Department of Labor Occupational Safety and Health Administration in Title 29 C.F.R. Part 1926, Subpart P. 50-652.

3.4.4 Special hazard building permit.

1) Authorization must be obtained from the state fire marshal, local fire chief or state inspector for any special hazard building as defined by O.C.G.A. § 25-2-13, as amended, prior to the issuance of any building permit. Specifically, and without limitation these include the following:

(a) Buildings more than three stories in height.

(b) Residential structures for three or more families greater than three stories in height.

(c) Any building with more than 15 sleeping accommodations for hire.

(d) Schools or academies with more that 15 children.

(e) Hospitals, health care and nursing center, and schools.

(f) Racetracks, stadiums and grandstands.

(g) Theaters, auditoriums, restaurants, bars, lounges, nightclubs, and public assembly of 300 or more, or 100 or more where alcohol is served.

(h) Church with occupant load of 500 or more.

(i) Department or retail stores in excess of 25,000 square feet.

(j) Group day care and day care center where more than six children are kept.

(k) Licensed personal care homes.

(l) Landmark buildings.

2) An application, consisting of plans for structural reviews involving any special hazard building must first be submitted to the state fire marshal for review and approval prior to applying for a building permit.

(Res. No. 12-31, § 4, 9-25-2012)

ARTICLE 4 PLAN REVIEW REQUIREMENTS

4.1 Submittal process.

4.1.1 Review of plats and plans required.

1) All preliminary plats, construction plans and final plats must be submitted to the development control committee for review and approval prior to the commencement of land disturbance or construction activities. The community development department (hereafter referred to in this article as "the department") shall coordinate the committee's review and approval process.

Preliminary plats and construction plans will be held to the personnel attendance requirements, comment implementation period, and additional fees shown below:

Plan Review Thresholds Preliminary Plats:

Submittal Personnel Attendance Requirement Comment Implementation Period (Mandatory minimum number of days that shall pass between issuance of previous submittal comments and receipt of future submittal to ensure responsible implementation of previous comments) Additional Fees 4th Both the Design Professional and Owner/ Developer are required to meet in person with Staff at the following Thursday plan review meeting.

5th Same as above 30 days between issuance of 4th submittal comments and receipt of any 5th submittal.

Fees for all staff time spent on plan review/ discussion of submittals will be required, based on hourly rate of Staff.

Fees shall be paid in full prior to the receipt of comments.

6th Same as above 60 days between issuance of 5th submittal comments and receipt of any 6th submittal.

Same as Above 7th Same as above 90 days between issuance of 6th submittal comments and receipt of any 7th submittal.

Same as Above 8th Same as above 120 days between issuance of 7th submittal comments and receipt of any future submittal.

Same as Above Construction Plans:

Submittal Personnel Attendance Requirement Comment Implementation Period (Mandatory minimum number of days that shall pass between issuance of previous submittal comments and receipt of future submittal to ensure responsible implementation of previous comments) Additional Fees 5th Both the Design Professional and Owner/ Developer are required to meet in person with Staff at the following Thursday plan review meeting.

6th Same as above 30 days between issuance of 4th submittal comments and receipt of any 5th submittal.

Fees for all staff time spent on plan review/ discussion of submittals will be required, based on hourly rate of Staff.

Fees shall be paid in full prior to the receipt of comments.

7th Same as above 60 days between issuance of 5th submittal comments and receipt of any 6th submittal.

Same as Above 8th Same as above 90 days between issuance of 6th submittal comments and receipt of any 7th submittal.

Same as Above 9th Same as above 120 days between issuance of 7th submittal comments and receipt of any future submittal.

Same as Above

2) All information requested on applications for plat or plan review must be provided;

incomplete applications will not be accepted. Likewise all plats and plans must contain the minimum information outlined in this article. The absence of necessary design data shall result in plats and plans being resubmitted for a future plan review date.

3) Flowcharts detailing the review process for both residential subdivisions and nonresidential developments are shown on pages 31 and 32 of this article.

4.1.2 Pre-application conference (optional).

1) Whenever any subdivision or development of a tract of land is proposed to be made, whether residential or nonresidential in nature, the developer is encouraged to present to the development control committee preliminary documents and graphic exhibits to allow early evaluation of the developer's intentions as well as coordination with the comprehensive plan, zoning ordinance and other county regulations.

2) A pre-application conference can be scheduled through the community development department for each Thursday. The request for a pre-application conference must be by calling the department by 5:00 p.m. on Wednesday of the preceding week (in other words, eight days prior to the requested conference date). The following information shall be required at the time the pre-application conference is requested:

(a) Location of project site.

(b) Tax parcel or street address.

(c) District and land lot(s).

(d) Name of person to contact for confirmation of appointment.

(e) Telephone number that the contact can be reached on Thursday morning.

(f) Number of people to attend their conference along with their names and company affiliation.

(g) The general nature of the information sought from the various county departments.

(h) The type of project proposed.

4.1.3 Water pressure, flow test, and fire hydrant spacing requirements for preliminary plat approval. (Revised 2001)

1) A water pressure and flow test shall be conducted and approved by Paulding County before applying for preliminary plat review and approval as described in section 4.1.4 below. An approved water pressure and flow test is defined as a corrected flow rate (QC) that meets the minimum fire flow rate as outlined in the table below.

2) In addition to any other preliminary plat requirements, the following information shall be provided on the preliminary plat; tested flow rate (QT

), pressure recording chart (minimum 24-hour, however, pressure recording duration may be increased at the discretion of the water and sewer system director), static pressure, residual pressure, tested hydrant location, tested hydrant elevation, date of field flow test measurements, computed available flow rate (QA) at the field tested hydrant, corrected flow rate (QC) for the proposed development location, all associated computations, and the appropriate hydrant spacing in accordance with the table below.

3) The tested flow rate (QT ), shall be computed the using the orifice equation below based on the actual field measurements:

QT = [27 (d)2 (P)0.5] * k Where:

QT (gpm) = tested flow rate at the pilot location, reported in gallons per minute d (in) = orifice diameter tested, typically 2.5 inches

P (psi) = pilot pressure measured in the flow stream k (unitless) = flow discharge efficiency factor, generally accepted to be 0.90

4) The available flow rate (QA) shall be computed by adjusting the tested flow rate at the pilot location for the minimum allowable residual pressure (20-psi), deviations in hydrant testing elevations, low hydraulic grade line conditions (corrected at 50 percent of the tank overflow elevation), and the sustained 24-hr pressure (pump-off) conditions. The available flow rate (QA) shall be computed using the following equation:

QA = { ([s' -20)/(S - R)]0.54 } * QT

Where:

QA (gpm) = available flow rate at the pilot location, adjusted for local field conditions s' (psi) = static pressure adjusted for low hydraulic grade line conditions S (psi) = static pressure prior to hydrant flow test

R (psi) = residual pressure during hydrant flow test

5) The minimum fire flow rate used to design a proposed development shall correspond to the corrected flow rate (qc) that has been projected to the proposed development.

The corrected flow rate (qc) shall be computed by adjusting the available flow rate (qa) to reflect conditions at the proposed development site. Corrected flows may be projected from the nearest water distribution main where the field measured flow test was performed to a proposed development location using accepted hydraulic engineering design practices that account for changes in elevation head, frictional losses through meters, etc.

6) Minimum fire flow and maximum hydrant spacing shall be completed in compliance with the chart below.

Minimum Fire Flow and Maximum Hydrant Spacing Distance Between Any Structure (ft) in Development Minimum Fire Flow (gpm) with 20-psi Residual Pressure Maximum Hydrant Spacing;sup sup; (ft) >100 500 1,000 31 - 100 750 800 10 - 30 1,000 800 <10 1,000 500 Commercial/industrial 1,000a 500c

a. Minimum flow may be upwardly adjusted based upon the written recommendation of the county fire chief setting forth any special conditions of the development which require additional flow.

b. Fire hydrants shall be located at the end of every water line, the back of cul-de-sacs, and the entrances of new developments regardless of the maximum allowable spacing distances. Hydrants shall be located at road intersections whenever feasible as determined during the plan review process.

c. For commercial/industrial developments, the hydrant spacing shall be the hose lay distance and shall be measured from all portions of the building exterior.

In the event the corrected flow rate for a proposed development is less than the minimum required flow rate in the minimum fire flow and hydrant spacing table above, an owner/developer may elect to propose off-site improvements to the water distribution system that would result in an increase in the corrected flow rate (qc).

All proposed system improvements shall be designed by an independent professional engineer at the expense of the owner/developer. The proposed improvements shall be reviewed by the water and sewer system department and authorized by the water and sewer system director. Any approved off-site improvements shall be described on the preliminary plat prior to preliminary plat review and approval as described in section 4.1.4 below.

7) The fee for the water pressure and flow test shall be administered through the Paulding County Water and Sewer System Department. The Paulding County Water and Sewer System Department should be contacted for additional information regarding the water pressure and flow test.

4.1.4 Application for preliminary plat review and approval.

1) All preliminary plats shall be prepared to the specifications listed in section 4.2 of these regulations. Application for preliminary plat approval shall be submitted to the department using an application form to be determined by the community development director. The application, along with six copies of the preliminary plat and the appropriate fee, shall be submitted to the department no later than 4:30 p.m.

on Wednesday of the week preceding the week in which a preliminary plat review conference is desired. Preliminary plats submitted after this deadline will not be reviewed by Thursday of the following week.

2) Each project submitted for review shall be allotted a 30-minute appointment for the date and time assigned for review before the development control committee. If a developer, engineer, surveyor or landscape architect has several projects for review on the same week, an effort will be made to schedule contiguous appointments for his or her convenience. However, appointment times are scheduled on a first come-first served basis. Only those projects scheduled well in advance may be so scheduled.

3) A list of requirements and corrections will be discussed at the time of the scheduled review. If the development control committee determines that an insufficient amount of information, detail or design was provided for review, the project shall be resubmitted. Appointments will only be assigned for projects when the completed preliminary plats are resubmitted for review.

4.1.5 Submission of construction plans to health department may be required. In addition to the requirements for submitting construction plans outlined in section 4.1.6 below, an extra set of construction plans shall be submitted to the Paulding County Health Department if a project is to be served by an on-site sewage disposal system. Other projects requiring the review and approval of this department are identified elsewhere in these regulations.

4.1.6 Application for construction plan review.

1) Construction plans shall be prepared to the specifications listed in section 4.3 of these regulations for residential subdivisions and section 4.4 for nonresidential developments. Application for construction plan approval shall be submitted to the department using an application form to be determined by the community development director. The application, along with eight copies of the construction plans, two copies of a hydrology study and the appropriate fee, shall be submitted to the department no later than 4:30 p.m. on Wednesday of the week preceding the week in which a construction plan review conference is desired. Plans submitted after this deadline will not be reviewed by Thursday of the following week.

2) Construction plans shall be no larger than 24 inches by 36 inches. Stormwater detention analysis must be conducted in accordance with article 8 of these regulations. Other methods of hydrological analysis must be pre-approved for use by the department.

3) Each project submitted for review shall be allotted a 30-minute appointment for the date and time assigned for review before the development control committee. If a developer, engineer, surveyor or landscape architect has several projects for review on the same week, an effort will be made to schedule contiguous appointments for his or her convenience. However, appointment times are scheduled on a first come-first served basis. Only those projects scheduled well in advance may be so scheduled.

4) A list of requirements and corrections will be discussed at the time of the scheduled review. If the development control committee determines that an insufficient amount of information, detail or design was provided for review, the project shall be resubmitted. Appointments will only be assigned for projects when the completed construction plans are resubmitted for review.

4.1.7 Project approval and permit.

1) After all requirements have been met and any corrections made to the construction plans, said plans may be submitted for their approval. Eight sets of amended construction plans and two copies of a hydrology study shall be presented for approval. The construction plans must be accompanied by the "plan review copy" of the plans reviewed and comments returned by the development control committee.

2) The department will issue a development permit for the project upon successfully obtaining the approval of the development control committee. The development permit will be delivered to the project site by the department's development inspector at the time of the scheduled pre-construction meeting.

4.1.8 Utility construction.

1) It shall be the developer's responsibility to notify the necessary utility companies involved in burying main and/or service cable and/or pipe (including conduit) in commercial and residential developments where there are streets to be dedicated to Paulding County for maintenance.

2) Sufficient notice shall be given so as to allow for the burying of long side services, intersectional crossings and to make splices, taps or relocations within acceleration/ deceleration lanes at project entrances. No paving work on the public right-of-way shall be done until clear of all above and below ground utility work.

4.1.9 Pre-construction conference.

1) Upon completion of construction plan review, the developer shall phone the department to schedule a pre-construction conference to be held on the site of the project. The primary purpose of this conference is to discuss policy, procedures and construction plans and to present the developer with the development permit.

2) Representatives of Paulding County's Community Development, Transportation and Water, Sewer and Environmental Services Departments shall attend the preconstruction conference, as shall the developer of the project. The developer is strongly encouraged to bring to the conference the grading, paving, water, sewer and other contractors that will be working on the project.

3) The developer shall be presented a "pre-construction procedure checklist" at the conference and that checklist will be reviewed with him by the aforementioned Paulding County representatives. The developer shall sign a statement following the conference, attesting to his understanding of the county's development requirements and his responsibility to abide by said requirements.

4.1.10 Business licenses. All developers, contractors and subcontractors shall obtain a valid business license prior to performing any work within Paulding County. This applies to contractors and subcontractors performing the following work: erosion and sediment control;

grading; storm drainage; curbing; public utilities (water and sewer); all other utilities to be installed in proposed or existing county-maintained right-of-way; and paving (including fine grading of subgrade and base installation).

4.1.11 Fees. Article 14 of these regulations state the appropriate fees for reviewing and approving preliminary plats and construction plans, issuing land disturbance permits and conducting inspections of development projects.

(Ord. No. 23-09, § 1 (Exh. A), 9-12-2023)

4.2 Checklists for preliminary plats.

4.2.1 General information.

• Show name of project and date of submittal.

• Show the name, address and phone number of the developer.

• The minimum scale for preliminary plats shall be 1" = 20' and the maximum scale shall be 1" = 100' unless otherwise approved by the development control committee.

• Plats shall be drawn on no larger than a 24-inch by 36-inch sheet of paper.

• Plats shall include north arrow and show land lot lines and district.

• Provide a tie point to the nearest intersection.

• Plats shall include a location/vicinity map with land lot lines; minimum scale 1" = 2,000'.

• Paulding County does not guarantee water service above an elevation of 1,150

MSL.

4.2.2 Existing conditions.

• State the zoning category of the property.

• Note the zoning case number, date of approval and all conditions of zoning (if applicable).

• Show the zoning of adjacent properties including property owners name, subdivision name, lot numbers, block letters, land uses, etc.

• If any zoning variances were obtained for the property, note the variance case number, date of approval and type of variance (and conditions) approved.

• Show any jurisdictional (city or county) boundary lines.

• Show topography by contours at vertical intervals of not more than five feet.

• Show location of streams, lakes, swamps and land subject to flooding as determined from past history of flooding or hydraulic engineering calculations of existing conditions.

• Show all structures, both above and below ground, that might interfere with the proposed construction.

• Show name, location, right-of-way, dimension from centerline, pavement width and surface type of all streets and roads on or adjacent to the property to be subdivided.

• Show location and right-of-way of railroads on or adjacent to the property.

• Show the size and location of existing sewers, water mains, drains, culverts and all other facilities and structures, both above and below ground, within the tract or within the right-of-way of streets or roads adjoining the tract.

• Identify the sewerage basin(s) within which the proposed development is located.

• Identify the acreage of each drainage area affecting the proposed subdivision.

• Show water pressure and flow test results.

• All elevations shall refer to mean sea level datum where public water and/or public sewers are to be installed.

4.2.3 Proposed conditions.

• State the total number of acres and number of lots.

• Show the layout of all lots, including front, side and rear building setback lines, scaled dimensions on lots and utility easements with width and use.

• Note the minimum lot size requirement.

• Show the proposed unit division or stage development, if any.

• Identify all land to be reserved or dedicated for public use.

• Show all required buffers (if applicable).

• Show ten-foot "No Access Easement" along the rear of all double frontage lots.

• Show and state names, right-of-way, dimension from centerline, pavement width and surface type of all proposed roads.

• Show relevant curve data in the form of a curve table on the plat.

• Show water line plan and sewer line plan, including all lines required to serve any lots to be developed and any surrounding property that may be served through the property.

4.3 Checklists for residential construction plans.

4.3.1 General requirements.

• Show project name and date of submittal.

• Show developer's name, address and phone number.

• Show owner's name, address and phone number if other than developer.

• Show engineer/designer's name, address and phone number.

• Include a copy of the approved preliminary plat.

• Show any jurisdictional (city or county) boundary lines.

• Show location/vicinity map with land lot lines; minimum scale 1" = 2,000'.

• Show graphic scale, north arrow and date. The north point shall be identified as magnetic, true or grid point.

• Show land lot lines, corner and district.

• Plans shall be drawn to a scale of not less than one inch equals 50 feet, unless otherwise specified herein.

• Show closed property boundary with bearings and distances of all property lines.

• State the total acreage of the project.

• Show all existing conditions, structures, pavement widths, etc.

• Plans shall have a professional engineer/landscape architect/surveyor's seal with signature.

• Include a 24-hour emergency contact name and phone number in bold type (No smaller than 20 point type) on cover sheet, sediment and erosion control plan and grading plan.

• Include the following note: "Developer shall attend a pre-construction conference at the project site with representatives of the Paulding County Departments of Community Development, Transportation and Water, Sewer and Environmental Services."

• Include the following erosion control maintenance statement: "Erosion control measures shall be maintained at all times. If full implementation of the approved plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."

4.3.2 Engineering checklists.

1) Grading/storm drainage.

• Topographic layout of the development must be at two-foot contour intervals based on mean sea level datum (existing and proposed contours).

• Give on-site MSLE benchmark.

• Identify the location, size and length of existing drainage structures with drainage area.

• Show drainage calculations stating how drainage structures were sized. Calculations must be sealed by a professional engineer or landscape architect.

Drainage calculations may also be submitted and sealed by a registered land surveyor, licensed in the State of Georgia who are qualified to complete such calculations. Indicate outlet velocity at all pipe outlets.

• Show location and design criteria of accessory drainage structures (headwalls, drainage ditches, catch basins, junction boxes, drop inlets, retention areas and retention outlet controls).

• Include street profiles with all cross drainpipes located.

• Show profile of storm drainage pipes.

• Indicate drainage at intersections using flow arrows on plan or profile sheet.

• State the 100-year floodplain limits and elevations, or note absence. Indicate community panel number and date of panel referenced. Show/note lot FFE at 100-year elevation plus four vertical feet (if applicable).

• Show ingress/egress easement to stormwater detention structure and sufficient maintenance easement to include the surface area inundated by the 100-year storm event and 100-year backwater elevation on all pipes.

• Show or indicate whether small parts of a site are in compliance with a previously approved drainage plan of parent site.

• Identify water travel distance in street between catch basins.

• Show easements for all stormwater directed across property lines and piping system.

• Show easements covering all roadway fill constructed on individual building lots.

• Provide detail of outlet control structure.

• Show cross section through the detention pond dam.

• Show/note all storm structures per GA DOT standards.

• All live creek/springs (20 acres +) to be BCCMP or RCP for entire pipe length.

• Show/note all pipe gauge/class per GA DOT 1030-D standard.

• Show design/detail of all drainage ditches.

2) Site hydrology study.

• Hydrology study must be prepared by a professional engineer. Hydrology study may also be prepared by a registered land surveyor, licensed in the State of Georgia.

• Include narrative explaining the rationale and method used in design.

• Include a drainage area sketch showing all drainage basins and sub-basins.

Drainage basins shall be clearly labeled and correlate to basin identifiers used in the study.

• Include a drainage area sketch showing the direction of flow and acreage of drainage area for stormwater entering and exiting the site.

• Give a summary of pre-development and post-development flows.

• Allowable discharge from the site depends upon downstream conditions. Explain impact on lower adjacent properties. Describe the condition of the downstream receiving the concentrated discharge from the site.

• Identify off-site drainage.

• Identify drainage areas that bypass detention in a developed state. Demonstrate how these flows are managed to a pre-development rate.

3) Soil erosion and sediment control.

(a) Site plan requirements.

• Existing and planned contours shall be shown with contour lines drawn with an interval in accordance with the following:

Map Scale Ground Slope Contour Interval, feet 1 inch = 100 ft. or larger scale Flat 0—2% 0.5 or 1 Rolling 2—8% 1 or 2 Steep 8%+ 2, 5 or 10

• Show neighboring areas such as streams, lakes, residential areas, etc. that might be affected by the proposed subdivision.

• Give location of erosion and sediment control practices, using uniform coding symbols from the Manual for Erosion and Sediment Control in Georgia, Chapter 6, with legend.

• Delineate all state waters located on or within 200 feet of the project site.

• Delineate contributing drainage areas both on and off site.

• Delineate the 40-foot undisturbed buffers of state waters and 100-foot management zones along designated trout streams. Where encroachment into buffers or management zones is proposed, provide documentation that appropriate variances have been obtained.

• Include soil series and their delineation.

(b) General notes.

• "Additional erosion control devices to be used as required by Paulding County."

• "Disturbed areas left idle for two to four weeks, and not to final grade, will be established to temporary vegetation (Ds1). Disturbed areas left idle for four weeks or more will be established to permanent vegetation (Ds2). All areas to final grade will be established to permanent vegetation within two weeks."

• "When hand planting, mulch (hay or straw) should be uniformly spread over seeded area within 24 hours of seeding."

• "During unsuitable growing seasons, mulch will be used as a temporary cover (Ds3). On slopes that are 4:1 or steeper, mulch will be anchored."

• "Paulding county land disturbance permit must be displayed on site at all times during construction and in plain view from a county road or street."

• "Erosion and sediment control devices must be installed and inspected prior to any grading on site. Call (770) 443-7596 for an inspection."

• "Sediment/erosion control devices must be checked by the developer after each storm event. Each device is to be maintained or replaced if sediment accumulation has reached one half the capacity of the device."

(c) Other information.

• Include signature/seal of qualified plan preparer.

• Identify the size, in acres, of project or phase under construction.

• Show anticipated starting and completion dates for project events, including vegetation/mulching. Include the statement in bold letters that, "the escape of sediment from the site shall be prevented by the installation of erosion control measures and practices prior to, or concurrent with, land-disturbing activities."

• Include specific design information and calculations for all structural measures on site, such as temporary sediment basins, retrofitted detention ponds and swales.

• Show storm drain pipe and weir velocities and demonstrate how receiving area will accommodate discharges without erosion.

• For all temporary and permanent vegetative practices, include species, planting dates, and seeding, fertilizing, lime and mulching rates. Vegetative plan shall be site specific for appropriate time of year that seeding will take place and for this geographic region of Georgia.

• Include detailed drawings for all structural practices. Specifications must, at a minimum, meet guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.

4.3.3 Planning and zoning checklists.

• Show required buffer areas (if applicable).

• Provide a landscape plan for required buffer areas (if applicable).

• To satisfy street light requirements for new subdivisions, the following notes must be shown on the construction plans:

(a) "In accordance with the Paulding County Street Light District Ordinance (amendment 8/26/97), the developer of this subdivision must provide street lights."

(b) "The developer shall submit to the utility coordinator the street light layout prepared by the utility company that will provide the lighting service showing exact location of street lights within this subdivision."

(c) "The developer shall submit to the utility coordinator proof of payment to the utility company for installation of the street lights, including poles, fixtures and any other related items or materials necessary for installation."

(d) "The final plat shall annotate that street lights shall be installed in accordance with provisions of the street light ordinance."

(e) "The street light requirements must be met prior to obtaining any building permits or water meters for this subdivision."

4.3.4 Water and sewer checklists.

1) General requirements.

• Provide assurance that railroad and/or Georgia DOT permits have been applied for.

• Provide assurance that other utility encroachments, where necessary, have been applied for.

• Show water pressure and flow test results and 24-hour pressure chart.

• Include copies of all off-site recorded easements (water or sewer).

2) Required notes.

• "Minimum cover of 4' over water lines."

• "Water lines shall be 4' from back of curb on south and west sides of roadways."

• "Services shall be in road R/W."

• "See detail sheets for all water and sewer details."

• "Meters and meter boxes shall be installed as directed by Paulding County Water, Sewer and Environmental Services Department."

• "All Pipes shall be Class 350 Ductile Iron Pipe unless noted otherwise."

• "All services shall be Type K Copper unless noted otherwise."

• "Thrust blocks shall be used at all bends, tees, and plugs (see detail sheet)."

• "Long services shall be 1" inside 11 /2" PVC casing."

• "Compaction equipment shall be used on water mains and services under pavement."

• "Tracer wire approved by Paulding County Water, Sewer and Environmental Services Department shall be installed on all pvc mains."

• "All elevations are based on mean sea level."

• "The engineer will be required to furnish the water, sewer and environmental services department as-builts for all residential developments."

• "The developer shall install all water services up to and including the meter boxes for all residential developments."

• "The developer shall notify the water and sewer system inspector (770-445-7466) 24 hours prior to tapping the waterline."

Note. Water/sewer development fees will be given at final plan approval by this department. No water/sewer fees will be given over the phone or prior to plan approval.

3) Water system design.

• Paulding County does not guarantee water service above elevation 1,150 MSL.

• Include plan of current and all future phases of the development, showing streets, street names and lot layout.

• Give the proposed size, location and material of water mains and service laterals.

No other utilities should appear on the water plan layout sheet if such utilities tend to confuse or complicate the plans.

• Show the location and size of vacuum and air release valves (to be installed at highest points in the system).

• Show the location of thrust blocks, where needed.

• Show fire hydrant locations (existing and proposed).

• Show the location, material and sizes of existing water lines surrounding the proposed project.

• Specify methods and tie-in location with existing mains.

• Show the locations of existing and proposed valves and other appurtenances.

• Contours in feet above msl shall be shown on water plans. The contour interval shall not be greater than five feet.

• Plans should be on paper no larger than 24 inches x 36 inches.

• Minimum scale shall be 1 inches = 20 feet; maximum scale shall be 1 inch = 100 feet.

• Show proposed water meter sizes and locations.

• Show nearest valves on the existing main that will need to be closed to make the proposed tap (in case live tap is not used).

• The plans must have the seal of the Georgia Registered Professional Engineer who engineered the system.

4) Sanitary sewer design.

• Show name of the sewerage basin(s) within which the proposed development is located.

• Give the proposed size, location and material of sewer lines and service lines.

• Creek crossings require full scale details at one inch = 20 feet minimum including piers, collars and all other appurtenances. Rip rap and other erosion control devices will be required for all disturbed areas.

• Minimum sewer line depth in the roadway shall have six feet of cover.

• Maximum depth of the sewer line in the roadway is 18 vertical feet. The maximum depth of a sewer line outside of the roadway is 25 vertical feet.

• The maximum allowable distance between manholes is 400 linear feet.

• Ductile iron pipe is required for all outside drop manholes, last joint of pipe at all drop manholes greater than three feet, when clearances between sanitary sewer and storm drain crossings are two feet or less, or where depth of sewer line is greater than 14 feet or less than six feet of cover. Minimum depth of ductile iron pipe is four feet.

• Show all phases of the development. In the event the subdivision is developed in phases, the final construction plans for sewers may be submitted in phases or units. However, at the time the first phase is submitted, the engineer will need to submit one copy of the preliminary layout of the entire sewer system. This layout shall show all lines required to serve any lots to be developed and any surrounding property that may be served through the property. The site plan for each phase or unit shall contain a location drawing showing the relationship of the phase or unit to the total project and to the surrounding streets and sewer outfalls.

• Plan and profile sheets shall be provided for all sewers (except service laterals).

Profiles shall have a horizontal scale of not more than 100 feet to the inch and a vertical scale of not more than ten feet to the inch. The plan view shall be shown on the same sheet as the profile. Plan and profile views should have line designations, station numbers, manhole numbers and any other indexing necessary to easily correlate the plan and profile views.

• Plan and profiles shall show the following:

(a) Location and names of streets, sewers and drainage easements.

(b) Line of existing and proposed ground surface, the grade of the sewer between each two adjacent manholes, invert of sewer in and out of each manhole, and surface elevation of each manhole.

(c) All manholes shall be numbered on the plan and correspondingly numbered on the profile. The station number shall be shown for each manhole.

(d) The location and elevation of adjacent parallel stream beds and of adjacent lake surfaces shall be shown on the plan and profile.

(e) Sizes, locations and inverts of all special features such as connections to existing sewers, concrete encasement, collar walls, elevated sewers, piers, special manhole covers such as vented outfall or sealed covers, etc.

(f) All structures, both above and below ground, which might interfere with the proposed construction, particularly water mains, gas mains, storm drains, utility conduits, etc.

• Special detail drawings at a scale to clearly show the nature of the design shall be furnished to show the following particulars:

(a) All stream crossings and storm drain outlets with elevations of the stream bed.

(b) Details of all special sewer joints and cross sections.

(c) Details of special sewer appurtenances such as manholes, service connections, elevated sewers, piers, pipe bedding, special highway crossings, railroad crossings, etc.

Sewer plan notes:

• "No permanent structures shall be constructed within the permanent water or sewer easement."

• "The developer shall notify the water and sewer system inspector (770-445-7466) 24 hours prior to tapping the sewer line."

• "Sewer pipe shall have gravel bedding."

• "Transition joints between sewer pipes of different materials shall be accomplished by the use of adapters. Concrete collars are not acceptable."

• "All tie-ins to existing manholes shall be cored. All manholes require "kor-n-seal" or equal rubber boots. Equal boots must be approved by the water, sewer and environmental services department prior to use."

• "No sewer lines smaller than eight inches shall be tied to a county line or manhole, excluding service laterals."

4.3.5 Transportation checklists.

1) General information.

• Provide assurance that all Georgia DOT permits, if applicable, have been obtained.

• Add note: "Construction equipment shall not be parked in right-of-way, and must be stored within site."

2) Typical sections.

• Include paving and base elements on typical sections. Label each layer as to the thickness or spread rate, and type of material to be used.

• Express cross slopes of roadway pavement, shoulder surfaces and sidewalks as percentages. Show outer slopes by ratio, horizontal to vertical (e.g., 4:1).

• Provide lane and shoulder widths on typical sections. Width shall comply with article 5 of these regulations. Show minimum to maximum widths.

• For projects with guardrails, show typical guardrail section with additional shoulder width required for guardrail and anchorage placement.

• Show right-of-way widths.

• Label curb and gutter or typical sections per Georgia DOT and/or county standards.

• Show sidewalk or typical sections with width and cross slope.

• Show all existing and proposed utilities.

3) Road profiles.

• Profiles shall have a horizontal scale of not more than 1:100 and a 1:10 vertical scale.

• Profiles shall show existing ground and the proposed profile grade for the mainline, side road or streets and driveways.

• Profiles and plan views shall have corresponding stations.

• Show grades for all tangent stations.

• Vertical curves shall include the Point of Vertical Curvature (PVC), Point of Vertical Tangency (PVT) and each Point of Vertical Intersection (PVI).

• Show curve length between the PVC and PVT. Label the "K" factor for the curve and the curve length. Label the high point and the low point in the same manner as the PVC and PVT.

• Show and label all intersecting streets. This shall include the street name, station on the mainline, and the station on the intersecting street along a line oriented vertically and placed at the correct station along the mainline.

• Show the existing ground profile along the same horizontal alignment. This profile should depict the ground as it existed prior to the proposed construction, including ditches, creeks, etc., which may be intersected by the horizontal alignment.

4) Intersection details.

• Intersection detail sheets are required if additional details necessary for proper construction of items at road intersections cannot be clearly shown on the regular roadway plan sheets.

• Typical information that may be found on intersection detail sheets include edges of pavement, locations or elevations, dimensions, channelizing curbs and raised median locations, along with handicap ramps, drainage structures, traffic signal poles and utility poles.

• Indicate elevation along edges of pavement in the area of the intersection by listing the elevations at regular intervals or by using contours.

• Provide intersection grading plans where necessary to properly detail cross slope transitions and drainage requirements.

• Dimension and station all intersection details, including pavement widths, curb and median radii, radius returns, horizontal location of raised medians, center of median and/or channelization openings, lane tapers, etc.

• Show all existing and proposed traffic control devices and striping.

4.3.6 Health department checklist.

• Plans, specifications, soil data and, if required, absorption test data, shall be submitted to the health department for the purpose of obtaining a construction permit to install an on-site sewage management system, which will produce a sewage flow in excess of 2,000 gallons per day, when prepared in accordance with these rules, from any person who demonstrates to the satisfaction of the health department that they have sufficient knowledge of on-site sewage management system design.

• Soil evaluations shall be conducted by individuals meeting the requirement established in the health department's current Manual for On-Site Sewage Management Systems.

• Recommend a level two soil survey be completed.

4.4 Checklists for nonresidential construction plans.

4.4.1 General requirements.

• Show project name and date of submittal.

• Show developer's name, address and phone number.

• Show owner's name, address and phone number if other than developer.

• Show engineer/designer's name, address and phone number.

• Show any jurisdictional (city or county) boundary lines.

• Show location/vicinity map with land lot lines; minimum scale one inch = 2,000 feet.

• Show graphic scale, north arrow and date. The north point shall be identified as magnetic, true or grid point.

• Show land lot lines, corner and district.

• Plans shall be drawn to a scale of not less than one inch equals 100 feet, unless otherwise specified herein.

• Show closed property boundary with bearings and distances of all property lines.

• State the total acreage of the project.

• Show all existing conditions, structures, pavement widths, etc.

• Plans shall have a professional engineer/landscape architect/surveyor's seal with signature.

• Include a 24-hour emergency contact name and phone number in bold type (No smaller than 20 point type) on cover sheet, sediment and erosion control plan and grading plan.

• Include the following note: "Developer shall attend a pre-construction conference at the project site with representatives of the Paulding County Departments of Community Development, Transportation and Water, Sewer and Environmental Services."

• Include the following erosion control maintenance statement: "Erosion control measures shall be maintained at all times. If full implementation of the approved plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."

4.4.2 Engineering checklists.

1) Grading/storm drainage.

• Topographic layout of the development must be at two-foot contour intervals based on mean sea level datum (existing and proposed contours).

• Give on-site MSLE benchmark.

• Identify the location, size and length of existing drainage structures with drainage area.

• Show drainage calculations stating how drainage structures were sized. Calculations must be sealed by a professional engineer or landscape architect. Indicate outlet velocity at all pipe outlets.

• Show location and design criteria of accessory drainage structures (headwalls, drainage ditches, catch basins, junction boxes, drop inlets, retention areas and retention outlet controls).

• Include street profiles with all cross drainpipes located.

• Show profile of storm drainage pipes.

• Indicate drainage at intersections using flow arrows on plan or profile sheet.

• State the 100-year floodplain limits and elevations, or note absence. Indicate community panel number and date of panel referenced. Show/note lot FFE at 100-year elevation plus four vertical feet (if applicable).

• Show ingress/egress easement to stormwater detention structure and sufficient maintenance easement to include the surface area inundated by the 100-year storm event and 100-year backwater elevation on all pipes.

• Show or indicate whether small parts of a site are in compliance with a previously approved drainage plan of parent site.

• Identify water travel distance in street between catch basins.

• Show easements for all stormwater directed across property lines and piping system.

• Show easements covering all roadway fill constructed on individual building lots.

• Provide detail of outlet control structure.

• Show cross section through the detention pond dam.

• Show/note all storm structures per GA DOT standards.

• All live creek/springs (20 acres +) to be BCCMP or RCP for entire pipe length.

• Show/note all pipe gauge/class per GA DOT 1030-D standard.

• Show design/detail of all drainage ditches.

2) Site hydrology study.

• Hydrology study must be prepared by a professional engineer.

• Include narrative explaining the rationale and method used in design.

• Include a drainage area sketch showing all drainage basins and sub-basins.

Drainage basins shall be clearly labeled and correlate to basin identifiers used in the study.

• Include a drainage area sketch showing the direction of flow and acreage of drainage area for stormwater entering and exiting the site.

• Give a summary of pre-development and post-development flows.

• Allowable discharge from the site depends upon downstream conditions. Explain impact on lower adjacent properties. Describe the condition of the downstream receiving the concentrated discharge from the site.

• Identify off-site drainage.

• Identify drainage areas that bypass detention in a developed state. Demonstrate how these flows are managed to a pre-development rate.

3) Sediment/erosion control.

(a) Site plan requirements.

• Existing and planned contours shall be shown with contour lines drawn with an interval in accordance with the following:

Map Scale Ground Slope Contour Interval, feet 1 inch = 100 ft. or larger scale Flat 0 - 2% Rolling 2 - 8% Steep 8% +

0.5 or 1 1 or 2 2, 5 or 10

• Show neighboring areas such as streams, lakes, residential areas, etc. that might be affected by the proposed subdivision.

• Give location of erosion and sediment control practices, using uniform coding symbols from the Manual for Erosion and Sediment Control in Georgia, Chapter 6, with legend.

• Delineate all state waters located on or within 200 feet of the project site.

• Delineate contributing drainage areas both on and off site.

• Delineate the 40-foot undisturbed buffers of state waters and 100-foot management zones along designated trout streams. Where encroachment into buffers or management zones is proposed, provide documentation that appropriate variances have been obtained.

• Include soil series and their delineation.

(b) General notes.

• "Additional erosion control devices to be used as required by Paulding County."

• "Disturbed areas left idle for two to four weeks, and not to final grade, will be established to temporary vegetation (Ds1). Disturbed areas left idle for four weeks or more will be established to permanent vegetation (Ds2). All areas to final grade will be established to permanent vegetation within two weeks."

• "When hand planting, mulch (hay or straw) should be uniformly spread over seeded area within 24 hours of seeding."

• "During unsuitable growing seasons, mulch will be used as a temporary cover (Ds3). On slopes that are 4:1 or steeper, mulch will be anchored."

• "Paulding County Land Disturbance Permit must be displayed on site at all times during construction and in plain view from a county road or street."

• "Erosion and sediment control devices must be installed and inspected prior to any grading on site. Call (770) 443-7596 for an inspection."

• "Sediment/erosion control devices must be checked by the developer after each storm event. Each device is to be maintained or replaced if sediment accumulation has reached one half the capacity of the device."

(c) Other information.

• Include signature/seal of qualified plan preparer.

• Identify the size, in acres, of project or phase under construction.

• Show anticipated starting and completion dates for project events, including vegetation/mulching. Include the statement in bold letters that, "The escape of sediment from the site shall be prevented by the installation of erosion control measures and practices prior to, or concurrent with, land-disturbing activities."

• Include specific design information and calculations for all structural measures on site, such as temporary sediment basins, retrofitted detention ponds and swales.

• Show storm drain pipe and weir velocities and demonstrate how receiving area will accommodate discharges without erosion.

• For all temporary and permanent vegetative practices, include species, planting dates, and seeding, fertilizing, lime and mulching rates. Vegetative plan shall be site specific for appropriate time of year that seeding will take place and for this geographic region of Georgia.

• Include detailed drawings for all structural practices. Specifications must, at a minimum, meet guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.

4.4.3 Planning and zoning checklists.

• State zoning category of the property.

• Note zoning case number, date of approval, and all conditions of zoning on the plan (if applicable).

• Show zoning of adjacent properties including property owners' name, subdivision name, lot numbers, block letters, land uses, etc.

• Show required buffer areas on site plan (if applicable).

• Provide landscape plan for required buffer areas (if applicable).

• If any variances were obtained for the property, note variance case number, date of approval, and type of variance (and conditions) approved.

• State or show land lot lines and district on the plans. If it is not possible to show land lot lines, provide a legal "tie down" for the property, e.g. intersection of two R-O-W's distance and bearing from property to land lot line intersection or R-O-W intersection.

• State proposed use of site/buildings and square footage.

• Show setback from all roadways.

• Show distance from structure(s) to side and rear property lines.

• Note and show total number of parking spaces.

4.4.4 Water and sewer checklists.

1) General requirements.

• Provide assurance that all railroad and/or Georgia DOT permits have been applied for.

• Provide assurance that other utility encroachments, where necessary, have been applied for.

• Show water pressure and flow test results and 24-hour pressure chart.

• Provide copies of all off-site recorded easements (water or sewer).

• Provide letter of nonconflict from the Power Company where underground power is proposed.

• Show all meter locations and double check assemblies.

2) Required notes.

• "Minimum cover of 4' over water lines."

• "Water lines shall be 4' from back of curb on south and west sides of roadways."

• "Services shall be in road R/W."

• "See detail sheets for all water and sewer details."

• "Meters and meter boxes shall be installed as directed by Paulding County Water, Sewer and Environmental Services Department."

• "All pipes shall be Class 350 Ductile Iron Pipe unless noted otherwise."

• "All services shall be Type K Copper unless noted otherwise."

• "Thrust blocks shall be used at all bends, tees, and plugs (see detail sheet)."

• "Long services shall be 1" inside 1 1 /2" PVC casing."

• "Compaction equipment shall be used on water mains and services under pavement."

• "Tracer wire approved by Paulding County Water, Sewer and Environmental Services Department shall be installed on all PVC mains."

• "All elevations are based on mean sea level."

• "The engineer will be required to furnish the water, sewer and environmental services department as-builts for all residential developments."

• "The developer shall install all water services up to and including the meter boxes for all residential developments."

• "The developer shall notify the water and sewer system inspector (770-445-7466) 24 hours prior to tapping the waterline."

Note: Water/sewer development fees will be given at final plan approval by this department. No water/sewer fees will be given over the phone or prior to plan approval.

3) Water system design.

• Paulding County does not guarantee water service above elevation 1,150 msl.

• Give the proposed size, location and material of water mains and service laterals.

No other utilities should appear on the water plan layout sheet if such utilities tend to confuse or complicate the plans.

• Show the location and size of vacuum and air release valves (to be installed at highest points in the system).

• Show the location of thrust blocks, where needed.

• Show fire hydrant locations (existing and proposed).

• Show the location, material and sizes of existing water lines surrounding the proposed project.

• Specify methods and tie-in location with existing mains.

• Show the locations of existing and proposed valves and other appurtenances.

• Contours in feet above msl shall be shown on water plans. The contour interval shall not be greater than five feet.

• Plans should be on paper no larger than 24 inches x 36 inches.

• Minimum scale shall be one inch = 20 feet; maximum scale shall be one inch = 100 feet.

• Show proposed water meter sizes and locations.

• Show nearest valves on the existing main that will need to be closed to make the proposed tap (in case live tap is not used).

• The plans must have the seal of the Georgia registered professional engineer who engineered the system.

4) Sanitary sewer design.

• Show name of the sewerage basin(s) within which the proposed development is located.

• Give the proposed size, location and material of sewer lines and service lines.

• Show estimate of proposed daily sewer capacity required.

• Creek crossings require full scale details at one inch = 20 feet minimum including piers, collars and all other appurtenances. Rip rap and other erosion control devices will be required for all disturbed areas.

• Minimum sewer line depth in the roadway shall have six feet of cover.

• Maximum depth of the sewer line in the roadway is 18 vertical feet. The maximum depth of a sewer line outside of the roadway is 25 vertical feet.

• The maximum allowable distance between manholes is 400 linear feet.

• Ductile iron pipe is required for all outside drop manholes, last joint of pipe at all drop manholes greater than three feet, when clearances between sanitary sewer and storm drain crossings are two feet or less, or where depth of sewer line is greater than 14 feet or less than six feet of cover. Minimum depth of ductile iron pipe is four feet.

• Grease trap sizes will be based upon the number of seats multiplied by 15 gallons per seat. Minimum trap size is 1,500 gallons and maximum trap size is 3,000 gallons. It shall be the owner/developer's responsibility to install and maintain the trap.

• Plan and profile sheets shall be provided for all sewers (except service laterals).

Profiles shall have a horizontal scale of not more than 100 feet to the inch and a vertical scale of not more than ten feet to the inch. The plan view shall be shown on the same sheet as the profile. Plan and profile views should have line designations, station numbers, manhole numbers and any other indexing necessary to easily correlate the plan and profile views.

• Plan and profiles shall show the following:

(a) Location and names of streets, sewers and drainage easements.

(b) Line of existing and proposed ground surface, the grade of the sewer between each two adjacent manholes, invert of sewer in and out of each manhole, and surface elevation of each manhole.

(c) All manholes shall be numbered on the plan and correspondingly numbered on the profile. The station number shall be shown for each manhole.

(d) The location and elevation of adjacent parallel stream beds and of adjacent lake surfaces shall be shown on the plan and profile.

(e) Sizes, locations and inverts of all special features such as connections to existing sewers, concrete encasement, collar walls, elevated sewers, piers, special manhole covers such as vented outfall or sealed covers, etc.

(f) All structures, both above and below ground, which might interfere with the proposed construction, particularly water mains, gas mains, storm drains, utility conduits, etc.

• Special detail drawings at a scale to clearly show the nature of the design shall be furnished to show the following particulars:

(a) All stream crossings and storm drain outlets with elevations of the stream bed.

(b) Details of all special sewer joints and cross sections.

(c) Details of special sewer appurtenances such as manholes, service connections, elevated sewers, piers, pipe bedding, special highway crossings, railroad crossings, etc.

[5)] Sewer plan notes.

• "No permanent structures shall be constructed within the permanent water or sewer easement."

• "The developer shall notify the water and sewer system inspector (770-445-7466) 24 hours prior to tapping the sewer line."

• "Sewer pipe shall have gravel bedding."

• "Transition joints between sewer pipes of different materials shall be accomplished by the use of adapters. Concrete collars are not acceptable."

• "All tie-ins to existing manholes shall be cored. All manholes require "kor-n-seal" or equal rubber boots. Equal boots must be approved by the water, sewer and environmental services department prior to use."

• "No sewer lines smaller than eight inches shall be tied to a county line or manhole, excluding service laterals."

4.4.5 Transportation checklists.

1) General information.

• Provide overall site plan with building location and size, on-site parking, traffic circulation and all access locations.

• Provide Georgia DOT permit as required.

• Show distance from one corner of the property, along the right-of-way line, to the centerline of the nearest intersecting street.

• Show posted speed limit.

• Show all proposed and existing traffic control devices and striping.

• Provide the width of existing roadway pavements, lane widths and direction of travel (using directional arrows) within the lanes.

• Show the total length of frontage of the property owned and, if different, the length of the frontage being developed under the application.

• Show the distance from the edge of pavement to the center of the side ditch and the direction of the flow of water within the ditch.

• Show proposed driveway width, measured either from face of curb to face of curb, or from edge of pavement to edge of pavement.

• Show proposed acceleration/deceleration lane(s), including length of lane, length of taper and width of lane (measured from edge of existing travel lane to edge of pavement or to the face of curb).

• Provide radii for all proposed driveways.

• Provide stopping sight distance measurements at all proposed driveways.

• Provide traffic control devices and striping plan.

• Add note: "Construction equipment shall not be parked in right-of-way, and must be stored within site."

2) Typical sections.

• Include paving and base elements on typical sections. Label each layer as to the thickness or spread rate, and type of material to be used.

• Express cross slopes of roadway pavement, shoulder surfaces and sidewalks as percentages. Show outer slopes by ratio, horizontal to vertical (e.g., 4:1).

• Provide lane and shoulder widths on typical sections. Width shall comply with article 5 of these regulations. Show minimum to maximum widths.

• For projects with guardrails, show typical guardrail section with additional shoulder width required for guardrail and anchorage placement.

• Show right-of-way widths.

• Label curb and gutter or typical sections per Georgia DOT and/or county standards.

• Show sidewalk or typical sections with width and cross slope.

• Show all existing and proposed utilities.

3) Intersection details.

• Intersection detail sheets are required if additional details necessary for proper construction of items at road intersections cannot be clearly shown on the regular roadway plan sheets.

• Typical information that may be found on intersection detail sheets include edges of pavement, locations or elevations, dimensions, channelizing curbs and raised median locations, along with handicap ramps, drainage structures, traffic signal poles and utility poles.

• Indicate elevation along edges of pavement in the area of the intersection by listing the elevations at regular intervals or by using contours.

• Provide intersection grading plans where necessary to properly detail cross slope transitions and drainage requirements.

• Dimension and station all intersection details, including pavement widths, curb and median radii, radius returns, horizontal location of raised medians, center of median and/or channelization openings, lane tapers, etc.

• Show all existing and proposed traffic control devices and striping.

4.4.6 Health department checklist.

• Plans, specifications, soil data and, if required, absorption test data, shall be submitted to the health department for the purpose of obtaining a construction permit to install an on-site sewage management system, which will produce a sewage flow in excess of 2,000 gallons per day, when prepared in accordance with these rules, from any person who demonstrates to the satisfaction of the health department that they have sufficient knowledge of on-site sewage management system design.

• Soil evaluations shall be conducted by individuals meeting the requirement established in the health department's current Manual for On-Site Sewage Management Systems.

• Recommend a level two soil survey be completed.

4.4.7 Public safety checklist.

• Follow the terms of the Standard Fire Code, 1995 Amendments.

• Follow the terms of NFPA-101, 1994 Life Safety Code.

• Follow handicap requirements, ANSI A117.1-1992 and O.C.G.A. 30-3.

• Follow accessibility requirements, (ADA) 1990, fully effective July, 1994.

• Show number of stories.

• State the square footage per floor.

• Give a brief description of the work to be performed.

• Include fire protection/egress plans and match plan page index.

• Include smoke control systems, fire detection system, automatic sprinkler system and extinguishing system.

• Show stair pressurization.

• Specific requirements for occupancy chapters.

• Water pressure and fire flow test and 24-hour pressure chart.

• State fire main size.

• Show location, spacing and number of fire hydrants.

4.5.1 Final plat submittal.

1) When the developer desires final plat action, the original and 20 copies of the final plat and supporting data shall be submitted to the community development department.

2) The final plat shall conform substantially to the preliminary plat and construction plans as approved; shall submit a maintenance and/or performance bond in accordance with Article 14 of these regulations, and shall meet all requirements set forth in these regulations. The final plat shall be drawn to scale of not less than one inch equals 100 feet on a sheet or sheets not exceeding 17 inches by 22 inches.

4.5.2 General checklist.

• Show name of subdivision.

• Give name, address and phone number of person to be notified of action.

• Show graphic scale, north point and date. The north point shall be identified as magnetic, true, or grid north.

• Provide a location/vicinity map showing relationship of the subdivision to the surrounding area.

• State the total number of acres and number of lots.

• Show the layout of all lots, including front, side and rear building setback lines, scaled dimensions on lots and utility easements with width and use.

• Note the minimum lot size requirement.

• Show the proposed unit division or stage development, if any.

• Identify all land to be reserved or dedicated for public use.

• State zoning category of the property.

• Note zoning case number, date of approval, and all conditions of zoning on the plat (if applicable).

• Show and note front, side and rear setbacks on plat.

• Note minimum lot size requirement.

• State names of adjoining property owners or subdivisions, and zoning category of adjacent properties.

• Show required buffer areas (if applicable).

• If any variances were obtained for the property, note variance case number, date of approval, and type of variance (and conditions) approved.

• Provide final plan of water supply system (if applicable) with pipe sizes and location of hydrants, valves, and meter boxes.

• Provide final plan of sanitary sewers (if applicable) with grade, pipe sizes and points of discharge and minimum finished floor elevation as applicable.

• Show all street names and street addresses.

• Show name, location, right-of-way, dimension from centerline, pavement width and surface type of all streets and roads on or adjacent to the property to be subdivided.

• Show and state names, right-of-way, dimension from centerline, pavement width and surface type of all proposed roads.

• Show ten-foot "No Access Easement" along the rear of all double frontage lots.

• Show relevant curve data in the form of a curve table on the plat.

• Provide sufficient data to readily determine and reproduce on the ground the location, bearing and length of every road line, boundary line, block line and building line, whether curved or straight. This shall include the radius, central angle, and tangent distance for the centerlines of curved streets. Curved property lines shall show arc or chord distance and radii.

• Show all dimensions to the nearest one-hundredth of a foot and angles to the nearest minute.

• Show location and description of monuments.

• Provide computations showing closure of tract boundary, which closure shall be one foot in 2,500 feet or better.

• Provide final plan of storm sewer system with grade, pipe sizes, and location of outlets, access and drainage easements.

• Provide certification by a registered surveyor attesting to the accuracy of survey, plat, and placement of monuments.

• Provide certification that the land owner dedicates roads, rights-of-way and designated sites for public use.

• Provide certification by the health department that the water supply and sewage systems installed or proposed to be installed fully meet the requirements of the health department regulations or certification from the water, sewer and environmental services department if on public water or sewer.

• Provide certification by the board of commissioners or its designee that all improvements have been installed in accordance with these regulations or certification by the board of commissioners that a maintenance bond or other surety in an amount sufficient to assure that completion of all required improvements has been received.

• Protective covenants or deed restrictions, if any, shall be placed directly on the final plat or attached thereto in form for recording.

• To satisfy street light requirements for new subdivisions, the following notes must be shown on the final plat:

(a) "In accordance with the Paulding County Street Light District Ordinance (amendment 8/26/97), the developer of this subdivision must provide street lights."

(b) "The developer shall submit to the utility coordinator the street light layout prepared by the utility company that will provide the lighting service showing exact location of street lights within this subdivision."

(c) "The developer shall submit to the utility coordinator proof of payment to the utility company for installation of the street lights, including poles, fixtures and any other related items or materials necessary for installation."

(d) "The final plan shall annotate that street lights shall be installed in accordance with provisions of the street light ordinance."

(e) "The street light requirements must be met prior to obtaining any building permits or water meters for this subdivision."

4.5.3 Health department checklist.

• A high intensity level two soil survey or, if the soil conditions are complex and/or the exact positions of the inventoried soil's boundaries are critical for system placement, a level three soil survey will be needed.

• A signed/stamped copy of the final soil report with the level of the soil survey indicated on the report.

• A copy of the soil narrative explaining the types of soils.

• Five copies of the soil report overlayed onto the final plat.

• Five copies of the signed final plat.

• Subdivision review fee must be paid.

4.5.4 Construction of phased developments. Developers shall be responsible for damages and maintenance of previously accepted streets. When construction traffic of new phases/ developments impact severely on existing county streets, the developer's maintenance bond may be used for these off site repairs and maintenance, should the developer fail to take necessary corrective actions.

4.5.5 Status of platted streets/other public spaces and utilities. After final approval by the Paulding County Development Control Committee and the completion of all improvements required by these regulations and the expiration of the required maintenance bond period, the subdivider may request the county to accept platted streets and other public spaces and utilities.

4.5.6 Certifications on final plat.

• Owner's acknowledgment.

I hereby certify as the owner of the land shown on this plat and whose name is subscribed hereto, acknowledge that this plat was made from an actual survey, and for value received the sufficiency of which is hereby acknowledged, do hereby convey all streets and rights-of-way, water mains and sewer lines shown hereon in fee simple to Paulding County and further dedicate to the use of the public forever all alleys, parks, water courses, drains, easements and public places hereon shown for the purposes and considerations herein expressed. In consideration of the approval of this development plan and other valuable considerations, the owner further releases and holds harmless Paulding County from any and all claims, damages or demands arising: on account of the design, construction and maintenance of the property shown hereon; on account of the roads, fills, embankments, ditches, cross drains, culverts, water mains, sewer lines, and bridges within the proposed rights-of-way and easements shown; and on account of backwater, the collection and discharge of surface water, or the changing of courses of streams. And further the owner warrants that he owns fee simple title to the property shown hereon and agrees that Paulding County shall not be liable to him, his heirs, successors or assigns for any claims or damages resulting from the construction or maintenance of cross drain extensions, drives, structures, street, culverts, curbs of sidewalks, the changing of courses of streams and rivers, flooding from natural creeks and rivers, surface waters and any other matter whatsoever. I further warrant that I have the right to sell and convey the land according to this plat and do hereby bind myself and owners subsequent in title to defend by virtue of these presents.

________________________________________________________________________________ Signature Date

• Surveyor's acknowledgement I hereby certify that the plan shown and described hereon is a true and correct survey made on the ground under my supervision, that the monuments have been placed as shown hereon, and is to the accuracy and specifications required by the Paulding County Development Standards.

________________________________________________________________________________ Signature Date

• Certificate of individual sewage disposal systems This subdivision is approved for development utilizing on-site sewage management systems. Issuance of permits will depend on the physical merits of each lot to have an approved installation as based on the rules and regulations and the judgment of the Paulding County Health Department. General approval of this plat does not constitute an approval of any individual lot.

________________________________________________________________________________ Signature Date

• Paulding County Development Certification This plat, having been submitted to Paulding County and having been found to comply with the Paulding County Development Regulations and the Paulding County Zoning Ordinance, is approved subject to the installation and dedication of all streets, utilities, easements and other improvements in accordance with the Standard Details, approved construction drawings, and the posting of an 18-month maintenance bond.

_____________ Date _________________________________________________________________ Community Development Department _____________ Date _________________________________________________________________ Water, Sewer and Environmental Services _____________ Date _________________________________________________________________ Department of Transportation _____________ Date _________________________________________________________________ Paulding County Board of Commissioners

4.5.7 Final plat revisions. Should a developer/subdivider need to amend or revise a previously approved final plat, the developer/subdivider shall submit to the community development department the following:

1) A letter specifically identifying the modifications/revisions to the final plat and stating that all necessary infrastructure (storm, sanitary sewer and water) has been adjusted in accordance with Paulding County Code to address the modifications.

2) Submission of the latest recorded original final plat with a specific statement regarding the nature of the revision on the face thereof. The format for such a revision statement shall be as follows:

"This plat supersedes the plat recorded in Plat Book , Page .

The purpose of this revision is to: ______________________________________________."

3) If the original final plat is otherwise unavailable, then the developer/subdivider may submit a plat prepared to show the specific revision to the original plat of record with the revisions noted thereon with references to the previously recorded plat (latest revision).

Approved By: _______________________________________ Community Development Director (Res. No. 10-18, §§ 1, 2, 8-10-2010)

ARTICLE 4.15 C-O, CORRIDOR OVERLAY DISTRICT

4.15.1 Purpose, intent, and authority.

1) Statement of purpose. It is the purpose of this district to establish standards for the design of sites, buildings, structures, plantings, signs, street hardware and such other improvements that are visible to the public and affect the physical development of land within certain designated transportation corridors.

The following standards shall be considered in evaluating projects proposed within the corridor overlay district.

(a) All structures will be evaluated on the overall appearance of the project and shall be based on the quality of its design and its relationship to the surrounding area.

(b) The quality of design goes beyond the materials of construction to include scale, mass, color, proportion, and compatibility with adjoining developments.

(c) Colors shall be harmonious and only the use of compatible accents shall be permitted.

(d) Building components, such as windows, doors, eaves, and parapets, shall have good proportions and relationships to one another.

(e) Any design in which the structure frame is exposed to view, the structural materials shall be compatible within themselves and harmonious with their surroundings.

(f) Monotony of design in single or multiple building projects shall be avoided. Variation of detail, form, and siting shall be used to provide visual interest. In multiple building projects, variable siting or individual buildings may be used to prevent a monotonous appearance.

2) Statement of intent. These standards are intended to promote high quality creative development that will combine imagination, innovation and variety in the appearance of buildings and sites in the overlay zone. These standards are further intended to preserve and enhance property values and to promote the public health, safety and welfare by providing for consistent, and coordinated treatment of the property encompassed by the selected transportation corridors.

Originally, a public meeting was held on March 18, 2004 in an effort to seek citizen preference regarding current growth and development patterns in Paulding County. An additional public hearing was held for this amendment on January 24, 2006. Public information was obtained in 2004 through a Visual Preference Survey (VPS). The survey allowed citizens an opportunity to state whether they liked a photo of a development or disliked it based on design standards. Those citizens that provided input through the VPS expressed an interest in promoting developments that will allow Paulding County to grow in positive, sustainable patterns. These standards include regulatory control and design of building development and materials, parking areas, signage, transportation (pedestrian and vehicular), greenspace and trees/vegetation.

3) Authority. Authority underlying creation of the corridor overlay zones district is provided for in O.C.G.A. Section 36-66-2, Section 11 of the Paulding County Enabling Legislation and the Paulding County Code of Ordinances, 2003 Zoning Ordinance, Article XV.

4) Statement of significance.

(a) State Route 120 (Marietta Highway) traverses the county from the east to the southwest providing access to Cobb County and Haralson County. State Route 120 (Marietta Highway) is a divided, four-lane with median from the Cobb County line to its intersection and convergence with U.S. Highway 278. For initial purposes, only the portion of Marietta Highway from the Cobb County line to the intersection with Highway 278 was included in the Corridor Overlay Zone.

Marietta Highway is considered by the Paulding County Comprehensive Plan and associated Future Land Use Map to be one of the county's primary commercial corridors. Future development of this highly visible corridor will dramatically change the image of Paulding County. With this amendment, the remaining portion of State Route 120, traversing to the west from U.S. 278 through to the Haralson County line shall be included as a transportation corridor in order to create continuity with the other portions of State Route 120.

(b) Bill Carruth Parkway f/k/a West Hiram Parkway is located in the east-central portion of the county, west of the City of Hiram. The parkway begins at the intersection of Marietta Highway with U.S. Highway 278 and extends southward until it intersects with State Route 92 (Hiram-Douglasville Highway), South of Hiram. The highway serves as both connector and bypass route. Bill Carruth Parkway is expected to have significant development over the next five years.

This development will change the suburban character of the corridor into a more intense urban environment. The impact of new development upon this corridor will create a setting that commands the highest standards of development which encourage efficient use of land, promote coordinated development, permit innovative site designs, establish development standards and preserve the integrity of the roadways within this corridor.

(c) In addition thereto, State Route 92 and State Route 61 traverse the county from Douglasville to Acworth and Villa Rica to Cartersville, respectively. Both state routes are heavily traveled and are the sites of varied new developments. The introduction of the corridor overlay district will encourage the development in this area to project a uniform, high-quality appearance.

(d) U.S. Highway 278 is the most heavily traveled roadway in Paulding County, and is one of only two four-lane highways in the county. It traverses the county from Powder Springs in Cobb County to Rockmart in Polk County. U.S. 278 travels through the county's current commercial center, Hiram. As U.S. 278 is considered by the Paulding County Comprehensive Plan and associated future land use map to be one of the county's primary commercial corridors, future development of this highly visible corridor will dramatically change the image of Paulding County.

(e) The East Hiram Parkway is a proposed highway corridor which will begin at the terminus of the Bill Carruth Parkway and continue through the eastern portion of Paulding County. The highway serves as both connector and bypass route. East Hiram Parkway is expected to have significant development over the next five years. This development will change the suburban character of the corridor into a more intense urban environment. The impact of new development upon this corridor will create a setting that commands the highest standards of development which encourage efficient use of land, promote coordinated development, permit innovative site designs, establish development standards and preserve the integrity of the roadways within this corridor.

(f) In addition thereto, all state routes in the county are designated as commercial areas in the future land use map and comprehensive plan. Paulding County does not have interstate access and therefore, the state routes remain the only other viable commercial corridors. Thus, it is important that these areas develop in a consistent manner to ensure the highest standards of development which encourage efficient use of land, promote coordinated development, permit innovative site designs, establish development standards and preserve the integrity of the roadways within this corridor.

(g) In recent years, Ridge Road has emerged as a mixed use corridor in the new Georgia area with commercial and residential developments throughout the length of the thruway. Ridge Road extends from State Route 92 to State Route 61.

As Ridge Road continues to develop, it will be important to ensure continuity with design, quality, workmanship and materials in order to complete a visually pleasing development area.

(h) Finally, the airport access road will serve as the gateway to the newly constructed Paulding County General Aviation Airport.

(i) Based upon the data set forth above, the transportation corridors subject to these provisions are as follows:

1. State Route 101 and State Route 113

2. State Route 120 a/k/a Buchanan Highway

3. State Route 120 a/k/a Marietta Highway

4. State Route 120 connector a/k/a Scoggins Road and Hiram Sudie Road

5. U.S. Highway 278

6. State Route 61 a/k/a Cartersville Highway and Villa Rica Highway

7. State Route 92 a/k/a Hiram-Acworth Highway, Hiram-Douglasville Highway and Dallas-Acworth Highway

8. East Hiram Parkway

9. Bill Carruth Parkway (West Hiram Parkway)

10. Business route SR 6 a/k/a Atlanta Highway

11. Macland Road, including State Route 360

12. Dallas-Acworth Highway f/k/a/ State Route 381

13. Ridge Road

14. Access road to the Paulding County General Aviation Airport to be located off U.S. 278

5) Title. This portion of the zoning ordinance shall be known as the corridor overlay district of the County of Paulding.

4.15.2 Boundaries.

1) General provisions. The boundaries of the roadways set forth are located on either side of the centerline of the roadway and incorporate any parcel of land with right-of-way frontage on or that is visible from the highway corridor.

2) Roadways named. The transportation corridors subject to these provisions are as follows:

1. State Route 101 and State Route 113

2. State Route 120 a/k/a Buchanan Highway

3. State route 120 a/k/a Marietta Highway a/k/a Charles Hardy Parkway

4. State Route 120 connector a/k/a Scoggins Road and Hiram Sudie Road

5. U.S. Highway 278

6. State Route 61 a/k/a Cartersville Highway and Villa Rica Highway

7. State Route 92 a/k/a Hiram-Acworth Highway, Hiram-Douglasville Highway and Dallas-Acworth Highway

8. East Hiram Parkway

9. Bill Carruth Parkway (West Hiram Parkway)

10. Business Route SR 6 a/k/a Atlanta Highway

11. Macland Road, including State Route 360

12. Dallas-Acworth Highway f/k/a State Route 381

13. Ridge Road

14. Access road to the Paulding County General Aviation Airport to be located off U.S. 278 For the purposes of this ordinance, these roadways and areas shall be collectively set forth as the "transportation corridors".

4.15.3 Community development department approval.

Approval by the community development department shall be required for any proposed or revised development plan or structure or structural alteration in the corridor overlay district.

Community development department approval of the architectural design, landscaping, sewerage, drainage, parking, signage, lighting and access to the property shall be necessary prior to: (1) the establishment of any use of the land; (2) the issuance of any improvement location permit; (3) the erection, construction or structural alteration of any building(s) in the transportation corridors as part of the corridor overlay district; or (4) modification or revision of any site development plan. (Access to the property and sewerage service shall also require approval from the appropriate department or agency including the Paulding County Department of Transportation, Paulding County Water and Sewer System Department, the Georgia Department of Transportation), and the Georgia Department of Environmental Health.

The community development department, in reviewing applications, shall examine factors concerning the site, site plan, and the surrounding area, which include but are not limited to the following items:

1. Topography;

2. Zoning on site;

3. Surrounding zoning and existing land use;

4. Streets, curbs, gutters, and sidewalks;

5. Access to public streets;

6. Driveway and curb cut locations in relation to other sites;

7. General vehicular and pedestrian traffic;

8. Internal site circulation including connectivity with adjoining parcels and developments;

9. Special and general easements for public or private use;

10. On-site and off-site surface and subsurface storm and water drainage;

11. On-site and off-site utilities;

12. The means and impact of sanitary sewage disposal and water supply technique;

13. Dedication of Paulding County approved streets and right-of-way;

14. Protective restrictions or covenants and/or recorded commitments;

15. Outdoor storage areas;

16. Provisions for adequate and acceptable setbacks, lighting, signage, screening, landscaping, and compatibility with existing platted residential use; and

17. Effects the proposed project may have on the entire corridor overlay district.

In addition thereto, the community development department, at its discretion, may request and require architectural drawings which are to be stamped/certified by a professional architect and/or specific engineering plans, stamped by a professional engineer, for any and all buildings, outparcels or other such aspects of the site as the department may deem necessary for its review of the application and development plans and proposal.

4.15.4 Building design standards.

1) Architectural design requirements/nonresidential.

(a) Exterior metal walls shall be prohibited on all buildings erected, constructed, altered, repaired or used in this overlay zone, which abut, are adjacent to or are visible to the transportation corridors.

(b) Building facades may be constructed from masonry or glass, as defined below, or other materials or products which provide the same desired stability and quality. Products other than those listed below must be approved by the community development department. (Please note: the building facades also includes all building sides which are visible from a highway corridor).

1. Masonry construction: which shall include all masonry construction that is composed of solid, faced, or veneered-wall construction with standard brick size (excluding masonry boards and cinder blocks, unless otherwise approved by the community development department.

i). Stone material used for masonry construction may consist of granite, sandstone, slate, limestone, marble, or other hard or durable all weather stone. Ashlar, cut stone, and dimensioned stone construction techniques are acceptable.

ii). Brick material used for masonry construction shall be composed of hard fired (kiln-fired) all weather standard size brick or other all weather facing brick.

2. Glass walls: which shall include glass curtain walls or glass block construction.

Glass curtain wall shall be defined as an exterior wall which carries no floor or roof loads, and which may consist of a combination of metal, glass and other surfacing materials supported in a metal framework.

3. Wood construction.

(c) The materials and finishes of exposed roofs shall compliment those used for the exterior walls. Exposed roofs shall be defined as that portion of a roof visible from ground level of the corridor or any adjacent public thoroughfare or residentially zoned or used area.

(d) Roof mounted equipment on exposed roofs shall be screened from view. The appearance of roof screens shall be coordinated with the building to maintain a unified appearance.

(e) All building mechanical and electrical equipment located adjacent to the building and visible from a public thoroughfare or a residentially zoned or used area shall be screened from view. Such screens and enclosures shall be treated as an integral element of the building's appearance.

(f) The exposed walls and roofs of buildings shall be maintained in a clean, orderly, and attractive condition; free of cracks, dents, punctures, breakage, and other forms of visible marring. Materials that become excessively faded, chalked or otherwise deteriorated shall be refinished, repainted or replaced.

(g) Refuse and waste removal areas, loading berths, service yards, storage yards, and exterior work areas shall be screened from view from public ways.

2) Relationship of buildings to site.

(a) The site shall be planned to accomplish a desirable transition with the streetscape and provide for adequate planting, safe pedestrian movement, and parking area.

(b) Site planning in which setbacks and yards are in excess zoning restrictions is encouraged to provide an interesting relationship between buildings.

(c) Parking areas shall be treated with decorative elements, buildings wall extensions, plantings, berms, or other innovative means so as to attractively landscape and/or screen parking areas from view from public ways.

(d) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing (or anticipated) adjoining buildings.

(e) Newly installed utility services, and service revisions necessitated by exterior alterations, shall be underground.

3) Minimum building height.

(a) All transportation corridors: All uses shall have a minimum building height of 14 feet with a minimum of 12 feet to the lowest eaves for a building with a gable, hip, or gambrel roof.

4.15.5 Signage standards.

1) Residential subdivisions and multi-family complexes: These residential uses shall be permitted on freestanding sign (ground mounted) per main entrance, not to exceed two signs per development. Signs shall be monument in construction and limited to a maximum of 100 square feet per sign. Maximum sign height should not exceed 15 feet.

2) Commercial and industrial uses: Each parcel shall be permitted one freestanding sign, provided all other standards are met. In addition, each structure shall be permitted one on-structure sign. For the purposes of this section, a shopping center or similar use shall be permitted one main freestanding sign; no freestanding signs shall be permitted for individual establishments in shopping centers or similar uses. Signs shall be monument in construction and limited to a maximum of 100 square feet. Maximum sign height should not exceed 25 feet.

Out-parcels located within an overall shopping center complex are allowed one monument sign not to exceed 50 square feet with a maximum height not to exceed 15 feet.

3) Location: Signs shall be located ten feet off a street right-of-way and not obstruct sight distances nor shall signs impede pedestrian access.

4) On-structure signs (wall signs) shall not project above the eaves line for buildings with pitched roofs, not above the roofline for buildings with flat roofs. In addition, the top of the wall sign shall be placed no higher than 20 feet above the ground nor extend from the wall more than 12 inches.

5) Construction: Freestanding signs shall be ground mounted, monument type structures constructed of the same material as the principle building designed to complement the principle building architecture. Signs shall not have reflective backgrounds or reflective lettering. Digital or electronic controlled message components shall comprise no more than 50 percent of sign area. Scrolling text shall be permitted including date, time, and temperature.

No message shall be displayed for an interval of less than ten seconds. Signs may be illuminated internally or by an externally located stationary light source, shielded and directed solely at the sign (one source per sign face). Colored lamps are not permitted.

6) Landscaping: Landscaping shall be integrated with installation of freestanding signs, provided sight distances and pedestrian access can be maintained.

7) Other sign requirements: No permanent banners, streamers or inflated devices are allowed. Temporary banners and/or inflated devices are allowed for a maximum of 30 days upon receiving written approval from the community development department.

4.15.6 Landscaping plan.

1) A landscaping plan shall be submitted to the community development department for their approval at the same time other plans (i.e. architectural design, lighting, parking, signage, and site plans) are submitted to Paulding County plan review. This plan shall be drawn to scale, including dimensions and distance, shall delineate all existing and proposed structures, private parking areas, walks, ramps for handicapped, terraces, driveways, signs, lighting standards, steps and other similar structures; and shall delineate the location, size, and description of all landscape materials. Landscape treatment for plazas, roads, paths, service and private parking areas shall be designed as an integral and coordinated part of the landscape plan for the entire lot. Additional information may be requested by the community development department for the filing of landscaping plans.

2) Areas to be landscaped:

(a) Greenbelt.

(Non-residential). The greenbelt (located on the front-side of buildings) shall be suitably landscaped and shall be otherwise unoccupied except for steps, walks, terraces, driveways, lighting standards, and other similar structures, but excluding private parking areas. The greenbelt shall be a minimum of ten feet wide. Mounding and other innovative treatments are to be especially encouraged in this area.

(Residential). The greenbelt shall include a 20-foot landscaped strip along the site's frontage along the corridor and other public roads excluding curb-cut right(s)-of-way.

Landscaping shall include evergreen trees, other acceptable vegetative material, berms, or a combination thereof.

(b) Peripheral planting. There shall be peripheral landscaping strip, four feet in depth, located along the side of any private parking area which abuts any front, side or rear property line.

(c) Planting within parking lots. All parking lot landscaping shall be a quality to improve and enhance the site and its surrounding area. Effective use of mounding and existing topography is encouraged. Landscaping and planting areas shall be reasonably dispersed throughout the parking area, and not less than five percent of a private parking lot shall be landscaped. (For purposes of this computation, landscaping in: (1) the greenbelt; (adjacent to buildings); and (2) on the periphery of the lot shall not be included.) Landscaping shall be specifically provided at the ends of parking rows and as a means of separating parking from major circulation isles within lots.

3) Landscaping standards.

(a) The interior dimensions, specifications and design of any planting area or planting medium proposed to be constructed shall be sufficient to protect the landscaping materials planted therein and to provide for proper growth.

(b) Primary landscaping materials used in the greenbelt and adjacent to buildings shall consist of one or a combination of the following: shade trees, ornamental trees, shrubs, ground covers, grass, mulches, etc.

(c) The primary landscaping materials used in and around private parking areas shall be trees, which provide shade at maturity. Shrubbery, hedges, and other planting material may be used to compliment tree landscaping, but shall not be the sole contribution to the landscaping.

(d) All shade trees proposed to be used in accordance with any landscaping plan shall be a minimum of eight feet in overall height and have a minimum trunk diameter, 12 inches above the ground of two inches upon planting. They should be of a variety which will attain an average mature spread greater than 20 feet. The types of trees shall be those specified in the buffer sections of the zoning ordinance—Article VI, section E, (4) Standards, (l).

(e) Landscaping materials selected should be appropriate to local growing and climatic conditions. Wherever appropriate existing trees should be conserved and integrated into the landscaping plan. Plant material shall be selected for interest in its structure, texture, color and for its ultimate growth. Indigenous and other hardy plants that are harmonious to the design, and of good appearance shall be used.

(f) The landscaping plan shall ensure that sight distances are not obstructed for drivers of motor vehicles.

(g) Where natural or existing topography patterns contribute to beauty and utility of a development, they shall be preserved and developed. Modification to topography shall be permitted where it contributes to good appearance.

(h) Grades of walks, parking spaces, terraces, and other paved areas shall provide an inviting and stable appearance for walking and, if seating is provided, for sitting.

(i) Landscape treatment shall be provided to enhance architectural features, strengthening vistas and important axis, and provide shade. Spectacular effects shall be reserved for special locations only.

(j) Unity of designs shall be achieved by repetition of certain plant varieties and other materials and by correlation with adjacent developments.

(k) In locations where plants will be susceptible to injury by pedestrians or motor traffic, they shall be protected by appropriate curbs, tree guards, or other devices.

(l) Where building sites limit planting, the placement of trees in parkways or paved areas is encouraged.

(m) Screening of service yards and other places that tend to be unsightly shall be accomplished by use of walls, fencing, planting, or combinations of these. Screening shall be equally effective in winter and summer.

(n) In areas where general planting will not prosper, other materials such as fences, walls, and pavings of wood, brick, stone, gravel, and cobbles shall be used. Carefully selected plants shall be combined with such materials where possible.

(o) Miscellaneous structures and street hardware shall be designed to be part of the architectural concept of design and landscape. Materials shall be compatible with buildings, scale shall be good, colors shall be in harmony with buildings and surroundings, and proportions shall be attractive.

(p) Lighting in connection with miscellaneous structures and street hardware shall meet the criteria applicable to site, landscape, buildings and signs.

4) Landscaping installation and maintenance.

(a) Installation. All landscaping required by the approved landscaping plan shall be installed prior to the issuance of a building certificate of occupancy permit if said permit is issued during a planting season, or within six months of the date an occupancy permit is issued during a nonplanting season. If not planted, a bond shall be required for plantings for a period of one year (12-months) from date of certificate of occupancy.

(b) Maintenance. It shall be the responsibility of the owners and their agencies to insure proper maintenance of the landscaping, in accordance with the standards set by this ordinance and as indicated on the landscaping plan, which has been approved by the community development department. This is to include, but not limited to, replaced dead plantings with identical varieties or a suitable substitute, and keeping the area free of refuse and debris.

(c) Changes after approval. No landscaping which has been approved by the community development department may later be altered, eliminated, or sacrificed, without first obtaining further approval from the community development department.

(d) Inspection. The community development department shall have the authority to visit any lot within the corridor overlay zone to inspect the landscaping and check it against the approved plan on file.

4.15.7 Sidewalk requirements.

The installation of sidewalks and crosswalks in all developments, residential and commercial, shall be required for developments subject to this ordinance. The sidewalks shall be constructed of concrete and shall be subject to review and approval by the community development staff as to size, location, design and materials during the plan review process.

4.15.8 Parking requirements.

Efforts to break up large expanse of pavement are to be encouraged by the interspersing of appropriate planting areas wherever possible. The number of parking spaces required is established in article VII of this zoning ordinance, depending upon the zoning and the intended land use. Alternatives to the established parking requirements may be granted to develop ments which have a mixture of uses whose peak parking requirements do not coincide in time and thereby may share parking spaces. The applicant shall provide expertly prepared justification for seeking such exception (i.e., a reference such as "shared parking," Urban land institute). There shall be an appropriate number of parking spaces, accessible to the building(s) and identification as reserved for use by handicapped individuals, and these spaces shall be of sufficient width to accommodate their needs. All parking standards shall comply with article vii of this zoning ordinance.

4.15.9 Lighting requirements.

In reviewing the lighting plan for a lot proposed to be developed in the corridor overlay district, factors to be considered by the community development shall include but are not limited to:

1) Safety provided by the lighting;

2) Security provided by the lighting;

3) Possible light spillage or glare onto adjoining properties or streets. (Down-shielding is encouraged and spillage or glare onto adjoining properties is prohibited);

4) Attractiveness of the lighting standards and their compatibility with the overall treatment of the property;

5) Height and placement of lighting standards considering the use (maximum height of 30 feet); and.

6) Exterior lighting, when used, shall enhance the building and the adjoining landscape.

Lighting standards and building fixtures shall be of a design and size compatible with the building and adjacent areas. Lighting shall be restrained in design and excessive brightness avoided.

4.15.10 Access to individual sites.

The transportation corridors by their functional nature as primary thoroughfares, must have reasonable restrictions as to the number and location of access points within the overlay zones.

All roadways listed as transportation corridors represent major thoroughfares, which must be controlled as to the number of access points (curb cuts) permitted.

Therefore, in order to provide safe and sufficient traffic movement to and from adjacent lands and to protect the functional integrity of the corridors primary thoroughfares, in many cases frontage roads, access roads, and distributors roads, will have to be built. Such roads shall be coordinated with those of continuous lots and designed to preserve the aesthetic benefits provided by the greenbelt areas. Access at the side or rear of buildings is encouraged.

New access points onto the primary thoroughfares in the corridor shall be coordinated with existing access points whenever possible. The following curb cut policy shall apply throughout all corridors:

Access to proposed developments shall be provided per Georgia Department of Transportation and/or Paulding County Department of Transportation access management standards, policies, guidelines and regulations.

4.15.11 Access to potential development sites.

Stub streets shall be built in all cases where adjacent lots have reasonable potential for development. Reasonable potential shall include any adjacent parcel of adequate size for commercial or residential development or any adjacent parcel so determined by the community development department in association with the Paulding County Department of Transportation.

4.15.12 Other standards.

1) Outside storage prohibited. (Seasonal sales). No outside, unenclosed storage of refuse (whether or not in containers) or display of merchandise shall be permitted on any lot. All refuse shall be contained completely within the principle or accessory building(s). Exceptions to this requirement will be made on a case-by-case basis by the board of zoning appeals using the variance procedure outlined in article XV. Seasonal sales are allowed four times a year with written approval from the director of community development for a maximum of 30-days.

Outdoor sales (if allowed by the underlying zoning district) must be covered. Examples of coverings include but are not limited to tents and awnings.

2) Loading berth requirements. Loading berth requirements shall be as specified in the underlying zone district(s), except that any loading or unloading berth or bay shall be screened from view beyond the site by landscaping or other screening.

3) Accessory buildings and uses. All accessory buildings and uses which are permitted in the underlying zoning district(s) shall be permitted within the corridor overlay district, except that any detached accessory building on any lot shall be designed to be architecturally designed and constructed with the same material as the principle building as to be compatible with the principle building which it is associated. All accessory buildings shall have a roof.

4) Paving requirements. All parking areas shall be finished with a hard surface such as asphalt, concrete or other materials approved by the community development department.

5) All utilities including but not limited to electric, cable, and phone services shall be underground unless otherwise approved by the community development department after written submittal providing justification for overhead utility services.

6) Temporary or seasonal sales. Temporary or seasonal sales are allowed along the highway corridor on a case-by-case basis for a maximum of four times per year with written approval from the director of community development for a maximum of 30 days. Request for temporary or seasonal sales shall be made in writing accompanied by a recorded plat of the site and written permission from the property owners to the director of community development. A Paulding County Business License is required of all approved temporary or seasonal sales.

ARTICLE 5 ROADWAY DESIGN AND CONSTRUCTION REQUIREMENTS

5.1 Access.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:paulding-county/zoning/whole@2025-12-09-60849194ef

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.