Paulding County · Ordenanza de zonificación
Paulding County Zoning Ordinance
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2025-12-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 8 de 9. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
(2) Nonresidential buildings. For new construction and substantial improvement of any principal nonresidential building, the elevation of the lowest floor, including basement and access to the building, shall be at least one foot above the level of the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of section 10.5.1(5)(a). Nonresidential buildings may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, or at least as high as the future-conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the Paulding County Community Development Director using the FEMA floodproofing certificate along with the design and operation/maintenance plan.
10.5.4 Building standards for residential single-lot developments on streams without established base flood elevations and floodway (A-zones). For a residential single-lot development not part of a subdivision that has areas of special flood hazard, where streams exist but no base flood data have been provided (A-zones), the Paulding County Community Development Director or the Director's designee shall review and reasonably utilize any available scientific or historic flood elevation data, base flood elevation and floodway data, or future-conditions flood elevation data available from a federal, state, local or other source, in order to administer the provisions and standards of this ordinance.
If data are not available from any of these sources, the following provisions shall apply:
(1) No encroachments, including structures or fill material, shall be located within an area equal to twice the width of the stream or 50 feet from the top of the bank of the stream, whichever is greater.
(2) In special flood hazard areas without base flood or future-conditions flood elevation data, new construction and substantial improvements shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces shall be provided for flood prone enclosures in accordance with section 10.5.1(5)(a).
10.5.5 Building standards for areas of shallow flooding (AO-zones). Areas of special flood hazard may include designated AO shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. In these areas the following provisions apply:
(1) All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to no lower than one foot above the flood depth number in feet specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces shall be provided in accordance with standards of section 10.5.1(5)(a);
(2) New construction and substantial improvement of a nonresidential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus one foot above the highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice, and shall provide such certification to the Paulding County Community Development Director or the Director's designee using the FEMA floodproofing certificate along with the design and operation/maintenance plan; and
(3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.
10.5.6 Standards for subdivisions of land.
(1) All subdivision proposals shall identify the areas of special flood hazard and areas of future-conditions flood hazard therein and provide base flood elevation data and future-conditions flood elevation data;
(2) All residential lots in a subdivision proposal shall have sufficient buildable area outside of the future-conditions floodplain such that encroachments into the future-conditions floodplain for residential structures will not be required;
(3) All subdivision plans will provide the elevations of proposed structures in accordance with section 10.3.2.
(Ord. No. 19-02, § 2 (Exh. A), 5-30-2019) Section 10.6. Variance procedures.
The following variance and appeals procedures shall apply to an applicant who has been denied a permit for a development activity or to an owner or developer who has not applied for a permit because it is clear that the proposed development activity would be inconsistent with the provisions of this ordinance. A request for a variance may be submitted by an applicant who has been denied a permit by the Paulding County Community Development Department or by an owner or developer who has not previously applied for a permit for the reasons stated herein above.
(1) Any person aggrieved by a decision or order of the Paulding County Community Development Department, may appeal in writing within 30 days after the issuance of such decision or order to the Paulding County Development Waiver Review Committee in accordance with the Administration article of the development regulations. The party appealing such decision shall be entitled to a hearing before the Paulding County Development Waiver Review Committee, as set forth in the administration article of the development regulations, within 30 days of receipt of the written appeal or at the next regularly scheduled meeting of the development waiver review committee.
(2) Any person aggrieved by the decision of the Paulding County Development Waiver Review Committee may appeal such decision to the Paulding County Board of Commissioners, as provided in O.C.G.A. § 5-4-1.
(3) Any person aggrieved by the decision of the Paulding County Board of Commissioners may appeal such decision to a court of competent jurisdiction, as provided in
O.C.G.A. § 5-4-1.
(4) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure, and the variance issued shall be the minimum necessary to preserve the historic character and design of the structure.
(5) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this section are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.
(6) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
(7) In reviewing such requests, the Paulding County Development Waiver Review Committee and Paulding County Board of Commissioners shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this ordinance.
(8) Conditions for variances:
(a) A variance shall be issued only when there is:
(i) A finding of good and sufficient cause;
(ii) A determination that failure to grant the variance would result in exceptional hardship; and
(iii) A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, or the creation of a nuisance.
(b) The provisions of this ordinance are minimum standards for flood loss reduction; therefore, any deviation from the standards must be weighed carefully. Variances shall only be issued upon determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.
(c) Any person to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance resulting from the lowest floor elevation being placed below the base flood elevation will be commensurate with the increased risk to life and property, and that such costs may be as high as $25.00 for each $100.00 of insurance coverage provided.
(d) The Paulding County Community Development Director or the director's designee shall maintain the records of all variance actions, both granted and denied, and report them to the Georgia Department of Natural Resources and the Federal Emergency Management Agency upon request.
(9) Any person requesting a variance shall, from the time of the request until the time the request is acted upon, submit such information and documentation as the Paulding County Community Development Director and Paulding County Development Waiver Review Committee shall deem necessary to the consideration of the request.
(10) Upon consideration of the factors listed above and the purposes of this ordinance, the Paulding County Community Development Director and the Paulding County Development Waiver Review Committee may attach such conditions to the granting of variances as they deem necessary or appropriate, consistent with the purposes of this ordinance.
(11) Variances shall not be issued after the fact.
(Ord. No. 19-02, § 2 (Exh. A), 5-30-2019) Section 10.7. Violations, enforcement and penalties.
Any action or inaction which violates the provisions of this ordinance or the requirements of an approved stormwater management plan or permit, may be subject to the enforcement actions outlined in this section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.
10.7.1 Notice of violation. If the Paulding County Community Development Director or the director's designee determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved stormwater management plan or the provisions of this ordinance, it shall issue a written notice of violation to such applicant or other responsible person. Where a person is engaged in activity covered by this ordinance without having first secured a permit therefore, the notice of violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site.
The notice of violation shall contain:
(1) The name and address of the owner or the applicant or the responsible person;
(2) The address or other description of the site upon which the violation is occurring;
(3) A statement specifying the nature of the violation;
(4) A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the stormwater management plan or this ordinance and the date for the completion of such remedial action;
(5) A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed; and
(6) A statement that the determination of violation may be appealed to the Paulding County Community Development Director by filing a written notice of appeal within 30 days after the notice of violation.
10.7.2 Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, the Paulding County Community Development Director shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable opportunity, of not less than ten days (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) to cure such violation. In the event the applicant or other responsible person fails to cure such violation after such notice and cure period, the Paulding County Community Development Director may take any one or more of the following actions or impose any one or more of the following penalties.
(1) Stop work order. The Paulding County Community Development Director may issue a stop work order which shall be served on the applicant or other responsible person.
The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take the necessary remedial measures to cure such violation or violations.
(2) Withhold certificate of occupancy. The Paulding County Community Development Director may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein.
(3) Suspension, revocation or modification of permit. The Paulding County Community Development Director may suspend, revoke or modify the permit authorizing the development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated (upon such conditions as the Paulding County Community Development Director may deem necessary) to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations.
(4) Civil penalties. In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as the Paulding County Community Development Director shall deem appropriate (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) after the Paulding County Community Development Director has taken one or more of the actions described above, Paulding County may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation.
(5) Criminal penalties. For intentional and flagrant violations of this ordinance, Paulding County may issue a citation to the applicant or other responsible person, requiring such person to appear in appropriate magistrate court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
(Ord. No. 19-02, § 2 (Exh. A), 5-30-2019)
ARTICLE 11 REUSE WATER MAINS AND ACCESSORIES
11.1 General.
11.1.1 Scope.
1) The contractor or developer shall furnish all equipment, labor, and materials (unless otherwise agreed upon in writing) necessary to construct reuse water mains and perform all work specified or indicated on the standard details. The work shall include all necessary concrete work, diking, pumping, bailing, draining, flushing, soil erosion and sedimentation control, and testing. These specifications cover reuse water mains and service connections complete. The reuse water mains shall be installed in the locations indicated on the standard details or as otherwise directed by the water and sewer system department (hereafter referred to in this article as "the department.").
2) The contractor shall arrange his work so as to minimize interference with pedestrian and vehicular traffic, and to avoid interruption of service of any existing utilities.
The contractor shall furnish and maintain suitable bridges, footways, or other means of access to or across intercepted streets, alleys, driveways and walkways, where necessary.
3) Contractor shall perform all work in accordance with the latest revision of "Design Guidelines for Water Reclamation and Urban Water Reuse" of Georgia Department of Natural Resources, Environmental Protection Division.
4) The contractor shall be responsible for removing all water from excavations and trenches whether from surface or ground sources.
5) The contractor shall guarantee all material and workmanship for a period of 18 months from the date of final acceptance of the work. If during this period any material or workmanship, etc., proves defective, the contractor shall repair same at his own cost and expense and to the satisfaction of the department.
6) In addition to the responsibility of the contractor for remedying observed defects in his work during the guarantee period, the contractor shall also reimburse the department for all expenses incurred in investigations to assure the department that the completed work is in accordance with these specifications.
11.1.2 Reuse water system flow demand.
1) The developer shall provide hydraulic analysis of the reuse water system performed by a professional engineer registered in the State of Georgia.
2) Design flow rates for each pipe shall be evaluated independently based on the number of residential units served as described in the following formula:
QD = (3.36 x N0.785) + 50 Where: QD = Reuse Water Flow in gallons per minute N = Number of Equivalent Residential Units (ERU) 1 ERU = 300 Gallons per day
3) Design flows shall be distributed equally at each residential unit. When flow rates are aggregated to nodes for analysis, flow shall be assigned to the most distant node from the source.
4) Minimum reuse water delivery pressure at any point in the system shall be 45 psi when the system is operating at design flow rates based on a flow test conducted and approved by Paulding County.
5) In any case, lines shall not be less than four inches in diameter:
11.1.3 Reuse water system water balance.
1) The developer shall provide water balance calculations for the development performed by a professional engineer registered in the State of Georgia.
2) The water balance evaluation is critical to ensure the same volume of wastewater being discharged from a particular development can be returned for irrigation purposes (i.e. balanced). The water balance evaluates the projected average daily flow (ADF) from the proposed development and compares this to the computed total reuse return application rate (QA) considering each of the two application areas (residential lawns and irrigated open space):
3) Calculations must illustrate the development will have adequate spray area to accommodate 100 percent of the sewage generated from the development as described in the following formula:
WB = (QA/ADF)
Where: WB = Water Balance Ratio QA = Total Reuse Return Rate (gpd) ADF = Average Daily Flow (gpd)
4) A WB result of 1.0 or greater is required to meet the development's reuse demand.
5) The average daily flow (ADF) for the development will be based on 300 gallons per day for each equivalent residential unit (ERU).
6) The total reuse return rate for the development will be based on the residential and open space areas available to accept reuse water. Return rates for these two types of areas will be based on the formulas below.
QA = qr + qo Where: QA = Total Reuse Return Rate (gpd) qr = Residential/Commercial Reuse Return Rate (gpd) qo = Open Space Reuse Return Rate (gpd) qr = 0.08(n x ai x i) Where: qr = Residential Reuse Return Rate (gpd) n = Number of Residential Lots ai = Irrigable Area per Lot (Square Feet) i = Reuse Application Rate (in/wk) qo = 3,336(Ai x i) Where: qo = Open Space Reuse Return Rate (gpd) Ai = Irrigable Area per Lot (Acres) i = Reuse Application Rate (in/wk)
7) The reuse application rate (i) is generally accepted at 1.5 inches per week but can be adjusted at the discretion of the professional engineer based on the results of soil testing throughout the development. However, the reuse application rate will not exceed 1.8 inches per week.
8) Only commercial areas associated with PRD type zoned developments will be included in the calculations for reuse.
11.1.4 Applicable specifications and standards. The latest editions of the following specifications, standards and publications setting the minimum requirements for quality, safety and performance of work and materials form a part of these regulations as though fully repeated herein:
ASTM American Society of Testing Materials ANSI American National Standards Institute AWWA American Water Works Association OSHA Occupational Safety and Health Administration
11.1.5 Record standard details.
1) The contractor shall be responsible for maintaining a set of the approved design standard details, which have been marked to reflect as-built conditions. These "record standard details" shall be kept at the site during working hours and shall be made available to the department's inspectors upon request.
2) The record standard details shall show the as-built location of, but not be limited to, all lines, manholes, valves, hydrants, blow-off valves, monuments, etc.
3) As-built locations shall be dimensioned to two permanent fixtures or objects and shall include coordinates tied to Georgia State Plane Coordinate system.
11.2 Excavation, trenching and backfilling.
This section covers the excavation, trenching, and backfilling for all reuse water mains.
11.2.1 Density tests.
1) All trenches 12 inches or wider, as measured at the top, that are within roadways, or roadway rights-of-way, parking areas, and areas to be paved shall be tested for conformance to specified compaction requirements:
(a) These trenches shall be backfilled and compacted to their full depth.
(b) Tests shall be made within each 400 square feet of trench areas for each one foot of lift above top of conduit. Tests taken in one foot lifts shall be staggered.
(c) Compaction shall not be less than that of the surrounding areas or 95 percent of the maximum dry density as determined by the standard proctor test. The top 12 inches shall be compacted to a minimum of 98 percent of the maximum dry density.
(d) Backfill within the Georgia Department of Transportation right-of-way shall meet all requirements as stipulated in the "Utility Accommodation Policy and Standards", as published by the Georgia Department of Transportation.
(e) All trenches 12 inches or wider, as measured at the top, that are not within roadways, or other areas to be paved shall be compacted to not less than that of surrounding areas or 90 percent of the maximum dry density.
11.2.2 Sheeting and shoring materials.
1) Construction wood sheeting may be new or used lumber of a species or grade suitable for the proposed use.
2) If steel sheet piling is used, it shall conform to ASTM A328 and consist of rolled sections of the continuous interlocking type. Minimum thickness of the web and flange metal shall be 3
/8-inch, unless otherwise approved or specified. Rivet steel and structural material as fabricated connections and accessories shall conform to requirements of ASTM A502 and ASTM A36. All steel sheet piles shall be furnished with standard pulling holes located approximately four inches below the top of the pile.
3) The contractor shall retain full responsibility for the structural integrity and adequacy of the sheeting.
11.2.3 Sheeting and shoring activities.
1) All excavations shall be properly shored, sheeted and braced or cut back at the proper slope to furnish safe working conditions; to prevent shifting of material; to prevent damage to structures or other work; and to avoid delay to the work. Work shall be performed in all compliance with the most recent U.S. Department of Labor Occupational Safety and Health Administration 29CFR part 1926 Occupational Safety and Health Standards-Excavations, Final Rule. Bracing shall be so arranged as not to place any strain on portions of completed work until the general construction has proceeded far enough to provide ample strength.
2) Timber sheet piles shall be sharpened in a manner which will assist in holding them in true alignment during driving and the tops shall be protected with caps or other means to prevent damage by the driving equipment. Any pieces damaged or split below the point of cutoff shall be removed and replaced with undamaged pieces.
3) Sheet piles shall be carefully located and driven straight and true to the desired elevation with secure interlocking for the entire length. Damaged piling or one with faulty alignment shall be withdrawn and new piling driven properly in its place.
Jetting will not be permitted. Excavation shall not be carried in advance of the sheet piling.
4) Sheeting and bracing shall be removed as the excavation is refilled in such a manner as to avoid caving in of areas or structures. Voids left by withdrawal of the sheeting shall be carefully filled by ramming.
11.2.4 Excavation.
1) The contractor shall perform all excavation in accordance with the most recent OSHA standards and to the depths required or as shown on standard details. During excavation, materials suitable for backfilling shall be piled a minimum distance of two feet from the banks of the excavation to avoid overloading and to prevent slides and cave-ins.
2) Excavated materials not required for fill or back-fill shall be removed from the site.
Unless otherwise indicated or specified, all excavation shall be made by open cut. No tunneling shall be done.
3) Excavation shall not be carried below the designated level except where special bedding required due to unforeseen conditions, or is specified or shown on the standard details. Excess excavation below the designated level shall be backfilled with crushed stone and tamped.
4) Excess excavation for manholes and other structures shall be filled with crushed stone or concrete to the required elevation.
5) Trenches shall be only of sufficient width to provide a free working space on each side of the pipe. To prevent excess pressure on the pipe, the maximum width of pipe trench at the top of the pipe shall not be greater than two feet more than the pipe diameter.
If this maximum width is exceeded for water or sewer pipelines, the contractor shall provide Class A bedding as presented in article 7 of these regulations. The top portion of the trench above four feet shall be excavated with sloping sides in accordance with OSHA standards to any width which will not damage adjoining structures, roadways, pavements, utilities or private property. If it is deemed necessary to excavate trench with vertical sides, then OSHA approved shoring and sheeting methods shall be used.
6) All reuse water mains shall have a minimum of 48 inches of cover above the top of the pipe or 48 inches below edge of pavement, whichever is greater. All reuse water mains 12 inches and larger shall have a minimum of 60 inches of cover above the top of pipe or 60 inches below edge of pavement, whichever is greater unless otherwise indicated by the department.
7) The trench bottom shall be made to conform as near as possible to the shape of the lower third of the pipe. Excavation shall be made for joints of all pipes, and shall be of sufficient depth to permit access to the joint for construction and inspection. In no case shall the joints be used to support the body of the pipe. Bell holes shall be excavated in the trenches so as to relieve pipe bells of all load, but small enough to insure that support is provided throughout the length of the pipe barrel.
8) Unstable soil or soil unable to achieve 95 percent compaction as per Standard Proctor shall be removed and replaced with crushed stone, which shall be tamped.
9) Ground adjacent to all excavations shall be graded to prevent inflow of water.
10) The excavation of the trench shall not advance more than 100 feet ahead of the completed pipe work.
11) The contractor shall remove any water accumulated during excavation, whether from ground or surface sources.
12) The inspector shall be notified immediately upon encountering site conditions at variance to those indicated and any active or inactive utility encountered not indicated on the standard details.
13) No work shall be done to correct or incorporate unforeseen conditions until written instructions are issued.
14) No trenches will be permitted to be left open overnight, on weekends, or on holidays.
11.2.5 Rock excavation.
1) All rock encountered shall be removed six inches below the bottom grade of the trench where pipe is being laid, and the trench built back to the correct grade with suitable select material thoroughly tamped into place, unless the contractor is specifically directed to place stabilization material.
2) Blasting permits for each development shall be required. Blasting shall be done with the precautions specified by the state fire marshal and the Paulding County Fire Chief.
3) The contractor shall notify county fire departments prior to blasting operations.
4) All blasting operations and all handling, storage and use of blasting materials shall be in strict accordance with federal, state and local ordinances and regulations and shall be approved by the state fire marshal. Blasts shall be restricted to the extent that no appreciable shock will be transmitted to existing structures, pipelines, sewers, cables or other public or private facilities. The contractor shall be wholly responsible for any and all personal injury or property damage resulting from blasting.
11.2.6 Backfilling.
1) No backfilling shall be done over pipelines until all pipes have been inspected and approval received from the inspector, unless otherwise directed by the department.
2) Trenches shall be backfilled with earth backfill materials according to Water, Reuse Water and Sewer Pipe Bedding Details shown on Dwg. No. W&S-01. Bedding for Ductile Iron Pipe shall be minimum Class D. Bedding for all other pipe shall be minimum Class B. Backfill or bedding material shall be placed evenly around and on both sides of the pipe in six-inches maximum layers, and tamped until pipe has cover of not less than 18 inches above top of pipe or top of granular bedding material. The remaining backfill shall be placed evenly in 12-inch layers compacting each layer thoroughly to the specified compaction. Water settling shall not be permitted. Any trenches where settlement occurs shall be reopened, refilled and compacted, with the surface restored to the specified grade and compaction, and leveled for grassing.
3) Prior to backfilling at manholes, structures, and other accessories, all forms, trash and debris shall be removed. Backfill material shall be symmetrical on all sides in eight-inch maximum layers. Each layer shall be moistened and compacted with tamps.
4) Where pipes are in a fill section or are projecting into fill sections, ductile iron pipe shall be installed. Where material beneath the pipe is determined by the department to be unstable, then concrete foundation supports at each joint shall be provided and joints will be restrained. Where pipe is not structurally supported, unstable material shall be removed and trench stabilization provided. A pipe bed shall be constructed of No. 57 crushed stone and be compacted to at least 90 percent of the maximum dry density, unless otherwise specified.
5) The material shall be placed evenly in six-inch maximum layers to the proper sub-grade unless otherwise directed by the department. After the trench has been stabilized, normal backfill and compaction operations shall resume as specified herein.
6) Prior to final acceptance of the pipeline installations, the contractor shall refill all sunken trenches and excavations to final grade.
7) Earth backfill shall be free of stone and boulders. Acceptable backfill material may be from excavation or borrow areas.
8) No rock will be allowed in the backfill within a distance of 12 inches from the pipe or the ground surface, and rock larger than six inches in the greatest dimension will not be permitted in any part of the trench.
11.2.7 Subsurface obstructions.
1) The standard details indicate underground utilities or obstructions that are known to exist according to the best information available to the department. The contractor, as required by Georgia law, shall call the utilities protection center (UPC) and those utilities, agencies or departments that own and/or operate utilities in the vicinity of the construction work site to verify the location of, and possible interference with, the existing utilities, arrange for necessary suspension of service and make arrangements to locate and avoid interference with said utilities. Where these or unforeseen underground utilities are encountered, the location and alignment of the new facilities may be changed to avoid interference, upon written approval from the department.
2) The contractor shall furnish and have available at all times an electronic pipe detector, in good working order, to locate existing pipelines or other obstructions.
3) While excavating, backfilling and laying pipe, care must be taken not to remove, disturb, or injure any existing water, sewer, reuse water, gas pipes, or other conduits or structures. If necessary, the contractor, shall sling, shore up and maintain such structures in operation, and within a reasonable time shall repair any damage done to them. Before final acceptance of the work, he shall return all such structures to original condition.
4) The contractor shall give sufficient notice to the interested utility of his intention of removing or disturbing any pipes, conduits, etc., and shall abide by their regulations governing such work. In the event that any subsurface structure becomes broken or damaged in the course of the work, the contractor shall immediately notify the proper authorities, and shall be responsible for all damage to persons or property caused by such damage.
5) When pipes or conduits providing services to adjoining buildings are broken during the progress of the work, the contractor shall repair them at once, or if repaired by the utility involved, shall pay the utility any charges for having such repairs made by the utility.
6) The department will not be liable for any claim made by the contractor based on underground obstructions being different to that indicated in these regulations or on the plans.
11.3 Materials.
11.3.1 General.
1) Materials to be incorporated into the work shall be new and unused, and shall conform to all applicable requirements of these specifications. Submittal and approval of all materials, shop standard details, or samples shall be in conformance with these specifications. Any materials installed prior to approval by the department will be subject to rejection, and will be removed at the contractor's expense.
2) All reuse water mains shall be polyethylene (HDPE) or ductile iron pipe unless otherwise specified by the department for extenuating circumstances. The department will allow HDPE for reuse water mains eight inches in diameter or less as specified herein under certain laying conditions.
3) All reuse water service lines shall be copper tubing unless otherwise specified by the department for extenuating circumstances. The department may allow polyethylene (HDPE) tubing for service lines on a case by case basis.
4) Any pipe and services installed in designated high pressure zones shall conform to applicable specifications.
5) Acceptance will be on the basis of inspection and the manufacturer's written certification that the pipe, fittings and appurtenances were manufactured and tested in accordance with the applicable standards.
6) Any pipe, fittings and appurtenances used in the installation or repair of water mains or services shall be lead-free pipe and fittings by an all-American manufacturer.
11.3.2 Ductile iron pipe (DIP).
1) Ductile iron pipe from an approved manufacturer such as U.S. Pipe, American, Clow, or an approved equal shall conform to AWWA C151 (ANSI A21.51) and shall be a minimum of pressure Class 350 or thickness Class 50 unless otherwise specified or shown on the standard details. Pipe sizes will be as shown on all plans and details. All pipes shall be furnished in minimum lengths of 18 feet. Pipe and fittings shall be cement lined in accordance with AWWA C104. Fittings shall be mechanical joint compact ductile iron and conform to AWWA C153 with rated working pressure of 350 psi or AWWA C110 with rated working pressure of 250 psi. Pipe and fittings shall be furnished with a bituminous outside coating.
2) Joints shall be push-on type for pipe and standard mechanical joints for fittings with the exception of hydrant fittings. Fittings for bends shall be mechanical joint with retainer glands. Joints shall conform to AWWA C111. Provide and install the appropriate gaskets, nuts and bolts for mechanical joints. Nuts shall be steel with American Standard Regular hexagonal dimensions, all as specified in ANSI B17.2.
3) All bolts and all nuts shall be threaded in accordance with ANSI B1.1, Coarse Thread Series, Class 2A and 2B fit.
4) When flanged joints are indicated provide gaskets for flange joints made of 1 /8-inch
thick cloth reinforced rubber. Gaskets may be ring type or full-face type.
5) Provide bolts for flange connections. Bolts shall be steel with American Regular unfinished square or hexagon heads. Nuts shall be steel with American Standard Regular hexagonal dimensions, all as specified in ANSI B17.2. All bolts and all nuts shall be threaded in accordance with ANSI B1.1, Coarse Thread Series, Class 2A and 2B fit.
6) Pipe shall be marked in accordance with section 11.3.15.
11.3.3 High density polyethylene pipe (HDPE).
1) When permitted in lieu of DIP, pipe for reuse water mains shall be High Density Polyethylene Pipe (HDPE) conforming to the requirements of AWWA C906. All HDPE pipe shall be DR-9 with a pressure rating of not less than 200 psi and with outside dimensions matching ductile iron pipe sizes. The HDPE material shall be PE 3408 meeting the requirements of ASTM D3350.
2) HDPE pipe will not be allowed if pressures exceed 150 psi.
3) HDPE pipe for reuse water system shall be colored Pantone Purple 522C or shall have longitudinal stripes colored Pantone Purple 522C (minimum of 2) 11 /2 inches wide
impregnated in the pipe material.
11.3.4 Service tubing.
1) Service lines shall be copper tubing conforming to ASTM Designation B88 for the Type "K" soft Temper and AWWA 7S-CR Type "K" and may be used in 20 foot straight length or 60/100 foot coils. Service tubing shall be painted and sleeved in accordance with the requirements for marking reuse water lines.
2) The department may allow service lines with pressures not to exceed 125 psi to be of polyethylene tubing conforming to AWWA C901 and manufactured of Type II, Grade 34, Class C very high molecular weight polyethylene meeting the requirements of PE 3408. Tubing shall have an SDR of 9, shall be rated for 200 psi, and shall be type CTSVOD (copper tubing size). Fittings shall be brass with compression connection inlets and outlets, ANSI B16.26. HDPE pipe for reuse water service lines shall be colored Pantone Purple 522C by color impregnated in the pipe material.
3) Where required, adapters shall be brass ANSI B 16.18. Unions shall be cast bronzes.
Joints shall be compression type.
11.3.5 Gate valves.
1) Gate valves size three inches and larger shall be resilient seat wedge type and shall conform with the specifications of the American Water Works Association, Designation C509, latest edition rated for 200 psi minimum working pressure. Gate valves shall be equipped with "O" ring stem seals above and below stem thrust collar. Gate valves for use on mechanical joint ductile iron pipe and slip joint ductile iron pipe shall have manufacturer's standardized mechanical joint ends. Gate valve body and bonnet shall be ductile or cast iron and shall be fusion bonded, interior and exterior, with epoxy coating which conforms to AWWA C-550, latest edition.
2) Reuse water mains in which the valves are installed shall be tested as specified and the valve must remain water tight under this pressure in each direction.
3) Valves shall open counter clockwise (no exceptions will be allowed); shall be designed for vertical installation; and shall be the nonrising stem type.
4) Valves shall be equipped with valve boxes. Provide extension stem where required to bring the operating nut to within 36 inches of ground surface and shall have a 24 inches x 24 inches x ten inches concrete collar poured in place. Trowel level with ground surface.
5) All gate valves shall be manufactured by Mueller or M and H valve.
6) Gate valves 21 /2 inches in diameter and smaller shall be bronze, heavy duty, rising stem (21
/2 inches and smaller only), rated for 200 psi WSP. Valves shall conform to Federal Specification WW-V-54, Class A, Type II, and shall be equal to Crane 428.
11.3.6 Butterfly valves.
1) Butterfly valves shall be resilient seated, short body design and shall conform to AWWA C-504 latest edition. Valves shall be Class 250 (250 psi bi-directional shut-off rating, 500 psi body hydrostatic shell test, fusion bonded epoxy coated interior and exterior, and maximum line velocity of 16 feet per second). Valves shall be Mueller Class 250 M. J. (12" - 48"), M and H Style 4500 M. J. (12" - 48"), or PRATT valve.
Certified test results shall be furnished with each valve.
2) All 20 inch and larger butterfly valves shall have six inch bypass line to gate valve assembly.
11.3.7 Valve boxes. All valve boxes and valve box risers shall be cast or ductile iron. Valve boxes shall be two-piece heavy roadway type with inside diameter of barrel not less than five inches. Valve covers shall weigh a minimum of 13 pounds. They shall be the extension type with screw-type adjustment and with flared base. The minimum thickness of metal shall be 3
/16-inch. The word "REUSE WATER" shall be cast on the cover. Covers shall be colored Pantone Purple 522C. The boxes shall be of such length as will be adapted without full extension, to the depth of cover required over the pipe at the valve location. All valve boxes and valve box risers shall be manufactured in USA only.
11.3.8 Tapping valves and sleeves.
1) Tapping sleeves shall be cast or ductile iron of the split-sleeve, mechanical joint type.
Valves shall be resilient seat gate valves sizes six inches - ten inches.
2) Tapping valves shall be Mueller Model H-687 sizes four inches - ten inches, H-667 sizes 12" - 20", M & H Style 3751-NRS sizes four inches - ten inches or Style 751 sizes 12 inches - 20 inches. Sleeves shall be Mueller Model H-615, M & H Style 1174-01.
3) Connections to reuse water mains may use tapping sleeve and valve as permitted according to the table below. Where not specifically permitted for tapping sleeve and valves, connections are to be made by cut-in to the existing line. No taps are permitted to six inch and smaller lines.
Tapping Schedule Existing Pipe Size Largest Tap Permitted* 6-inch not permitted 8-inch 6-inch 10-inch 8-inch 12-inch 10-inch 14-inch 12-inch 16-inch -Cut-in 20-inch -Cut-in 24-inch Cut-in 30-inch Cut-in *Next smallest pipe size is largest tap permitted.
11.3.9 Double check backflow preventers.
1) Double check backflow preventers shall conform to the following standards: A.S.S.E.
No. 1015, A.W.W.A., C506, C.S.A. B64.5, FCCCHR of USC Manual - Section 10, U.L.
Classified File No. EX3185, and be accepted by IAPMO (UPC), SBCCI (Basic Plumbing Code).
2) Shut-off valves for backflow preventers in sizes two inch and smaller shall be full-port ball-type, with threaded connections and bronze bodies with copper content not less than 80 percent. Shut-off valves for backflow preventers in sizes 21 /2 inches and larger
shall be full-port ball-type, or resilient-wedge gate-type, with flanged connections, and iron bodies with FDA-approved fusion bonded epoxy coating inside and out.
3) Double check backflow preventers shall be Ford or approved equal.
11.3.10 Double detector check valve assembly.
1) Double detector check valve assemblies shall conform to the following standards:
A.S.S.E. Standard No. 1015, AWWA Standard C 506; FCCCHR of USC Manual Section 10., U.L. Classified File No. EX 3185, and be listed under CSA B.64 Standard.
2) All assemblies shall be standard equipped with epoxy coated UL/FM listed OS & Y resilient seat gate valves. Check valve bodies shall be epoxy-coated cast iron. The by-pass line unit shall consist of an approved double check backflow preventer and water meter that reads in gallons.
3) Double detector check assemblies shall be Watts 709DDC or approved equal.
11.3.11 Valve markers. Valve markers shall be four feet long concrete posts. They shall have "REUSE WATER" imprinted on one side. A brass disc shall be cast into the marker immediately below the imprint indicating the distance to the valve. The upper 12 inches of marker shall be painted Pantone Purple 522C to indicate reuse water. Valve locations shall be clearly marked by an arrow painted on the nearest curb or pavement using Pantone Purple 522C paint.
11.3.12 Corporation cocks and curb stops.
1) All 3 /4-inch and one-inch corporation cocks shall be Mueller or Ford or approved equal.
All 11 /2 inches and two inches corporation cocks shall be Mueller or Ford or approved equal.
2) Curb stops for reuse water service connections shall have a compression connection on one end and a male I.P.T. on the other end. Reuse water service curb stops shall be Mueller or Ford or approved equal. Ball style curb stops shall include integral lock wings.
3) Curb stops for two-inch blow-off assemblies shall have inside I.P.T. on both ends. They shall be Mueller or Ford or approved equal.
11.3.13 Reuse hydrants.
1) Reuse fire hydrants.
(a) All reuse hydrants shall conform to the requirements of AWWA C 502 for minimum 150 psi working pressure. Hydrants shall be the compression type, closing with line pressure. The valve opening shall not be less than 51 /4 inches.
(b) In the event of a traffic accident, the hydrant barrel shall break away from the standpipe at a point above grade and in a manner that will prevent damage to the barrel and stem, preclude opening of the valve, and permit rapid and inexpensive restoration without digging or cutting off the water.
(c) The means for attaching the barrel to the standpipe shall permit 360 degree rotation.
(d) Hydrants shall be fully bronze mounted with all working parts of bronze. Valve seat ring shall be bronze and shall screw into a bronze retainer.
(e) All working parts, including the seat ring shall be removable through the top without disturbing the barrel of the hydrant.
(f) The operating nut shall match those on existing hydrants. The operating threads shall be totally enclosed in an operating chamber separated from the hydrant barrel by a rubber O-ring stem seal and lubricated by grease or an oil reservoir.
A stop nut shall be positioned in the top operating mechanism of the hydrant so that the valve stem cannot contact the bottom of the shoe when the hydrant is fully open.
(g) Minimum depth of bury shall be four feet. Extension sections shall be furnished where necessary to bring hydrant to the proper elevation. Extensions shall be installed in accordance with manufacturer's recommendations. The centerline of the 2-1
/2 inch connections shall be a minimum of 18 inches above finished grade.
(h) Hydrants shall be a nonfreezing design and provided with a simple, positive, and automatic drain, which shall be fully closed whenever the main valve is opened.
(i) Hose and pumper connections shall be breech-locked, pinned, or threaded and pinned to seal them into the hydrant barrel. Each hydrant shall have two 21
/2-inch hose connections and one 41 /2-inch pumper connection, all with National Standard threads and each equipped with cap and nonkinking chain.
(j) All outside surfaces of the barrel above grade shall be painted Pantone Purple 522C.
(k) Fire hydrants shall be Mueller or M & H or approved equal.
2) Reuse flush hydrants.
(a) Reuse flush hydrants shall be Eclipse No. 85 hydrant as manufactured by John
C. Kupferle Foundry Company, St. Louis, MO.
(b) Hydrants shall be self-draining, nonfreezing, compression type with 23 /16 inch
main valve opening. Inlet connection shall be with three-inch mechanical joint.
Outlet size shall be 21 /2 inches NST.
(c) Principal interior operating parts shall be brass and removable from the hydrant for servicing without excavating the hydrant.
(d) Hydrants shall be set in four cubic feet of crushed stone to allow for proper drainage of the hydrant. Recommendations of the AWWA should be followed for installation of the hydrants.
(e) Cast iron boxes shall be shop-painted interior and exterior prior to delivery using approved two-part epoxy paint. The color of meter boxes shall be Pantone Purple 522C.
(f) Box and lid shall be marked per the standard detail drawing.
11.3.14 Retainer glands.
1) Retainer glands shall be ductile iron and shall be manufactured in the United States.
2) Retainer glands shall be provided at all mechanical joints, including fittings, valves, and other locations as shown on the standard details or as directed by the department.
3) Retainer glands shall be one of the following types: Set Screw Type - Set screw type retainer glands shall be ACIPCO, EBAA Iron, Union Foundry, or Tyler. Compact/ lightweight retainer glands shall not be allowed. The minimum working pressure and minimum weight, excluding set screws and gasket material, shall be as follows:
Retainer Gland Specifications Retainer Gland Size (Inches) Minimum Working Pressure (PSI) Minimum Weight Weight (Pounds) 4 350 6.0 6 350 11.8 Retainer Gland Size (Inches) Minimum Working Pressure (PSI) Minimum Weight Weight (Pounds) 8 250 16.0 12 250 24.8 16 200 50.0 20 200 72.5 24 150 85.0
4) Wedge Type: Wedge type retainer glands shall be MEGALUG, Series 1100 as manufactured by EBAA Iron, Inc.
11.3.15 Locator wire. Locator wire shall be Number 14 AWG solid THHN plastic coated copper wire with purple insulation. Locator wire shall be installed as shown on standard details or as approved by the department. Locator wire shall be used on all installations of nonmetallic pipe (AWWA C906 HDPE, AWWA C901 PE, or other approved nonmetallic pipe).
11.3.16 Marking of ductile iron pipe. Ductile iron pipe for reuse water service shall be clearly identified as reuse pipe by encasing the entire length of reuse water line in Polyethylene Encasement meeting the requirements of AWWA C105 and impregnated with color to match Pantone Purple 522C. Where specifically allowed by the department, ductile iron pipe may be identified by continuous polyethylene marking tape as required herein. Painting of the pipe is not acceptable.
11.3.17 Casing pipe.
1) Steel casing pipe shall be manufactured from steel conforming to ASTM A 139, Grade B and shall be new and unused. Minimum size and thickness shall be as follows:
Casing Pipe Under Roadways Pipe Diameter (inches) Casing Diameter (inches) Wall Thickness (inches) 6 12 0.250
8 16 0.250 10 16 0.250 12 18 0.250 14 22 0.375 16 24 0.375 18 30 0.375 20 30 0.375 24 36 0.375 30 42 0.375 Casing Pipe Under Railroads Pipe Diameter (inches) Casing Diameter (inches) Wall Thickness (inches) 6 14 0.250
8 18 0.250 Pipe Diameter (inches) Casing Diameter (inches) Wall Thickness (inches) 10 20 0.281
12 22 0.375 14 24 0.375 16 30 0.406 18 30 0.406 20 32 0.469 24 32 0.469 30 42 0.500
2) The materials for casings under state highways shall be in accordance with the Georgia Department of Transportation Standard Specifications for the Construction of Roads and Bridges, latest edition. It shall be the contractor's responsibility to determine the exact requirements of the Georgia Department of Transportation. If there is a conflict between these regulations and the Georgia Department of Transportation Specifications, the latter shall take precedent.
11.3.18 Bedding materials. Embedment materials shall be angular graded crushed stone, 1
/4-inch to 3 /4-inch in size with no more than five percent passing a No. 8 standard sieve in accordance with Class 1 materials as defined in ASTM D2321 Section 5.1.1.
11.3.19 Concrete thrust block. Concrete shall be approved by the department prior to using in public system. Concrete shall be plant-mix from an approved local concrete plant. Concrete shall be mixed and transported in accordance with ASTM C 94. Concrete shall have a compressive strength of not less than 3,000 psi. Reinforcing steel shall conform to the requirements of ASTM A 615, Grade 60.
NOTE: No on-site mixed concrete shall be incorporated in the work except at the written direction of and in the presence of Paulding County Water and Sewer System Department inspector.
11.3.20 Meter boxes.
1) Meter boxes and covers shall be constructed of cast iron or plastic. Construction of box and cover shall match in any installation. In the case of subdivision installation, all meter boxes for a single development shall be of the same type unless otherwise specifically approved by the department.
2) Meter boxes and covers shall be colored to indicate reuse water service. Plastic boxes shall be impregnated such that the color is consistent throughout the structure of the box. Cast iron boxes shall be shop-painted interior and exterior prior to delivery using an approved two-part epoxy paint. The color of meter boxes shall be Pantone Purple 522C.
3) If plastic boxes are provided, they shall be high-density polyethylene.
4) Boxes shall be sized according to the size meter they are to house (see standard detail).
5) Meter boxes and covers shall be manufactured in the USA only.
11.3.21 Materials for structures.
1) Provide materials for construction of manholes and other structures in accordance with the following:
(a) Pre-cast concrete sections shall meet the requirements of ASTM C478. The minimum compressive strength of the concrete in pre-cast sections shall be 4,000 psi. The minimum shell thickness shall be 1
/12 of the inside diameter of the riser or the largest cone diameter.
(b) Pre-cast manhole cones shall be the eccentric type.
(c) Seal joints between pre-cast sections by means of rubber O-ring gaskets or flexible butyl rubber sealant. Butyl rubber sealants shall meet the requirements of AASHTO M-198. Sealant shall be preformed type with a minimum nominal diameter of one inch. Butyl rubber sealant shall be equal to Kent-Seal No. 2 or Concrete Sealants CS 202.
(d) Brick shall be whole and hard burned, conforming to ASTM C 32 Grade MS.
Mortar shall be made of one part Portland cement and two parts clean sharp sand. Cement shall be Type 1 and shall conform to ASTM 150. Sand shall meet
ASTM C 53.
(e) Cast iron manhole frames and covers shall meet the requirements of ASTM A 48 for Class 30 gray iron and all applicable local standards. All castings shall be tough, close grained, smooth and free from blow holes, blisters, shrinkage, strains, cracks, cold short and other imperfections. No casting will be accepted which weighs less than 95 percent of the design weight. Shop standard details must indicate the design weight and provide sufficient dimensions to permit checking. All castings shall be thoroughly cleaned in the shop.
Specifications for Manhole Frames and Covers Design Manufacturer's Type Weight Reference Traffic Catalog No. 362 or Vulcan Cat. No. V-1480-1 355 pounds U.S. Foundry
2) All frames and covers shall have machined horizontal bearing surfaces.
3) Watertight type traffic frames and covers shall have the same weight and dimensions as those specified in these regulations.
4) All manhole covers shall have the word "REUSE WATER - DO NOT DRINK" cast in the top.
5) Manhole steps of polypropylene molded around a steel rod equal to products of M.A.
Industries shall be used.
6) Preformed rubber boots and fasteners equal to those manufactured by Kor-N-Seal or Press Seal Gasket Corporation shall be provided in the pipe openings in pre-cast manhole sections.
7) All grout shall be nonmetallic, nonshrink type. Cement shall be Type III. Grout shall meet the following requirements:
Grout Requirements Criteria Test Method Result Workability ASTM C-191 Initial set time not less than 60 minutes Compressive Strength (restrained condition) ASTM C-109 1 day - 3,000 psi Shrinkage ASTM C-827 and CRD 588 No shrinkage after placement or shrinkage after set
NOTE: The contractor shall furnish independent laboratory test results as evidence of full compliance with these requirements. Grout shall be mixed and placed in accordance with the recommendations of ACI, and the grout manufacturer's published recommendations.
11.4 Execution.
11.4.1 Pipeline installation.
1) Proper and suitable tools and appliances for safe and convenient handling and laying of pipe and fittings shall be used. Great care shall be taken to prevent the pipe coating from being damaged particularly cement linings on the inside of the pipes and fittings.
Any damage shall be remedied as directed.
2) All pipe and fittings shall be carefully examined by the contractor for defects just before laying and no pipe or fitting shall be laid which is defective. If any defective pipe or fitting is discovered after having been laid, it shall be removed and replaced in a satisfactory manner with a sound pipe or fitting by the contractor at his own expense.
3) No pipe shall be laid in water. The contractor will be required to operate pumps, if necessary, to remove water (whether from ground or surface sources) from the trench while pipe is being laid and joints are being made. When work is not in progress the ends of the pipe shall be closed to prevent water or other foreign material from entering the pipe. Valves installed on existing mains shall be kept closed until after the line is tested, disinfected, and accepted for service.
4) Pipe laid in trenches shall be laid true to line and grade on a firm and even bearing for its full length at depths and grades as indicated. Adequate precautions shall be taken to prevent floatation of pipelines prior to backfilling. Installation of ductile iron pipe in underground pressure piping systems shall conform to the requirements of AWWA C600. Excavation of trenches and backfilling around pipes shall conform to the requirements of the section entitled "Excavation, Trenching and Backfilling" of these regulations.
5) All reuse water mains shall have a minimum of 48 inches of cover above the top of the pipe or 48 inches below edge of pavement, whichever is greater.
6) Horizontal separation from water lines, sanitary sewer lines, or sanitary force mains:
Reuse water mains and service lines shall maintain a minimum of three feet edge-to-edge horizontal separation from water lines, sanitary sewer lines, or sanitary force mains. Do not lay reuse water line in the same trench with gas lines, fuel lines or electric wiring. No reuse water main shall pass through or come in contact with any part of a sanitary sewer manhole.
7) Vertical separation from water lines, sanitary sewer lines, or sanitary force mains: If the reuse water main or service line cannot be installed with the above-described horizontal separation, the following vertical separation shall apply. Where reuse water mains are within three feet horizontally or cross water lines, sanitary sewers or sanitary force mains, the reuse water main shall have a minimum of 18-inches edge-to-edge vertical separation from water lines, sanitary sewers or sanitary force mains as follows. Reuse water mains shall be installed at least 18 inches below water lines. Reuse water mains shall be installed at least 18 inches above sanitary sewers or sanitary force mains.
8) All elbows, tees, branches, crosses, and reducers in pressure piping systems shall be adequately restrained against thrust. Underground pressure piping containing unharnessed push-on or mechanical joints or expansion joints shall be restrained by thrust blocks. The contractor may use forms or earth walls to mold the thrust blocks.
When earth walls are used, they shall be cut true to shape and all excess earth removed. The work shall be conducted so that no loose earth will become mixed with the concrete. At the end of 24 hours, damp earth may be placed over the concrete to retain moisture.
9) All lumps, blisters, excess coating, dirt and other objectionable substances shall be removed from the bells and spigots. Bells and spigots shall be wiped clean and dry.
Bells shall be centered in the trench and spigots driven home.
10) The contractor shall keep a transit and appurtenances on the job to be used for laying out the angles required for making bends and other works of this nature.
11) Provide casing pipe where reuse water lines cross roads. Casings are required at all roads, unless ductile iron pipe is used and the water and sewer system director grants a waiver. Such waiver shall be approved during the plan review process and recorded on the construction plans.
12) Bends, valves and other points where deemed necessary shall be blocked and harnessed to resist thrust. This shall be accomplished by methods and means approved by the department. All forms used to form concrete for blocking shall be removed before backfilling. All stress points and ends of mains shall be inspected before backfilling.
13) Blow-off valves shall be installed at terminus of all dead end mains. Method of installation shall be approved by the department. Refer to standard details for two inch blow-off details.
14) Whenever pipe requires cutting to fit the lines or install fittings, the work shall be done in such manner as to leave a smooth end at right angles to the axis of the pipe. Special care shall be exercised to guard against breaking or splitting the existing piping.
15) All cutting of ductile iron pipe shall be done with a cutting saw. All burrs shall be removed from the inside and outside edges of all cut pipe.
16) Mechanical joints and restrained joints shall be made in strict accordance with the pipe manufacturer's instructions. The gaskets and follower rings shall be kept clean and carefully centered in the bell with the bolts and bolt holes always parallel with the centerline of the pipe. The coating and lining of the pipe shall not be damaged. The nuts on all bolts shall be started and tightened evenly around the entire circumference of the pipe. No one nut shall be tightened more than 1
/2 turn tighter than the remainder of the nuts of the joint. When the joint is complete, the follower ring shall be equal distance from (parallel with) the face of the bell. Bolts shall not be over-stressed and shall be tightened just enough to compress the gasket sufficient to prevent leakage.
Just prior to assembly, the gasket shall be cleaned of all foreign material and shall be brushed with soapy water just before slipping the gasket over the spigot and into the bell of the pipes. The joint shall be in straight alignment during assembly. Any deflection required shall be made after assembly but before tightening bolts. Bolts shall be tightened with torque wrenches with the following torque loads applied:
Range of Torque Bolt Size (inches) Foot Pounds 5 /8 45 - 60 3 /4 75 - 90 1 100 - 120 11 /4 120 - 150
17) Push-on type joints shall be made in strict accordance with the pipe manufacturer's instructions. All joints shall be completely "belled-up" and all spigots shall be "home".
The gasket seat in the socket, the gasket and the plain end of the pipe to be entered shall be wiped clean before assembly. After the gasket has been inserted into the gasket recess, a thin film of lubricant shall be applied to the inside surface of the gasket and to the outside surface of the spigot end of the pipe to be jointed. After lubricating, the end of the pipe shall not be allowed to touch the bottom or side of the trench causing dirt to adhere to the joint surface. When pipe is cut in the field, the cut end of the pipe shall be beveled with a file or grinder. The joint shall be in straight alignment while pushing the pipe to make assembly. Any deflection required shall be made after the joint is assembled.
18) Set screw type retainer glands shall be installed in strict accordance with the fitting manufacturer's instructions. After making up the mechanical joint as previously specified, the set screws shall be run down until they are in firm contact with the pipe.
The set screws shall then be tightened once completely around the joint to approximately 40 foot-pounds torque. Finally, the set screws shall be tightened twice completely around the joint to the following torques, unless a "break-away" torque is used:
3" through 12" glands - 80 foot - pounds 14" through 24" glands - 65 foot — pounds
19) Wedge type retainer glands shall be installed in strict accordance with the manufacturer's instructions. Impact wrenches shall be prohibited for used with "break-away" nuts for final tightening.
20) Retainer gland joints shall be made in straight alignment and any deflection required shall be made before tightening the joint bolts or set screws.
21) Deflection of any pipe at joints for long radius curves or for avoiding obstacles shall be permitted only upon approval of the department.
22) Where deflection of joints is permitted, such deflection shall be made in accordance with manufacturer's recommendations.
11.4.2 Connections to reuse water mains.
1) Connections shall be made to existing pipelines in accordance with instructions from the water and sewer system department and after written permit is obtained from the water and sewer system inspector.
2) Before laying pipe, locate the points of connection to existing mains and uncover as necessary for the department to confirm the nature of the connection to be made.
3) Interruption of services - Make connections to existing reuse water mains only when system operations permit. Operate existing valves only with the specific authorization and direct supervision of the department.
4) Tapping sleeves:
(a) Prior to attaching the sleeve, the pipe shall be thoroughly cleaned, utilizing a brush and rag, as required.
(b) Before performing field machine cut, the water tightness of the sleeve assembly shall be pressure tested. The interior of the assembly shall be filled with water.
An air compressor shall be attached, which will induce a test pressure as specified in this article. No leakage shall be permitted for a period of five minutes.
(c) After attaching the sleeve to an existing main, but prior to making the tap, the interior of the assembly shall be disinfected. All surfaces to be exposed to reuse water shall be swabbed or sprayed with a one-percent hypochlorite solution.
5) Connecting to existing side street mains:
(a) Before taking existing side street mains out of service, taps for air removal shall be made at each high point along the section of existing main to be temporarily taken out of service. With the department's approval at each location, existing service lines may be used to expel air.
(b) Close service line curb stops along the section or sections that will be dewatered and close all connecting main valves.
(c) Take existing main out of service, cut and complete connection as detailed on the standard details.
(d) Open appropriate valve and after expelling all air, return existing main to Service and re-open all service line curb stops.
(e) At all taps to remove air, install brass cap on corporation stop, backfill, and replace pavement where required.
11.4.3 Valve and fitting installation.
1) Prior to installation, valves shall be inspected for direction of opening, number of turns to open, freedom of operation, tightness of pressure-containing bolting and test plugs, cleanliness of valve ports and especially seating surfaces, handling damage and cracks.
Defective valves shall be corrected or held for inspection by the department. Valves shall be closed before being installed.
2) Valves, fittings, plugs and caps shall be set and joined to the pipe except that 12 inch and larger valves shall be provided with special support, such as treated timbers, crushed stone, concrete pads or a sufficiently tamped trench bottom so that the pipe will not be required to support the weight of the valve. Valves shall be installed in the closed position.
3) A valve box shall be provided on each underground valve. They shall be carefully set, centered exactly over the operating nut and truly plumbed. The valve box shall not transmit shock or stress to the valve. The bottom flange of the lower belled portion of the box shall be placed below the valve operating nut. This flange shall be set on brick, so arranged that the weight of the valve box and superimposed loads will bear on the base and not on the valve or pipe. Extension stems shall be installed where depth of bury places the operating nut in excess of 30 inches beneath finished grade so as to set the top of the operating nut 30 inches below finished grade. The valve box cover shall be flush with the surface of the finished area or such other level as directed by the department.
4) If valve boxes are installed concurrently with valves, the contractor shall be responsible for maintaining valve boxes until the warranty period expires. All lost or damaged valve boxes shall be replaced by the contractor, at the contractor's own expense.
5) A concrete pad shall be required around each valve box, the top flush with the cover as detailed on the standard details. Pre-cast valve pads will only be allowed where approved by the department and specifically noted on the construction plans. Pre-cast pads shall not be used on slopes or in ditches.
6) In no case shall valves be used to bring misaligned pipe into alignment during installation. Pipe shall be supported in such a manner as to prevent stress on the valve.
7) Where main valves are shown on the standard details adjacent to intersection tees, install the valves no more than four feet from the tee unless shown or specified otherwise.
8) Nonrestrained and push-on joints shall not be installed within 15 feet of restrained joints at valves or fittings, unless shown otherwise on the standard details or approved by the department.
11.4.4 Jack and bore.
1) The contractor shall provide to the department, for approval, a detailed plan for the methods proposed for the construction of the casing. These plans shall include the methods proposed for groundwater control and face protection.
2) In general, jack and bore operations shall conform to the requirements of the Georgia Department of Transportation as presented in their Standard specifications for the construction of roads and bridges, latest edition. If a conflict between these regulations and the Georgia Department of Transportation specifications exists, the more stringent specifications shall govern.
3) Install the steel casing pipe by the dry boring method. Bore the hole and install the casing through the soil simultaneously by a cutting head on a continuous auger mounted inside the casing pipe. Fully weld lengths of casing pipe to the preceding section in accordance with AWS recommended procedures. After the boring and installation of the casing is complete, install a cleaning plug on the rig and clean the casing.
4) After construction of the casing is complete, and has been accepted, install the pipeline in accordance with the detailed standard details and/or these regulations.
5) Check the alignment and grade of the casing and prepare plan for approval to set the carrier pipe at proper alignment, grade and elevation. The carrier pipe shall be supported by stainless steel casing spacers to preclude movement within the casing.
One spacer shall be placed not more than two feet from each end of the casing.
Subsequent spacers shall be placed at six feet - ten feet intervals within the casing.
6) Provide all necessary bracing, bulkheads, and shields to ensure complete safety to all traffic at all times during the work. Perform the work in such a manner as to not permanently damage the roadbed or interfere with normal traffic over it.
7) Begin the boring operation in a pit, sheeted and shored as necessary and begin at and proceed from one end. Observe all applicable requirements of Georgia Department of Transportation Regulations or Paulding County DOT, as applicable.
8) Conduct the operations in such a manner that all work will be performed below the level of the roadbed. Coordinate and schedule all of the work with Georgia Department of Transportation or Paulding County Department of Transportation, as applicable.
9) Complete all boring work at one particular location before boring work is started at another location.
10) If the casing installation work is being conducted in an unsafe manner or in a manner detrimental to the overpassing roadway or to the safety of the traveling public, all operations of boring shall cease until the necessary corrections have been made. In the event that distress occurs to the roadway due to the boring, the contractor shall be required to submit a plan to repair the roadway. The plan must be acceptable to the Georgia Department of Transportation or Paulding County Department of Transportation, as applicable and Paulding County Water and Sewer System Department.
11.4.5 Directional drilling.
1) The department may allow installation of reuse water mains by directional drilling.
The contractor shall provide to the department, for approval, a detailed plan for the methods proposed for directional drilling. These plans shall include plan and sectional views of the proposed installation, location of all known utilities within 20 feet of the proposed installation, the methods proposed for installing the reuse water main, and the methods proposed for preventing damage to existing facilities.
2) No reuse water main shall be installed using directional drilling without the written approval of the department.
3) Provide necessary signage, traffic controls, and protection of personnel to ensure complete safety to all traffic at all times during the work. Perform the work in such a manner as to not permanently damage the roadbed or interfere with normal traffic over it.
4) Observe all applicable requirements of Georgia Department of Transportation regulations. Coordinate and schedule all of the work with Georgia Department of Transportation or Paulding County Department of Transportation.
5) If directional drilling is being conducted in an unsafe manner or in a manner detrimental to the over passing roadway or to the safety of the traveling public, all operations of boring shall cease until the necessary corrections have been made. In the event that distress occurs to the roadway due to the boring, the contractor shall be required to submit a plan to repair the roadway. The plan must be acceptable to the Georgia Department of Transportation or Paulding County Department of Transportation, as applicable and Paulding County Water and Sewer System Department.
11.4.6 Free boring.
1) The contractor may construct a driveway crossing by the free bore method, in lieu of making a pavement cut, where indicated on the standard details and approved by the department. The free bore method shall be accomplished by the dry auger boring method without jetting, sluicing, or wet boring.
2) The diameter of the free bore shall not exceed the pipe bell outside diameter or the pipe barrel outside diameter plus one inch, whichever is greater.
3) Free boring is allowable only under residential driveways. Free boring is not allowed under commercial driveways or any roadway.
4) The contractor shall be responsible for any settlement of the driveway caused by the free bore construction activities.
5) If the contractor elects to free bore and an acceptable installation does not result for any reason, the contractor shall install a casing pipe by the bore and jack method.
11.4.7 Double check backflow preventers.
1) Double check backflow preventer may be required at specific locations as directed by the department. When required, the backflow preventer shall be housed in a meter box or vault as per the detail.
2) One and one-half inch and smaller backflow preventers require a minimum of 6-inches below, eight inches behind, eight inches in front of, and three inches above the highest point on the device or its valves.
3) Two-inch and larger backflow preventers require a minimum of 12 inches below, 12 inches behind, 24 inches in front of and three inches above the highest point on the device or its shut off valves.
4) A minimum of six inches between the pit walls and the large device's valves and three inches between the pit walls and the valves on the small devices is required.
5) The dimensions given above assume a standard "shallow" installation. If the depth exceeds 12 inches to the top of the device the other dimensions will need to be increased accordingly and be approved by the department.
11.4.8 Double detector check valve assemblies.
1) Where reuse water is not immediately available and developer or contractor installs a temporary potable water connection between customers' potable water service and customers' irrigation system, double detector check valve backflow preventers will be required immediately downstream of the potable water connection.
2) A double detector check valve assembly shall be installed in all irrigation sprinkler service lines as close to the potable water service as is possible. The backflow prevention assembly shall be housed in the potable water meter vault.
3) Typically, a minimum of 12 inches below, 12 inches behind, 24 inches in front of and three inches above the highest point on the device or its shut off valves is required.
4) A minimum of six inches shall be provided between the pit walls and the outside edge of the devices' shut off valves.
5) The dimensions given above assume a standard "shallow" installation. If the depth exceeds 12 inches to the top of the device the other dimensions will need to be increased accordingly and be approved by the department.
11.4.9 Reuse water meters and service lines.
1) A reuse water service connection shall consist of a corporation tapped into the main; a service line to a curb stop inside a service box; a spool piece; a tee, valve, and -Cam-lock hose connection, and one inch backflow preventer inside the service box.
2) All service lines crossing under existing pavement shall be installed by boring. All service line taps shall be made with system pressure on the main and any visible leaks shall be repaired. After each meter service has been completed, the entire assembly shall be flushed to remove any foreign matter. All service lines shall have a minimum bury depth of 48 inches under ditches, shoulders, and roadways.
11.4.10 Polyethylene encasement.
1) Polyethylene encasement shall be installed to identify ductile iron pipe as reuse water piping. For this use, polyethylene encasement shall clearly identify reuse pipe by coloration with Pantone Purple 522C.
2) Polyethylene Encasement shall meet the requirements of AWWA C105 and shall be impregnated with color to match Pantone Purple 522C.
3) The words "REUSE WATER" shall be marked on the encasement at intervals of 12 inches in letters 11
/2 inches high.
4) Polyethylene encasement shall be installed in accordance with AWWA C-105.
11.4.11 Marking tape.
1) The department may allow marking tape to identify ductile iron pipe as reuse water pipe on a case-by-case basis. If allowed by the department, marking tape shall have an adhesive backing and shall be at least five mils in thickness, at least two inches in width, and made of an aluminum material sandwiched between two layers of polyethylene.
2) Marking tape shall be Pantone 522 C Purple in color.
3) Marking tape shall have the words "REUSE WATER" in white letters 11 /2 inches in
height at intervals of not more than 12 inches along tape.
4) Marking tape shall be applied continuously along the length of pipe and shall be wrapped around all underground ductile iron reuse water pipe such that at least four complete wraps are produced per 18-foot section of pipe unless other identification methods are specifically approved by the department prior to installation.
11.4.12 Locator wire.
1) A continuous or properly spliced Number 14 AWG THHN solid plastic coated copper wire shall be placed along all HDPE pipeline installations (AWWA C906 pipe or AWWA C901 tubing). Plastic coating shall be colored purple to indicate reuse water.
2) Care shall be taken during backfilling to prevent damaging or cutting of the locator wire.
3) All splices shall be made by using copper wire "U" bolt assemblies and then wrapping with electrical tape.
4) Wire shall be wrapped around pipe such that at least four "wraps" are produced per length of pipe.
5) In lieu of "wrapping", the tracer wire may be strung along the top of pipe provided it is taped to the pipe every five feet to ensure proper positioning during backfilling.
6) Locator wire shall be brought up to ground surface at all valve boxes and service connections. At service connections, a length of at least 12 inches of locator wire shall be coiled inside the meter vault. At valve boxes, a length of at least 12 inches of locator wire shall be coiled in a sealed opening at each valve pad. Locator wire from each side of valve shall terminate in the valve pad. Locator wires from each side of valve shall be bridged underground at the valve level to form a continuous conductor.
11.4.13 Valve markers.
1) Markers shall be installed with the top of the marker protruding 36 inches above the ground surface. Valve markers shall be located in a suitable location approved by the department's inspector during construction.
2) A marker shall be located within 20 feet or less from all in-line valves and/or taping valves. One marker may be used to reference the location of more than one valve provided the valves are within 20 feet of the marker. No marker is to be installed within three feet of direct line of operation of a fire hydrant. Valve marker shall be installed in ditch line being in direct line with reuse water main.
3) The brass disc shall be stamped with the distance between the valve(s) and marker.
The marker shall be installed such that the disc faces the valve.
11.4.14 Field pressure testing.
1) After the pipe has been installed, the complete pipeline shall be subjected to a hydrostatic pressure test.
2) Except as hereinafter allowed, the line shall be tested in sections not to exceed the distance from one line valve to the next adjacent line valve. Testing two sections through an open intermediate valve will not be allowed unless adjacent line valves are less than 300 feet apart. In no case will leakage from two or more adjacent sections be "averaged" to determine that the total section meets the leakage test. Each section of line or valved section of the line shall be tested as follows:
(a) At all high points, where air release valves or blow-off assemblies have not been installed, the contractor shall install corporation cocks to expel the air as the pipe is being slowly filled with water. After the pressure and disinfecting tests have been completed, the corporation cocks shall be capped with brass caps and left in place.
(b) A test pump shall be installed at the low point of the section being tested and the pipe shall be slowly filled with water.
(c) After expelling all air at the high point, the corporation cocks shall be closed and the pressure increased to the required pressure at the test pump location. The test pressure shall be maintained within five psi for the duration of the test.
(d) The volume of water required by the test pump to maintain this excess pressure, which will represent the leakage, shall not exceed 0.14 gallons per hour per inch diameter per 1,000 feet of pipe.
(e) Excess pressure and leakage test shall be successfully conducted for not less than two consecutive hours. Provide an accurate pressure gage with graduation not greater than five psi.
(f) The contractor shall, at his own expense, locate and make repairs as necessary until the leakage is within the specified allowance.
(g) All visible leaks shall be repaired regardless of the amount of leakage.
3) The contractor shall furnish all labor, equipment, and material necessary to conduct tests, and shall furnish and install all temporary plugs and valves necessary to isolate the test sections. Water for test purposes will be furnished by the department.
11.5 System identification and signage.
11.5.1 Piping and appurtenances.
1) All reuse water piping and appurtenances shall be clearly identified as reuse water facilities.
2) The standard color for reuse water facilities is Pantone Purple 522C. All piping, valves and appurtenances whether above or below ground shall be identified by approved painting or integral coloration.
(a) Ductile iron mains. Buried pipes shall be color coded along the entire length by bagging with polyethylene encasement meeting the requirements of AWWA C105 and shall be Pantone Purple 522C. If allowed by the department on a case-by-case basis, buried pipe may be color-coded with a purple spiral wrapped tape with adhesive backing. Adhesive tape shall be at least five mils in thickness, at least two inches in width, and made of an aluminum material sandwiched between two layers of polyethylene. Adhesive tape shall be marked with the words "REUSE WATER" in white letters 11
/2 inches in height at intervals of not more than 12 inches along tape. Above ground piping shall be painted Pantone Purple 522C with an approved two-part, epoxy paint.
(b) When allowed by the department, HDPE distribution mains shall be Pantone Purple 522C in color or shall have at least two stripes colored Pantone Purple 522C. Color shall be an integral part of the pipe materials.
(c) Copper service connections: Service connections shall be painted Pantone Purple 522C using an approved two part epoxy paint before encasement in polyethylene encasement meeting the requirements of AWWA C105 and colored Pantone Purple 522C.
(d) When allowed by the department, Polyethylene (PE) service pipe or tubing shall be specified purple or shall have a purple stripe and the words "REUSE WATER".
3) Valves installed below ground shall be identified with a stainless steel tag (minimum two-inch diameter) embossed with the words "REUSE WATER" and attached to the valve with stainless steel wire.
4) Covers for all valve boxes, manholes, meter vaults, service boxes, and other belowground structures on the reuse water system shall be painted Pantone Purple 522C with an approved two-part, epoxy paint and shall be permanently embossed with the words "REUSE WATER" and "DO NOT DRINK" together with the standard international symbol.
5) Electronically detectable tape shall be installed in the trench approximately 18 inches above all nonmetallic reuse water piping. Tape shall be a minimum of 4.5-mils in thickness, a minimum of two inches in width, and contain an aluminum core covered completely by purple polyethylene coating with the words "CAUTION REUSE WATER LINE BELOW" in white letters 11
/2 inches in height at intervals of not more than two feet along tape.
6) Continuous locater wire shall be installed on all nonmetallic, buried pipe. Locater wire shall be # 14 THHN with purple polyethylene coating and shall be wrapped around the pipe to make at least four complete wraps along each pipe joint (20 feet). Locating wires shall terminate at least four inches above each concrete valve pad and shall be folded back inside a three inch diameter PVC access pipe. Locating wires shall run continuous through each personnel access vault or manhole and shall terminate with at least two feet of excess wire in each service box.
11.5.2 Signage.
1) The public shall be notified of the use of reuse water by posting advisory signs designating the nature of the reuse project area where reuse is practiced.
2) Signage shall be placed, as appropriate, at entrances to residential neighborhoods where reuse water is used for landscape irrigation and at prominent locations at all commercial sites, including multi-family residential, office parks, schools, churches, condominiums, residential common areas, recreational developments, and golf courses.
A notification method for golf courses, for example would be to post advisory signs at the entrance to a golf course and at the first and tenth tees as well as notes on scorecards.
3) Advisory signs shall be color-coded Pantone Purple 522C and include the following text
"LANDSCAPE IRRIGATION AND HOSE CONNECTIONS USE", "REUSE WATER",
and "DO NOT DRINK" together with the equivalent standard international symbol.
4) Advisory signs shall be posted adjacent to lakes or ponds used to store reuse water and at decorative water features that use reuse water. Advisory signs shall include the following text "REUSE WATER", and "DO NOT DRINK" together with the equivalent standard international symbol.
5) Advisory signs shall be posted adjacent to each hose valve or hose connection which is connected to reuse water system. Advisory signs shall include the following text "REUSE WATER", and "DO NOT DRINK" together with the equivalent standard international symbol.
11.6 Site preparation, restoration and related work.
11.6.1 Scope of work.
1) This section covers all work required to prepare the site for pipeline construction as well as site restoration. Also, included in this section is miscellaneous work required to complete the overall project.
2) This work includes but is not limited to pavement and sidewalk removal and replacement, erosion and sedimentation control, curb and gutter removal and replacement, grassing and refuse removal.
11.6.2 Project photographs.
1) The contractor shall provide project photographs. Before beginning the work photographs shall be taken of all areas to be disturbed by the contractor's operation. Said photographs shall be submitted to the department for approval prior to the commencement of any work.
2) The contractor shall video the project prior to construction, during construction and at completion said video will be furnished to the department.
11.6.3 Materials.
1) Materials to be incorporated into the work shall be new and unused, and shall conform to all applicable requirements of these specifications. Any materials installed prior to approval by the department will be subject to rejection, and will be removed at the contractor's expense.
2) Asphaltic materials — Asphaltic coverage and related bituminous materials for roadway construction shall conform to the requirements of Georgia Department of Transportation Standard Specifications for the Construction of Roads and Bridges, latest Edition.
(a) Asphaltic concrete shall be Type F. Type E will not be accepted.
(b) Concrete and reinforcement for concrete pavement shall conform to the requirements for the Georgia Department of Transportation Standard Specifications.
3) Grassing and erosion control materials — Grassing and erosion control materials shall conform to the requirements outlined by the Georgia Department of Transportation Standard Specifications, latest edition and the Manual for Erosion and Sediment Control in Georgia.
4) Rip rap - Stone rip rap shall be sound, tough, durable stones resistant to the action of air and water. Slabby or shaley pieces will not be acceptable. Specific gravity shall be
2.0 or higher. Rip rap shall have less than 66 percent wear and tested in accordance with AASHTO T-96. Unless shown or specified otherwise, stone rip rap shall be Type 1 rip-rap.
Type 1 rip rap: the largest pieces shall have a maximum volume of one cubic foot. At least 35 percent of the mass shall be comprised of pieces that weigh 100 pounds or more. The remainder shall be well graded down to the finest sizes. Rock fines shall comprise a maximum of ten percent of the total mass. Rock fines are defined as material passing a No. 4 sieve. Rip rap size shall conform to Georgia Department of Transportation Section 805.01 stone dumped rip rap, Type 1.
11.6.4 Clearing and grubbing.
1) The location of the work shall be cleared of all trees, growth, debris, stumps and other objectionable matter before trenching. Special care shall be taken not to damage any adjacent or nearby shrubbery, trees, grass, fences, walks, utility lines, drainage structure, paving or other property. The contractor shall be responsible for such damage and shall replace all such property damaged with equally new property, all to the satisfaction of the property owner.
2) Removal of trees and permanent structures along or in the trench space shall be done by the contractor, but only as directed. All construction activity shall be confined to the limits of the easement, right-of-way or public right-of-way unless the contractor obtains legal rights to use adjacent property from the private owners concerned.
3) The contractor shall clear all permanent Paulding County Water System right-of-way and remove obstructions along the pipeline for a sufficient area to provide adequate and safe work space. All debris shall be removed and disposed of by the contractor.
Where the tree limbs interfere with utility wires, or where the trees to be felled are in close proximity to utility wires, the tree shall be taken down in sections to eliminate the possibility of damage to the utility.
4) All fences adjoining any excavation or embankment that may be damaged or buried shall be carefully removed, stored, and replaced.
5) All stumps, roots, foundations and planking embedded in the ground shall be removed.
Piling and butts of utility poles shall be removed to a minimum depth of two feet below the limits of excavation.
6) Do not cut trees for the performance of the work except as allowed above and as absolutely necessary. Protect trees that remain in the vicinity of the work from damage from equipment. Do not store spoil from excavation against the trunks.
11.6.5 Temporary erosion and sedimentation.
1) Temporary erosion and sedimentation controls shall meet the requirements of the Georgia Erosion and Sedimentation Act of 1975 (as amended) and local soil erosion and sedimentation control ordinances.
2) The contractor shall acquire land disturbance permits from the community development department or other appropriate governing authority, and shall pay any fees for said permits. The contractor shall be responsible for submitting to the county sufficient documents such that the county can acquire approval from the soil and water conservation district. All fines imposed for improper erosion and sedimentation control shall be paid by the contractor.
3) Description and working drawings shall indicate controls which will ensure that drainage from job site areas which will be denuded, stripped or modified of its natural existing or artificially established stabilization or protection against erosion shall pass through some type of filter system before being discharged. These areas shall be kept sufficiently moist to control dust.
4) Silt dams, traps, barriers, and appurtenances shall be installed, and shall be maintained in-place until no longer needed, and then removed. Hay bales that deteriorate, and filter stone which become dislodged shall be replaced with new materials. Detention ponds, if constructed, shall be maintained in a condition that will ensure that unfiltered water will not leave the pond.
5) Materials used in temporary erosion and sedimentation control shall meet the following requirements:
(a) Silt fence shall meet the requirements of Section 171 - Temporary Silt Fence of the Department of Transportation, State of Georgia, Standard Specification, latest edition. Silt fence fabric must be on the Georgia Department of Transportation Qualified Product List.
(b) Hay bales shall be clean, seed-free cereal hay type.
(c) Netting shall be 1 /2-inch, galvanized steel, chicken wire mesh.
(d) Filter stone shall be crushed stone conforming to Georgia Department of Transportation Table 800.01H, Size Number 3.
11.6.6 Construction along state highways, county roads and city streets.
1) All storage of materials, excavation, backfilling, pavement removal and replacement, clean up and grassing shall be in strict accordance with the applicable state and county regulations. It shall be the contractor's responsibility to determine the exact requirements of the authority having jurisdictions over the right-of-way. No highway, road or street shall be closed to traffic without authorization from the proper authority. The contractor shall provide suitable lights, signs, barricades, and flagmen to insure the safety of pedestrian and vehicle traffic and workmen and to protect the work.
2) The contractor shall coordinate the closing of any street with the county department of transportation at 770-445-4759.
3) The contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights and other traffic control devices; shall provide qualified flagmen where necessary to direct traffic; shall take all necessary precautions for the protection of the work and the safety of the public.
4) Construction traffic control devices and their installation shall be in accordance with the current Georgia Manual of Uniform Traffic Control Devices for Streets and Highways.
5) Placement and removal of construction traffic control devices shall be coordinated with the Paulding County Department of Transportation and/or the water and sewer system department a minimum of 48 hours in advance.
6) Placement of construction traffic control devices shall be scheduled ahead of associated construction activities. Construction time in street right-of-way shall be conducted to minimize the length of time traffic is disrupted.
7) Construction traffic control devices shall be removed immediately following their useful purpose. Traffic control devices used intermittently, such as "flagmen ahead", shall be removed and replaced when needed.
8) When working within county or state highway right-of-ways, provide trained and certified flag people who have completed a training program approved by the Georgia Department of Transportation.
9) Existing permanent traffic control devices within the construction work zone shall be protected from damage due to construction operations. All damaged traffic control devices requiring temporary relocation due to construction shall be located as near as possible to their original position. Their original position shall be measured from permanent reference points and recorded in a permanent log prior to relocation.
Temporary locations shall provide the same visibility to affected traffic as the original position. Relocated permanent traffic control devices shall be reinstalled in their original positions as soon as practical following construction in the affected location.
Construction traffic control devices shall be maintained in good repair, clean and visible to affected traffic for daytime and nighttime operation. Traffic control devices affected by the construction work zone shall be inspected daily.
10) Construction warning signs shall be black legend on an orange background. Regulatory signs shall be black legend on a white background. Construction sign panels shall meet the minimum reflective requirements of the Paulding County Department of Transportation. Sign panels shall be of durable materials capable of maintaining their color, reflective character and legibility during the period of construction.
11.6.7 Removing and replacing pavement.
1) Remove existing pavement as necessary for installing the pipeline and appurtenances.
(a) The contractor shall replace with like materials at his expense all pavements, walks, and driveways removed or damaged in connection with the work. Pavement repairs shall be smooth and unnoticeable and of the same elevation as the existing paving. In the removal of pavement, the contractor shall salvage all sound and undamaged materials and store them at a convenient location for reuse in pavement replacements. Any additional new rock concrete, asphalt or other replacement materials shall in all cases conform to the county's specifications.
(b) Before removing any pavement, mark the pavement neatly paralleling pipelines and existing street lines. Space the marks the width of the trench.
(c) Saw cut asphalt pavement along the marks using a rotary saw or other suitable tool. Break concrete pavement along the marks by scoring with a rotary saw and breaking below the score by the use of jackhammers or other suitable tools.
(d) Do not pull pavement with machines until completely broken and separated from pavement to remain.
(e) Do not disturb or damage the adjacent pavement. If the adjacent pavement is disturbed or damaged, remove and replace the damaged pavement. No additional payment will be made for removing and replacing damaged adjacent pavement.
(f) Remove and replace sidewalks disturbed by construction for their full width and to the nearest undisturbed joint.
(g) Remove and replace or tunnel under any curb disturbed by construction to the nearest undisturbed joint.
2) Upon completion of backfilling and consolidation of the backfill, arrange to have the compaction tested by an independent testing laboratory approved by the department.
After compaction testing has been satisfactorily completed, replace all pavements, sidewalks and curbs removed. Gravel roads and drives shall meet the requirements for graded aggregate sub-base.
(a) Pavement restoration shall meet the requirements of the regulatory agency responsible for the pavement. Obtain agency approval of pavement restorations before requesting final payment.
(b) Obtain the department's approval of restoration of pavement not the responsibility of a regulatory agency such as private roads and drives.
(c) Complete pavement restoration as soon as possible after backfilling.
(d) Prior to replacing pavement, make a final cut in the pavement 12 inches back from the edge of the previous cut line. Make the cut using a rotary saw. Remove pavement and base material to a depth of ten inches below finished grade.
Construct an eight inch thick concrete (3,000 psi) bridge the full width of the pavement cut (ie... trench width plus 24 inches). Apply tack coat and two inches of Type F asphalt when concrete has cured.
(e) Replace all street roadway pavement, driveways, sidewalks, and curbs with the same material and to the same dimensions as existing.
(f) Should any pavement restoration or repairs fail or settle during the life of the contract, including the bonded period, promptly restore or repair defects.
3) Concrete pavement removal and replacement shall conform to the applicable sections of the Georgia Department of Transportation Standard Specifications for the Construction of Roads and Bridges, latest edition.
11.6.8 Railroad crossings. Railroad crossings shall be made in accordance with all requirements of the affected railroad. It will be the contractor's responsibility to obtain all requirements from the railroads and furnish all labor and materials required to fulfill such requirements. The contractor shall furnish and install the casing under the tracks with whatever material and with whatever methods and under whatever regulations are required by the railroads.
11.6.9 Stream and ditch crossing.
1) At all points where banks of streams or drainage ditches are disturbed by excavation or where natural vegetation is removed, carefully compact backfill and place rip rap to prevent subsequent settlement and erosion.
2) Place rip rap a distance of not less than ten feet upstream and downstream or ten feet each side of the stream in any disturbed area. Extend rip rap from one foot below stream bed to top of bank. Place to conform with the natural slope of the stream bank.
3) The requirements of this section apply equally to construction along side a stream or drainage ditch as well as crossing a stream or drainage ditch.
4) Embed stone rip rap by hand so as to form a compact layer at least 12 inches thick.
Place rip rap in such a way that the smaller stones are not segregated but evenly distributed. Place stones in the crevices between the larger stones so that a dense, well-graded mass is produced.
11.6.10 Cleaning and maintenance.
1) The contractor shall remove all surplus material, tools, and temporary structures. The site of construction shall be left clean, to the satisfaction of the department.
2) After the work is accepted as a whole, the contractor shall maintain the surface of the unpaved trenches, adjacent curbs, sidewalks, gutters, shoulders, street paving, shrubbery, fences, sod, grass and other disturbed surfaces for a period of 90 days thereafter.
3) Should any trenches in or outside paved areas settle below grade, they shall be promptly built back by the contractor, who shall furnish select backfill material for this purpose.
4) The contractor shall furnish all material and labor required for such maintenance and/or repairs and the work shall be done in a manner satisfactory to the department.
5) The contractor shall be responsible for a period of one year for faulty workmanship and materials.
11.6.11 Grassing.
1) The contractor shall furnish all materials for and properly restore to the satisfaction of the department, all ground surfaces irrespective of the type, which may be disturbed in the progress of the work.
2) This work shall include in general but without limitation, the spreading of topsoil, seeding, fertilizing and mulching required to restore disturbed areas as necessary for the proper completion of the work as may be required, directed or as specified herein.
On all "sod" type lawns and other improved, well-established grass areas, the sod/grass shall be carefully removed, kept alive and replaced after the backfilling is finished. The contractor shall also remove all spoil from such areas as quickly as possible after the excavation is backfilled, and he shall leave the premises in as good of condition as before undertaking the work. It is the intent of these regulations to place seed over all disturbed areas, to place topsoil and seed where established lawn areas existed prior to construction, and to provide for sod removal/replacement.
3) The requirements of the Georgia Department of Transportation "Standard Specifications for the Construction of Roads and Bridges," latest edition, shall apply insofar as they are applicable.
4) When directed, areas to be seeded shall be covered with a layer of topsoil where topsoil has been disturbed by the pipe laying operation. The topsoil shall be of sufficient thickness that when spread and compacted, a minimum of four inches will be available. Furnish natural topsoil of a good condition and tillable structure. Obtain topsoil as borrow from an outside source and from piles of uniform texture, drainage, and other characteristics so as to constitute a homogeneous mixture approved by the department. No existing materials may be re-used in this work unless approved.
Furnish topsoil free from objectionable materials such as hard clods, stiff clay, sods, hardpan, partially disintegrated stone, or other materials that are not integrally a natural component of good agricultural soils and which are harmful to or unnecessary for successful plant growth.
5) Seeding shall be performed using a properly proportioned mixture of inoculated seed as shown on the sediment and erosion plans.
6) Replace existing grassed areas with grass of similar characteristics and appearance meeting as a minimum the requirements of these regulations.
7) The subgrade for the areas to be seeded shall be brought to a uniform grade, free of stones larger than one inch. Where topsoil is required, the topsoil shall be uniformly graded, trimmed and raked free from unsuitable material, ridges, bumps or depressions. Over this area, spread agricultural lime at the rate of 40 pounds per 1,000 square feet, and spread fertilizer uniformly on the surface of the ground at the rate of 1,500 pounds per acre. Mix the lime and fertilizer uniformly into the top four inches of the soil by suitable harrows, rotary tillers or other approved equipment.
8) On all well established and "sod" type lawns, the sod/grass shall be cut into rolls, carefully removed, kept watered and alive and replaced after backfilling has been properly completed.
9) The contractor shall be responsible for maintaining all seeded areas including mowing, watering and reseeding defective areas until a satisfactory stand of grass is accomplished and final acceptance of the work by the department is obtained. Areas showing evidence of settlement or loss of topsoil shall be rebuilt and reseeded as required.
11.6.12 Temporary toilet accommodations. If deemed necessary by the department, temporary toilet facilities shall be set up to meet all county and state regulations.
ARTICLE 12 STREAM BUFFER PROTECTION ORDINANCE
12.1 Title.
This ordinance shall be known as the article 12 of the Paulding County Development Regulations entitled Stream Buffer Protection Ordinance.
12.2 Findings and purposes.
12.2.1 Findings. Whereas, the Board of Commissioners of Paulding County finds that buffers adjacent to streams provide numerous benefits including:
1) Protecting, restoring and maintaining the chemical, physical and biological integrity of streams and their water resources
2) Removing pollutants delivered in urban stormwater
3) Reducing erosion and controlling sedimentation
4) Protecting and stabilizing stream banks
5) Providing for infiltration of stormwater runoff
6) Maintaining base flow of streams
7) Contributing organic matter that is a source of food and energy for the aquatic ecosystem
8) Providing tree canopy to shade streams and promote desirable aquatic habitat
9) Providing riparian wildlife habitat
10) Furnishing scenic value and recreational opportunity
11) Providing opportunities for the protection and restoration of greenspace
12.2.2 Purposes. It is the purpose of this ordinance is to protect the public health, safety, environment and general welfare; to minimize public and private losses due to erosion, siltation and water pollution; and to maintain stream water quality by provisions designed to:
1) Create buffer zones along the streams of Paulding County for the protection of water resources; and,
2) Minimize land development within such buffers by establishing buffer zone requirements and by requiring authorization for any such activities.
12.3 Definitions.
Board of commissioners means the Paulding County Board of Commissioners.
Buffer means, with respect to a stream, a natural or enhanced vegetated area (established by section 5.1.1 below), lying adjacent to the stream.
Impervious cover means any manmade paved, hardened or structural surface regardless of material. Impervious cover includes but is not limited to rooftops, buildings, streets, roads, decks, swimming pools and any concrete or asphalt.
Land development means any land change, including but not limited to clearing, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving and any other installation of impervious cover.
Land development activity means those actions or activities which comprise, facilitate or result in land development.
Land disturbance means any land or vegetation change, including, but not limited to, clearing, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, that do not involve construction, paving or any other installation of impervious cover.
Land disturbance activity means those actions or activities which comprise, facilitate or result in land disturbance.
Floodplain means any land area susceptible to flooding, which would have at least a one percent probability of flooding occurrence in any calendar year based on the basin being fully developed as shown on the current land use plan; i.e., the regulatory flood.
Parcel means any plot, lot or acreage shown as a unit on the latest county tax assessment records.
Permit means the permit issued by Paulding County required for undertaking any land development activity.
Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.
Protection area, or stream protection area means, with respect to a stream, the combined areas of all required buffers and setbacks applicable to such stream.
Riparian means belonging or related to the bank of a river, stream, lake, pond or impoundment.
Setback means, with respect to a stream, the area established by section 5.1.2 extending beyond any buffer applicable to the stream.
Stream means any stream, beginning at:
1. The location of a spring, seep, or groundwater outflow that sustains streamflow; or
2. A point in the stream channel with a drainage area of 25 acres or more; or
3. Where evidence indicates the presence of a stream in a drainage area of other than 25 acres, Paulding County may require field studies to verify the existence of a stream.
Stream bank means the sloping land that contains the stream channel and the normal flows of the stream.
Stream channel means the portion of a watercourse that contains the base flow of the stream.
Watershed means the land area that drains into a particular stream.
12.4 Applicability.
This ordinance shall apply to all land development activity on property containing a stream protection area as defined in section 3 of this ordinance. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under state law and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under state law or from other applicable local, state or federal regulations.
12.4.1 Grandfather provisions. This ordinance shall not apply to the following activities:
1) Work consisting of the repair or maintenance of any lawful use of land that is zoned and approved for such use on or before the effective date of this ordinance.
2) Existing development and on-going land disturbance activities including but not limited to existing agriculture, silviculture, landscaping, gardening and lawn maintenance, except that new development or land disturbance activities on such properties will be subject to all applicable buffer requirements.
3) Any land development activity that is under construction, fully approved for development, scheduled for permit approval or has been submitted for approval as of the effective date of this ordinance.
4) Land development activity that has not been submitted for approval, but that is part of a larger master development plan, such as for an office park or other phased development that has been previously approved within two years of the effective date of this ordinance.
12.4.2 Exemptions. The following specific activities are exempt from this ordinance.
Exemption of these activities does not constitute an exemption for any other activity proposed on a property.
1) Activities for the purpose of building one of the following:
(a) A stream crossing by a driveway, transportation route or utility line;
(b) Public water supply intake or public wastewater outfall structures;
(c) Intrusions necessary to provide access to a property;
(d) Public access facilities that must be on the water including boat ramps, docks, foot trails leading directly to the river, fishing platforms and overlooks;
(e) Unpaved foot trails and paths;
(f) Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used.
2) Public sewer line easements paralleling the creek, except that all easements (permanent and construction) and land disturbance should be at least 25 feet from the top of the bank. This includes such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited herein
3) Land development activities within a right-of-way existing at the time this ordinance takes effect or approved under the terms of this ordinance.
4) Within an easement of any utility existing at the time this ordinance takes effect or approved under the terms of this ordinance, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures.
5) Emergency work necessary to preserve life or property. However, when emergency work is performed under this section, the person performing it shall report such work to the (review and permitting authority) on the next business day after commencement of the work. Within ten days thereafter, the person shall apply for a permit and perform such work within such time period as may be determined by the (review and permitting authority) to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area.
6) Forestry and silviculture activities on land that is zoned for forestry, silvicultural or agricultural uses and are not incidental to other land development activity. If such activity results in land disturbance in the buffer that would otherwise be prohibited, then no other land disturbing activity other than normal forest management practices will be allowed on the entire property for three years after the end of the activities that intruded on the buffer.
12.4.3 Effective date. After the effective date of this ordinance, March 22, 2005, it shall apply to new subdividing and platting activities.
Any land development activity within a buffer established hereunder or any impervious cover within a setback established hereunder is prohibited unless a variance is granted pursuant to section 12.5 below.
12.5 Land development requirements.
12.5.1 Buffer and setback requirements. All land development activity subject to this ordinance shall meet the following requirements:
1) An undisturbed natural vegetative buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank.
2) An additional setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed natural vegetative buffer, in which all impervious cover shall be prohibited. Grading, filling and earthmoving shall be minimized within the setback.
3) No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback.
12.5.2 Variance procedures. Variances from the above buffer and setback requirements may be granted in accordance with the following provisions:
1) Where a parcel was platted prior to the effective date of this ordinance, and its shape, topography or other existing physical condition prevents land development consistent with this ordinance, and the Paulding County Water and Sewer System Department and Paulding County Community Development Department finds and determines that the requirements of this ordinance prohibit the otherwise lawful use of the property by the owner, the request for a variance may be forwarded to the Paulding County Development Waiver Review Committee for a hearing.
The Paulding County Development Waiver Review Committee shall hold a hearing on the variance request within 30 days of the date of the variance request or at its next regularly scheduled meeting in accordance with the procedures set forth in the administration article of the development regulations. In the event the Paulding County Development Waiver Review Committee determines that the criteria contained herein are met, the Paulding County Development Waiver Review Committee may grant a variance from the buffer and setback requirements hereunder, provided such variance require mitigation measures to offset the effects of any proposed land development on the parcel. In the event the party requesting the variance is aggrieved by the decision of the Paulding County Development Waiver Review Committee, the variance request may be appealed to the Paulding County Board of Commissioners for consideration. All such appeals of variance requests must be made in writing with a copy provided to the Paulding County Board of Commissioners and the Paulding County Community Development Department and must be submitted within 30 days of the decision by the Paulding County Development Waiver Review Committee.
Thereafter, the Paulding County Board of Commissioners shall consider the appeal at a public meeting within 30 days or at its next regularly scheduled meeting. The Paulding County Board of Commissioners may grant a variance from the buffer and setback requirements hereunder, provided such variance require mitigation measures to offset the effects of any proposed land development on the parcel.
2) Except as provided above, the Paulding County Development Waiver Review Committee and/or the board of commissioners shall grant no variance from any provision of this ordinance without first conducting a public hearing on the application for variance and authorizing the granting of the variance by an affirmative vote of the Paulding County Board of Commissioners. Paulding County shall give public notice of each such public hearing in a newspaper of general circulation within Paulding County. Paulding County shall require that the applicant post a sign giving notice of the proposed variance and the public hearing. The sign shall be of a size and posted in such a location on the property as to be clearly visible from the primary adjacent road right-of-way.
Variances will be considered only in the following cases:
(a) When a property's shape, topography or other physical conditions existing at the time of the adoption of this ordinance prevents land development unless a buffer variance is granted.
(b) Unusual circumstances when strict adherence to the minimal buffer requirements in the ordinance would create an extreme hardship.
Variances will not be considered when, following adoption of this ordinance, actions of any property owner of a given property have created conditions of a hardship on that property.
3) At a minimum, a variance request shall include the following information:
(a) A site map that includes locations of all streams, wetlands, floodplain boundaries and other natural features, as determined by field survey;
(b) A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;
(c) A detailed site plan that shows the locations of all existing and proposed structures and other impervious cover, the limits of all existing and proposed land disturbance, both inside and outside the buffer and setback. The exact area of the buffer to be affected shall be accurately and clearly indicated;
(d) Documentation of unusual hardship should the buffer be maintained;
(e) At least one alternative plan, which does not include a buffer or setback intrusion, or an explanation of why such a site plan is not possible;
(f) A calculation of the total area and length of the proposed intrusion;
(g) A stormwater management site plan, if applicable; and,
(h) Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed.
4) The following factors will be considered in determining whether to issue a variance:
(a) The shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;
(b) The locations of all streams on the property, including along property boundaries;
(c) The location and extent of the proposed buffer or setback intrusion; and,
(d) Whether alternative designs are possible which require less intrusion or no intrusion;
(e) The long-term and construction water-quality impacts of the proposed variance;
(f) Whether issuance of the variance is at least as protective of natural resources and the environment.
12.6 Compatibility with other buffer regulations and requirements.
This ordinance is not intended to interfere with, abrogate or annul any other ordinance, rule or regulation, statute or other provision of law. Provided however, in the event that stream bank buffer requirements exist in other county ordinances, including the Paulding County Zoning Ordinance and other Articles of the Paulding County Development Regulations, that are less restrictive than the measurements and standards contained herein, the terms of this article shall control.
The requirements of this ordinance should be considered minimum requirements, and where any provision of this ordinance imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provisions are more restrictive or impose higher protective standards for human health or the environment shall be considered to take precedence.
12.7 Additional information requirements for development on buffer zone properties.
Any permit applications for property requiring buffers and setbacks hereunder must include the following:
1) A site plan showing:
(a) The location of all streams on the property;
(b) Limits of required stream buffers and setbacks on the property;
(c) Buffer zone topography with contour lines at no greater than five-foot contour intervals;
(d) Delineation of forested and open areas in the buffer zone; and,
(e) Detailed plans of all proposed land development in the buffer and of all proposed impervious cover within the setback;
2) A description of all proposed land development within the buffer and setback; and,
3) Any other documentation that the (review and permitting authority) may reasonably deem necessary for review of the application and to insure that the buffer zone ordinance is addressed in the approval process.
All buffer and setback areas must be recorded on the final plat of the property following plan approval.
12.8 Responsibility.
Neither the issuance of a development permit nor compliance with the conditions thereof, nor with the provisions of this ordinance shall relieve any person from any responsibility otherwise imposed by law for damage to persons or property; nor shall the issuance of any permit hereunder serve to impose any liability upon Paulding County, its officers or employees, for injury or damage to persons or property.
12.9 Inspection.
Paulding County may cause inspections of the work in the buffer or setback to be made periodically during the course thereof and shall make a final inspection following completion of the work. The permittee shall assist the Paulding County representatives in making such inspections. Paulding County shall have the authority to conduct such investigations as it may reasonably deem necessary to carry out its duties as prescribed in this ordinance, and for this purpose to enter at reasonable time upon any property, public or private, for the purpose of investigating and inspecting the sites of any land development activities within the protection area.
No person shall refuse entry or access to any authorized representative or agent who requests entry for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out official duties.
12.10 Violations, enforcement and penalties.
Any action or inaction which violates the provisions of this ordinance or the requirements of an approved site plan or permit may be subject to the enforcement actions outlined in this section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.
12.10.1 Notice of violation. If Paulding County, by and through its community development department, determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved site plan or the provisions of this ordinance, it shall issue a written notice of violation to such applicant or other responsible person. Where a person is engaged in activity covered by this ordinance without having first secured the appropriate permit therefore, the notice of violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site.
1) The notice of violation shall contain:
(a) The name and address of the owner or the applicant or the responsible person;
(b) The address or other description of the site upon which the violation is occurring;
(c) A statement specifying the nature of the violation;
(d) A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the approved site plan or this ordinance and the date for the completion of such remedial action;
(e) A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed; and,
(f) A statement that the determination of violation may be appealed to the Paulding County Board of Commissioners by filing a written notice of appeal within 30 days after the notice of violation (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient).
12.10.2 Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, Paulding County, by and through its community development department, shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable opportunity, of not less than ten days (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) to cure such violation. In the event the applicant or other responsible person fails to cure such violation after such notice and cure period, Paulding County may take any one or more of the following actions or impose any one or more of the following penalties.
1) Stop work order—Paulding County may issue a stop work order which shall be served on the applicant or other responsible person. The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take necessary remedial measures to cure such violation or violations.
2) Withhold certificate of occupancy—Paulding County may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein.
3) Suspension, revocation or modification of permit—Paulding County may suspend, revoke or modify the permit authorizing the land development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated (upon such conditions as Paulding County may deem necessary) to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations.
4) Civil penalties—In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days (or such greater period as the Paulding County Community Development Department shall deem appropriate) (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) after the Paulding County Community Development Department has taken one or more of the actions described above, Paulding County may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation.
5) Criminal penalties—For intentional and flagrant violations of this ordinance, Paulding County may issue a citation to the applicant or other responsible person, requiring such person to appear Magistrate Court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days or some combination thereof. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
12.11 Administrative appeal and judicial review.
12.11.1 Administrative appeal. Any person aggrieved by a decision or order of the Paulding County Community Development Department or other Paulding County professional staff, may appeal in writing within 30 days after the issuance of such decision or order to the Paulding County Development Waiver Review Committee in accordance with the Administration article of the development regulations. The party appealing such decision shall be entitled to a hearing before the Paulding County Development Waiver Review Committee, as set forth in the administration article of the development regulations, within 30 days of receipt of the written appeal or at the next regularly scheduled meeting of the development waiver review committee.
Any party aggrieved by a decision of the Paulding County Development Waiver Review Committee Paulding County Board of Commissioners and shall be entitled to a hearing before the Paulding County Board of Commissioners within 30 days of receipt of the written appeal or at the next regularly scheduled Paulding County Board of Commissioners meeting.
12.11.2 Judicial review. Any person aggrieved by a decision or order of the Paulding County Board of Commissioners after exhausting all administrative remedies, shall have the right to appeal by filing a petition for review in accordance with O.C.G.A. § 5-3-1 et seq.
(Ord. No. 23-10, § 1 (Exh. A), 9-12-2023, eff. 7-1-2023)
12.12 Severability.
If any article, section, subsection, paragraph, clause, phrase or provision of this ordinance shall be adjudged invalid or held unconstitutional, such decision shall not affect or invalidate the remaining portions of this ordinance.
ARTICLE 13 POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW
DEVELOPMENT AND REDEVELOPMENT
13.1 Introduction.
It is hereby determined that:
Land development projects and other land use conversions, and their associated changes to land cover, permanently alter the hydrologic response of local watersheds and increase stormwater runoff rates and volumes, which in turn increase flooding, stream channel erosion, and sediment transport and deposition;
Land development projects and other land use conversions also contribute to increased nonpoint source pollution and degradation of receiving waters;
The impacts of post-development stormwater runoff quantity and quality can adversely affect public safety, public and private property, drinking water supplies, recreation, fish and other aquatic life, property values and other uses of lands and waters;
These adverse impacts can be controlled and minimized through the regulation of stormwater runoff quantity and quality from new development and redevelopment, by the use of both structural facilities as well as nonstructural measures, such as the conservation of open space and greenspace areas. The preservation and protection of natural area and greenspace for stormwater management benefits is encouraged through the use of incentives or "credits." The Georgia Greenspace Program provides a mechanism for the preservation and coordination of those greenspace areas which provide stormwater management quality and quantity benefits;
Localities in the State of Georgia are required to comply with a number of both state and federal laws, regulations and permits which require a locality to address the impacts of post-development stormwater runoff quality and nonpoint source pollution;
Therefore, Paulding County has established this set of stormwater management policies to provide reasonable guidance for the regulation of post-development stormwater runoff for the purpose of protecting local water resources from degradation. It has determined that it is in the public interest to regulate post-development stormwater runoff discharges in order to control and minimize increases in stormwater runoff rates and volumes, post-construction soil erosion and sedimentation, stream channel erosion, and nonpoint source pollution associated with post-development stormwater runoff.
13.2 General provisions.
13.2.1 Purpose and intent. The purpose of this ordinance is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-development stormwater runoff and nonpoint source pollution associated with new development and redevelopment. It has been determined that proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water and aquatic resources. This ordinance seeks to meet that purpose through the following objectives:
1) Establish decision-making processes surrounding land development activities that protect the integrity of the watershed and preserve the health of water resources;
2) Require that new development and redevelopment maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, streambank erosion, nonpoint source pollution and increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats;
3) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality;
4) Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum post-development stormwater management standards;
5) Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of greenspace and other conservation areas, to the maximum extent practicable. Coordinate site design plans, which include greenspace, with the county's greenspace protection plan;
6) Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety; and,
7) Establish administrative procedures for the submission, review, approval and disapproval of stormwater management plans, and for the inspection of approved active projects, and long-term follow up.
13.2.2 Applicability.
1) This ordinance shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, and grading applications, unless exempt pursuant to subsection 2) below. These standards apply to any new development or redevelopment site that meets one or more of the following criteria:
(a) New development that involves the creation of 5,000 square feet or more of impervious cover, or that involves other land development activities of one acre or more;
(b) Redevelopment that includes the creation, addition or replacement of 5,000 square feet or more of impervious cover, or that involves other land development activity of one acre or more;
(c) Any new development or redevelopment, regardless of size, that is defined by the Paulding County Community Development Director to be a hotspot land use; or,
(d) Land development activities that are smaller than the minimum applicability criteria set forth in items (a) and (b) above if such activities are part of a larger common plan of development, even though multiple, separate and distinct land development activities may take place at different times on different schedules.
2) The following activities are exempt from this ordinance:
(a) Individual single-family or duplex residential lots that are not part of a subdivision or phased development project;
(b) Additions or modifications to existing single-family or duplex residential structures;
(c) Agricultural or silvicultural land management activities within areas zoned for these activities; and,
(d) Repairs to any stormwater management facility or practice deemed necessary by the Paulding County Water and Sewer System Department or the Paulding County Community Development Department.
13.2.3 Designation of ordinance administrator. The Paulding County Community Development Department and its director is hereby appointed to administer and implement the provisions of this ordinance.
13.2.4 Compatibility with other regulations. This ordinance is not intended to modify or repeal any other ordinance, rule, regulation or other provision of law. The requirements of this ordinance are in addition to the requirements of any other ordinance, rule, regulation or other provision of law, and where any provision of this ordinance imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.
13.2.5 Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this ordinance shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this ordinance.
13.2.6 Stormwater design manual. The Paulding County Community Development Department will utilize the policy, criteria and information including technical specifications and standards in the latest edition of the Georgia Stormwater Management Manual and any relevant local addenda, for the proper implementation of the requirements of this ordinance.
The manual may be updated and expanded periodically, based on improvements in science, engineering, monitoring and local maintenance experience.
13.3 Definitions.
Applicant means a person submitting a post-development stormwater management application and plan for approval.
Channel means a natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.
Conservation easement means an agreement between a land owner and Paulding County or other government agency or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership.
Detention means the temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling the peak discharge.
Detention facility means a detention basin or structure designed for the detention of stormwater runoff and gradual release of stored water at controlled rates.
Developer means a person who undertakes land development activities.
Development means a land development or land development project.
Drainage easement means an easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement.
Erosion and sedimentation control plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.
Extended detention means the detention of stormwater runoff for an extended period, typically 24 hours or greater.
Extreme flood protection means measures taken to prevent adverse impacts from large low-frequency storm events with a return frequency of 100 years or more.
Flooding means a volume of surface water that is too great to be confined within the banks or walls of a conveyance or stream channel and that overflows onto adjacent lands.
Greenspace or open space means permanently protected areas of the site that are preserved in a natural state.
Hotspot means an area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater.
Hydrologic soil group (HSG) means a Natural Resource Conservation Service classification system in which soils are categorized into four runoff potential groups. The groups range from Group A soils, with high permeability and little runoff produced, to Group D soils, which have low permeability rates and produce much more runoff.
Impervious cover means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, and any concrete or asphalt surface.
Industrial stormwater permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.
Infiltration means the process of percolating stormwater runoff into the subsoil.
Jurisdictional wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation.
Land development means any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover.
Land development activities means those actions or activities which comprise, facilitate or result in land development.
Land development project means a discrete land development undertaking.
Inspection and maintenance agreement means a written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project.
New development means a land development activity on a previously undeveloped site.
Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.
Nonstructural stormwater management practice or nonstructural practice means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels.
Off-site facility means a stormwater management facility located outside the boundaries of the site.
On-site facility means a stormwater management facility located within the boundaries of the site.
Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the two-year through 25-year frequency storm events.
Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
Permit means the permit issued by Paulding County to the applicant which is required for undertaking any land development activity.
Person means, except to the extent exempted from this ordinance, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.
Post-development refers to the time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require.
Pre-development refers to the time period, or the conditions that exist, on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions.
Project means a land development project.
Redevelopment means a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.
Regional stormwater management facility or regional facility means stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced.
Runoff means stormwater runoff.
Site means the parcel of land being developed, or the portion thereof on which the land development project is located.
Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management.
Stormwater management means the collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare.
Stormwater management facility means any infrastructure that controls or conveys stormwater runoff.
Stormwater management measure means any stormwater management facility or nonstructural stormwater practice.
Stormwater management plan means a document describing how existing runoff characteristics will be affected by a land development project and containing measures for complying with the provisions of this ordinance.
Stormwater management system means the entire set of structural and nonstructural stormwater management facilities and practices that are used to capture, convey and control the quantity and quality of the stormwater runoff from a site.
Stormwater retrofit means a stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.
Stormwater runoff means the flow of surface water resulting from precipitation.
Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff.
Subdivision means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.
13.4 Permit procedures and requirements.
13.4.1 Permit application requirements. No owner or developer shall perform any land development activities without first meeting the requirements of this ordinance prior to commencing the proposed activity.
Unless specifically exempted by this ordinance, any owner or developer proposing a land development activity shall submit to the Paulding County a permit application on a form provided by the Paulding County for that purpose.
Unless otherwise exempted by this ordinance, a permit application shall be accompanied by the following items in order to be considered:
1) Stormwater concept plan and consultation meeting certification in accordance with section 13.4.2;
2) Stormwater management plan in accordance with section 13.4.3;
3) Inspection and maintenance agreement in accordance with section 13.4.4, if applicable;
4) Performance bond in accordance with section 13.4.5, if applicable; and,
5) Permit application and plan review fees in accordance with section 13.4.6.
13.4.2 Stormwater concept plan and consultation meeting. Before any stormwater management permit application is submitted, the land owner or developer [shall] meet with the Paulding County Community Development Department for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed land development project.
This consultation meeting should [shall] take place at the time of the preliminary plan of subdivision or other early step in the development process. The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal site design engineering is commenced.
To accomplish this goal the following information should [shall] be included in the concept plan which should [shall] be submitted in advance of the meeting:
A) Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: existing and proposed topography;
perennial and intermittent streams; mapping of predominant soils from soil surveys (when available); boundaries of existing predominant vegetation and proposed limits of clearing and grading; and location of existing and proposed roads, buildings, parking areas and other impervious surfaces.
B) Natural resources inventory. A written or graphic inventory of the natural resources at the site and surrounding area as it exists prior to the commencement of the project.
This description should include a discussion of soil conditions, forest cover, topography, wetlands, and other native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.). Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development.
C) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system including: preliminary selection and location of proposed structural stormwater controls; location of existing and proposed conveyance systems such as grass channels, swales, and storm drains;
flow paths; location of floodplain/floodway limits; relationship of site to upstream and downstream properties and drainages; and preliminary location of proposed stream channel modifications, such as bridge or culvert crossings.
The Paulding County Watershed Protection Plan, greenspace protection plan (if applicable), and any relevant resource protection plans prescribed by the county or city therein will be consulted in the discussion of the concept plan.
13.4.3 Stormwater management plan requirements. The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this ordinance, including the performance criteria set forth in section 13.5 below.
This plan shall be in accordance with the criteria established in this section and be prepared and certified by either a registered professional engineer, registered land surveyor or a registered landscape architect, in accordance with O.C.G.A. §§ 43-15-2 and 12-7-4*b, with competency in hydrology and hydraulics, currently licensed in the State of Georgia, who must verify that the design of all stormwater management facilities and practices meet the submittal requirements outlined in the submittal checklist(s) found in the stormwater design manual.
The stormwater management plan must ensure that the requirements and criteria in this ordinance are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the stormwater management site plan checklist found in the stormwater design manual. This includes:
A) Common address and legal description of site.
B) Vicinity map.
C) Existing conditions hydrologic analysis. The existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of existing site conditions with the drainage basin boundaries indicated; acreage, soil types and land cover of areas for each subbasin affected by the project; all perennial and intermittent streams and other surface water features; all existing stormwater conveyances and structural control facilities; direction of flow and exits from the site; analysis of runoff provided by off-site areas upstream of the project site;
and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. For redevelopment sites, predevelopment conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities.
D) Post-development hydrologic analysis. The post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of developed site conditions with the post-development drainage basin boundaries indicated; total area of post-development impervious surfaces and other land cover areas for each subbasin affected by the project; calculations for determining the runoff volumes that need to be addressed for each subbasin for the development project to meet the post-development stormwater management performance criteria in section 13.5; location and boundaries of proposed natural feature protection and conservation areas; documentation and calculations for any applicable site design credits that are being utilized; methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. If the land development activity on a redevelopment site constitutes more than 50 percent of the site area for the entire site, then the performance criteria in section 13.5 must be met for the stormwater runoff from the entire site. If available, site developers may use the Metropolitan North Georgia Water Planning District's spreadsheet-based computer modeling tool to assist in the post-development hydrologic water quality analysis.
E) Stormwater management system. The description, scaled drawings and design calculations for the proposed post-development stormwater management system, which shall include: A map and/or drawing or sketch of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; a narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; a hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria in section 13.5; drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow; and where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans and/or local greenspace protection plan.
F) Post-development downstream analysis. A downstream peak flow analysis which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is ten percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the stormwater design manual.
G) Construction-phase erosion and sedimentation control plan. An erosion and sedimentation control plan in accordance with the Georgia Erosion and Sedimentation Control Act (or reference to the local erosion and sedimentation control ordinance) or NPDES permit for construction activities. The plan shall also include information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be converted into permanent stormwater controls.
H) Landscaping and open space plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to stormwater management facilities and practices. The landscaping plan must also include: the arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan; information necessary to construct the landscaping elements shown on the plan drawings; descriptions and standards for the methods, materials and vegetation that are to be used in the construction; density of plantings;
descriptions of the stabilization and management techniques used to establish vegetation; and a description of who will be responsible for ongoing maintenance of vegetation for the stormwater management facility and what practices will be employed to ensure that adequate vegetative cover is preserved.
I) Operations and maintenance plan. Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices to ensure their continued function as designed and constructed or preserved. These plans will identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, responsible parties for maintenance, funding, access and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan.
J) Maintenance access easements. The applicant must ensure access from public rightof-way to stormwater management facilities and practices requiring regular maintenance at the site for the purpose of inspection and repair by securing all the maintenance access easements needed on a permanent basis. Such access shall be sufficient for all necessary equipment for maintenance activities. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in effect even with the transfer of title of the property.
K) Inspection and maintenance agreements. Unless an on-site stormwater management facility or practice is dedicated to and accepted by the Paulding County as provided in section 13.4.4 below, the applicant must execute an easement and an inspection and maintenance agreement binding on all subsequent owners of land served by an on-site stormwater management facility or practice in accordance section 13.4.4.
L) Evidence of acquisition of applicable local and nonlocal permits. The applicant shall certify and provide documentation to the Paulding County that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management plan.
13.4.4 Stormwater management inspection and maintenance agreements. Prior to the issuance of any permit for a land development activity requiring a stormwater management facility or practice hereunder and for which the Paulding County requires ongoing maintenance, the applicant or owner of the site must, unless an on-site stormwater management facility or practice is dedicated to and accepted by the Paulding County, execute an inspection and maintenance agreement, and/or a conservation easement, if applicable, that shall be binding on all subsequent owners of the site.
Unless otherwise agreed to by the county, all stormwater facilities and practices will require maintenance agreements and will be inspected by the county. The inspection and maintenance agreement, if applicable, must be approved by the Paulding County prior to plan approval, and recorded in the deed records upon final plat approval.
The inspection and maintenance agreement shall identify by name or official title the person(s) responsible for carrying out the inspection and maintenance. Responsibility for the operation and maintenance of the stormwater management facility or practice, unless assumed by a governmental agency, shall remain with the property owner and shall pass to any successor owner. If portions of the land are sold or otherwise transferred, legally binding arrangements shall be made to pass the inspection and maintenance responsibility to the appropriate successors in title. These arrangements shall designate for each portion of the site, the person to be permanently responsible for its inspection and maintenance.
As part of the inspection and maintenance agreement, a schedule shall be developed for when and how often routine inspection and maintenance will occur to ensure proper function of the stormwater management facility or practice. The agreement shall also include plans for annual inspections to ensure proper performance of the facility between scheduled maintenance and shall also include remedies for the default thereof.
In addition to enforcing the terms of the inspection and maintenance agreement, Paulding County may also enforce all of the provisions for ongoing inspection and maintenance in section 13.6 of this ordinance.
Paulding County, in lieu of an inspection and maintenance agreement, may accept dedication of any existing or future stormwater management facility for maintenance, provided such facility meets all the requirements of this ordinance and includes adequate and perpetual access and sufficient area, by easement or otherwise, for inspection and regular maintenance.
13.4.5 Performance and maintenance bonds. The Paulding County Community Development Department requires the posting of maintenance/performance bonds or other security to guarantee performance of construction and/or maintenance obligations hereunder. All storm drainage facilities used for water quality and quantity best management practices shall be maintained in accordance with the standards aforesaid for a period of 18 months from the date this bond is signed and this bond will not be released until such time that we are notified in writing by Paulding County Water and Sewer System Department and the Paulding County Community Development Department that the work has been done properly and satisfactorily completed.
13.4.6 Application procedure.
1) Applications for land development permits shall be filed with the Paulding County Community Development Department in conjunction with the existing plan review process.
2) Permit applications shall include the items set forth herein above (two copies of the stormwater management plan and the inspection maintenance agreement, if applicable, shall be included).
3) Paulding County shall inform the applicant whether the application, stormwater management plan and inspection and maintenance agreement are approved or disapproved.
4) If either the permit application, stormwater management plan or inspection and maintenance agreement are disapproved, Paulding County Community Development Department shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same, in which event subparagraph 3 above and this subparagraph shall apply to such resubmittal.
5) Upon a finding by Paulding County that the permit application, stormwater management plan and inspection and maintenance agreement, if applicable, meet the requirements of this ordinance, the Paulding County Community Development Department may issue a permit for the land development project, provided all other legal requirements for the issuance of such permit have been met.
6) Notwithstanding the issuance of the permit, in conducting the land development project, the applicant or other responsible person shall be subject to the following requirements:
(a) The applicant shall comply with all applicable requirements of the approved plan and this ordinance and shall certify that all land clearing, construction, land development and drainage will be done according to the approved plan;
(b) The land development project shall be conducted only within the area specified in the approved plan;
(c) Paulding County shall be allowed to conduct periodic inspections of the project;
(d) No changes may be made to an approved plan without review and written approval by the Paulding County Community Development Department; and,
(e) Upon completion of the project, the applicant or other responsible person shall submit the engineer's report and certificate and as-built plans required by section 13.6.2.
13.4.7 Application review fees. The fee for review of any stormwater management application shall be based on the fee structure established by the Paulding County Community Development Department and shall be made prior to the issuance of any building permit for the development.
13.4.8 Modifications for off-site facilities. The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility.
The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility.
A stormwater management plan must be submitted to the Paulding County Community Development Department which shows the adequacy of the off-site or regional facility.
To be eligible for a modification, the applicant must demonstrate to the satisfaction of Paulding County that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas:
1) Increased threat of flood damage to public health, life, and property;
2) Deterioration of existing culverts, bridges, dams, and other structures;
3) Accelerated streambank or streambed erosion or siltation;
4) Degradation of in-stream biological functions or habitat; or
5) Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations.
13.5 Post-development stormwater management performance criteria.
The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this ordinance:
13.5.1 Water quality. All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if:
1) It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual;
2) Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual; and,
3) Runoff from hotspot land uses and activities identified by the Paulding County Stormwater Division are adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices and pollution prevention practices.
13.5.2 Stream channel protection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches:
1) Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer;
2) 24-hour extended detention storage of the one-year, 24-hour return frequency storm event;
3) Erosion prevention measures such as energy dissipation and velocity control.
13.5.3 Overbank flooding protection. Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under section 13.5.2 is exempted, then peak discharge rate attenuation of the 2-year through the 25-year return frequency storm event must be provided.
13.5.4 Extreme flooding protection. Extreme flood and public safety protection shall be provided by controlling and safely conveying the 100-year, 24-hour return frequency storm event such that flooding is not exacerbated.
13.5.5 Structural stormwater controls. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from Paulding County Community Development Department before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the Paulding County Community Development Department may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question.
Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control.
13.5.6 Stormwater credits for nonstructural measures. The use of one or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under section 13.5.1. The applicant may, if approved by the Paulding County Community Development Department, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual.
13.5.7 Drainage system guidelines. Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining project sites and/or public rights-of-way. Stormwater conveyance facilities that are designed to carry runoff from more that one parcel, existing or proposed, shall meet the following requirements:
1) Methods to calculate stormwater flows shall be in accordance with the stormwater design manual;
2) All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and,
3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual.
13.5.8 Dam design guidelines. Any land disturbing activity that involves a site which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable.
13.6 Construction inspections of post-development stormwater management system.
13.6.1 Inspections to ensure plan compliance during construction. Periodic inspections of the stormwater management system construction shall be conducted by the staff of Paulding County Community Development Department and Paulding County Water and Sewer System Department. Construction inspections shall utilize the approved stormwater management plan for establishing compliance.
All inspections shall be documented with written reports that contain the following information:
1) The date and location of the inspection;
2) Whether construction is in compliance with the approved stormwater management plan;
3) Variations from the approved construction specifications; and,
4) Any other variations or violations of the conditions of the approved stormwater management plan.
If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions.
13.6.2 Final inspection and as built plans. Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual "as built" plans for any stormwater management facilities or practices after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a registered professional engineer, registered landscape architect or registered land surveyor, licensed in the State of Georgia. A final inspection by the Paulding County Community Development Department is required before the release of any performance securities can occur.
13.7 Ongoing inspection and maintenance of stormwater facilities and practices.
13.7.1 Long-term maintenance inspection of stormwater facilities and practices. Stormwater management facilities and practices included in a stormwater management plan are subject to an inspection and maintenance agreement and must undergo ongoing inspections to document maintenance and repair needs and ensure compliance with the requirements of the agreement, the plan and this ordinance.
A stormwater management facility or practice shall be inspected on a periodic basis by the responsible person in accordance with the approved inspection and maintenance agreement.
In the event that the stormwater management facility has not been maintained and/or becomes a danger to public safety or public health, Paulding County shall notify the person responsible for carrying out the maintenance plan by registered or certified mail to the person specified in the inspection and maintenance agreement. The notice shall specify the measures needed to comply with the agreement and the plan and shall specify the time within which such measures shall be completed. If the responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, the Paulding County, may correct the violation as provided in subsection 13.7.4 hereof.
Inspection programs by the Paulding County may be established on any reasonable basis, including but not limited to: routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to:
reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in stormwater management facilities; and evaluating the condition of stormwater management facilities and practices.
13.7.2 Right-of-entry for inspection. The terms of the inspection and maintenance agreement shall provide for the Paulding County to enter the property at reasonable times and in a reasonable manner for the purpose of inspection. This includes the right to enter a property when it has a reasonable basis to believe that a violation of this ordinance is occurring or has occurred and to enter when necessary for abatement of a public nuisance or correction of a violation of this ordinance.
13.7.3 Records of maintenance activities. Parties responsible for the operation and maintenance of a stormwater management facility shall provide records of all maintenance and repairs to Paulding County Water and Sewer System Department.
13.7.4 Failure to maintain. If a responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, Paulding County, after 30 days' written notice (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient), may correct a violation of the design standards or maintenance requirements by performing the necessary work to place the facility or practice in proper working condition. Paulding County may assess the owner(s) of the facility for the cost of repair work which shall be a lien on the property, and may be placed on the ad valorum tax bill for such property and collected in the ordinary manner for such taxes.
13.8 Violations, enforcement and penalties.
Any action or inaction which violates the provisions of this ordinance or the requirements of an approved stormwater management plan or permit, may be subject to the enforcement actions outlined in this section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.
13.8.1 Notice of violation. If Paulding County determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved stormwater management plan or the provisions of this ordinance, it shall issue a written notice of violation to such applicant or other responsible person. Where a person is engaged in activity covered by this ordinance without having first secured a permit therefore, the notice of violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site.
The notice of violation shall contain:
1) The name and address of the owner or the applicant or the responsible person;
2) The address or other description of the site upon which the violation is occurring;
3) A statement specifying the nature of the violation;
4) A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the stormwater management plan or this ordinance and the date for the completion of such remedial action;
5) A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed; and,
6) A statement that the determination of violation may be appealed to Paulding County Board of Commissioners by filing a written notice of appeal within 30 days after the notice of violation (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient).
13.8.2 Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, Paulding County Paulding County Community Development Department shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable opportunity, of not less than ten days (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) to cure such violation. In the event the applicant or other responsible person fails to cure such violation after such notice and cure period, Paulding County may take any one or more of the following actions or impose any one or more of the following penalties.
1) Stop work order—Paulding County may issue a stop work order which shall be served on the applicant or other responsible person. The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take the necessary remedial measures to cure such violation or violations.
2) Withhold certificate of occupancy—Paulding County may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein.
3) Suspension, revocation or modification of permit—Paulding County may suspend, revoke or modify the permit authorizing the land development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated [upon such conditions as the Paulding County may deem necessary] to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations.
4) Civil penalties—In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as Paulding County shall deem appropriate (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) after Paulding County has taken one or more of the actions described above, Paulding County may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation.
5) Criminal penalties—For intentional and flagrant violations of this ordinance, Paulding County may issue a citation to the applicant or other responsible person, requiring such person to appear in Magistrate Court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offence.
ARTICLE 14 ADMINISTRATION*
14.1 Fees.
14.1.1 Building permits. Building permit fees are as applicable by the building and permitting division of the community development department and as approved by the Paulding County Board of Commissioners. Building permits may be obtained through the Paulding County Permit Office located on the first floor of the "Watson Government Complex" located at 240 Constitution Boulevard, Dallas, Georgia.
14.1.2 Disturbance permits.
1) Land disturbance permit fees are as follows:
(a) Grading Permit: $100.00 + $25.00 per acre
(b) Development Permit (Subdivision): $100.00 + $25.00 per lot
(c) Development Permit (Commercial): $100.00 + $25.00 per acre
2) Land disturbance permits may be obtained through the community development department located on the first floor of the Watson Government Complex.
14.1.3 Transportation permits.
1) Transportation permit fees are as follows:
(a) Road Use Permit: $50.00
(b) Encroachment Permit: $50.00
2) Transportation permits may be obtained through the Paulding County Department of Transportation located at first floor of the Watson Government Complex.
14.1.4 Public safety permits.
1) Public safety permit fees are as follows:
(a) Outdoor Burn Permit (Registration Only):
$25.00
(b) Blasting Permit (Registration Only): $25.00
(c) Trench/Excavation Permit (Registration Only):
$25.00
2) Public safety permits may be obtained through the Paulding County Fire Chief's Office located at 535 Seaboard Avenue, Hiram, Georgia.
14.1.5 Plan/plat review and inspection fees.
1) Plan and plat review fees and inspection fees are as follows:
(a) Preliminary plat review fee—Community development department: $325.00 plus $30.00 per lot (minimum $1,000.00)—Includes residential construction plan review.
(b) Preliminary plat review fee—Water system: $300.00 plus $10.00 per lot— Includes residential construction plan review.
(c) Nonresidential construction plan review fee—Community development department: $300.00 plus $25.00 per acre.
(d) Nonresidential construction plan review fee—Water system: $250.00 plus $25.00 per acre.
(e) Preliminary plat or construction plan re-submittal fee: $100.00.
(f) Final plat review fee: $100.00 plus inspection fees (see below).
(g) Subdivision inspection fees—Community development department: $30.00 per lot.
(h) Subdivision inspection fees—Water system: $18.00 per lot for water inspections;
an additional $8.00 per lot shall be charged for sewer line inspections, if sewer is present in the subdivision.
(i) Nonresidential inspection fees—Community development department: $300.00 plus $100.00 per acre.
(j) Nonresidential inspection fees—Water system: $300.00 plus $100.00 per acre.
2) All plan/plat review fees and inspection fees may be paid in the office of development division located on the first floor in the Watson Government Complex.
3) There are other fees collected by the various departments and offices of Paulding County, including but not limited to the environmental health department and clerk of the superior court.
(Res. No. 10-18, § 3, 8-10-2010)
14.2 Maintenance and performance bonds.
14.2.1 Maintenance securities.
1) A maintenance bond, letter of credit, or other equivalent form of security as approved by the county attorney, running in favor of the county, shall be posted with the county by all subdividers/persons where street or other improvements are made and offered to the county for acceptance and maintenance.
2) The amount of this security will be calculated by the formula specified in section 14.2.1.6) and shall be filed with the county before the final plat is signed by Paulding County. Any bond, letter of credit, or other equivalent form of approved security shall be on forms supplied or approved by the county.
3) No securities shall be terminated or otherwise allowed to expire without at least 30 days' prior written notice to that effect to both the county and the subdivider/person.
4) Separate bonds are required for each subdivision unit, phase, or similar division. The subdivider/person shall maintain all improvements in the subdivision to be dedicated to the county, for a minimum of 18 months from the issuance date of the security or the recording of the final plat. No dedication of improvements shall be accepted by the county until the expiration of 18 months from such date and inspection and determination by the county at the expiration of such time that all the improvements meet all county specifications and requirements under these regulations.
5) If a period of 18 months elapses from the commencement of the maintenance period for any subdivision and defects, noncompliance, or violations still exist to the extent that the subdivision has not been accepted by the county, the county is authorized to withhold issuance of any and all permits or to refuse inspections to any subdivider/ person on the project in dispute, to any structure or project located within the subdivision, or to any other project in which the subdivider/person may have a financial interest who violates or fails to comply with this article.
6) The amount of the maintenance bond will be calculated at $15.00 per linear foot of street, with a minimum amount of $15,000.00.
7) At the end of the 18-month period, the county shall either:
(a) Release the bond and accept the bonded improvements.
(b) Require an additional bond period of up to 12 months, if the project is not developed to the satisfaction of the county.
(c) Call the bond and hold the bond proceeds until the project meets the county's satisfaction or the county makes the necessary improvements using the bond proceeds.
14.2.2 Performance securities.
1) Each subdivider/person shall guarantee installation of improvements and faithful performance of all provisions of county regulations and ordinances. The subdivider/ person shall maintain a performance bond, letter of credit, or other equivalent form of security in an amount that is 125 percent of the construction cost of all improvements including offsite disposal of waste, as estimated by the subdivider's/person's professional engineer and verified by the director of the community development department or his/her designee. Said bond, letter of credit, or other equivalent form of security shall be on forms supplied by the county.
2) In the event that a subdivider/developer shall not have completed all requirements of the construction plans and desires to record a final plat, the plat may be recorded subject to the posting of a performance security in a form acceptable to the county attorney's office. Each subdivider/person shall guarantee installation of improvements and faithful performance of all provisions of county regulations and the county ordinances as applies to performance securities.