Paulding County · Ordenanza de zonificación
Paulding County Zoning Ordinance
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2025-12-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 7 de 9. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
7.3.10 Polyethylene tubing for ductile iron pipe. Polyethylene tubing shall be manufactured of virgin polyethylene material conforming to ASTM Standard Specification D-1248-78, Type I, Class A or C, Grade E-1. The polyethylene film shall have a minimum thickness of eight mm.
7.3.11 Casing spacers. Approved casing spacers shall be used to secure the sewer force main, or outfall sewer if directed by the department, on grade throughout the length of the casing.
The spacers shall be sufficient to secure the pipe on grade during the grouting operation.
7.3.12 Concrete for thrust blocks and thrust collars. Concrete for thrust blocks and thrust collars shall be ready-mix and have a minimum compressive strength of 3,000 psi at 28 days.
7.3.13 Gaskets for joint restraint inside casings. Inside of casings, the sewer line joints shall be slip-joint restrained by using U.S. Pipe "Field-Lok" gaskets or approved equal.
7.4 Excavation and construction.
7.4.1 General.
1) It shall be expressly understood that these regulations are for installation of all sanitary sewer mains and appurtenances.
2) All work shall conform to the applicable provisions of specifications prepared by the AWWA, ANSI and ASTM of latest revision, except as otherwise specified herein.
3) Compliance with applicable safety regulations is the responsibility of each company engaged in the work. The department assumes no responsibility for the actions of others on the job site. It is the responsibility of those installing sanitary sewer lines and appurtenances to conform to OSHA regulations.
7.4.2 Trench and manhole excavation.
1) Sanitary sewer lines shall normally be installed by open-cut trench excavation. Pipe trenches shall be excavated straight and true to grade and line and in the location shown on the plans. Trenches shall be dug so that the pipe can be laid to the alignment and depth required, and the trench shall be of such width and shall be braced and drained so that the workmen may work therein safely and efficiently. Chocking under the pipe will not be permitted. All joints shall be as specified herein. Excavation must be made under the bell of each pipe so that the entire length of the pipe will lie uniformly on the bottom of the trench and the pipe weight shall not rest on the bells.
Trenches shall be free of water during the work.
(a) Trenches shall have a minimum width of 12 inches plus the diameter of the outside of the bell of the sewer main and the maximum trench width at the centerline of the pipe shall not be more than the nominal diameter of the pipe plus two feet. In unpaved areas, the trenches may have a greater width that this, beginning at one foot above the top of the pipe and extending to the ground surface, if such width is necessary or desirable. However, in paved areas, the width of the trench from top to bottom shall not exceed the nominal diameter of the pipe plus two feet.
(b) In cases where water mains cross above sanitary sewers, there shall be a minimum clearance of 18 inches vertical separation between the water and sewer mains. In cases where a sanitary sewer crosses above a water main, there shall be a minimum clearance of 18 inches vertical separation between the mains, plus the sanitary sewer main shall be encased in concrete. Both mains shall be ductile iron pipe. At crossings, one full length of sewer pipe must be located so that both joints are as far from the water main as possible. In cases where sanitary sewer mains parallel water mains, there shall be a minimum of ten feet horizontal separation maintained between the mains. These distances are measured edge to edge.
(c) No excavation shall be made under highways, streets, alleys or private property until satisfactory arrangements have been made with the state, city, county or owners of the property to be crossed. All excavated material shall be placed so as to not interfere with public travel on the streets and highways along which the lines are laid. Not more than 100 feet of trench shall be opened on any line in advance of pipe laying.
(d) When possible, all crossings of paved highways or driveways by pipe line shall be made by boring or jacking the pipe under the pavement and shall be done in such manner as not to damage the pavement or foundation, unless the casing or pipe is in solid rock, in which case the crossing shall be made by the open cut method or by tunneling.
(e) Wherever streets, roads or driveways are cut, they shall be immediately backfilled and compacted after the pipe is laid and shall be maintained in first-class condition as passable at all times until repaved.
(f) Backfilling, compaction, dressing and clean-up shall be kept as close to the line laying crew as is practical, and negligence in this feature of the work will not be tolerated.
(g) In excavation and backfilling and laying pipe, care must be taken not to remove or injure any water, sewer, gas or other pipes, conduits or other structures without permission from the department. When an obstruction is encountered, the contractor shall notify the designer who will have the owner of the obstruction adjust same or make necessary changes in grade and/or alignment to avoid such obstruction. Any house connection, drains or other structures damaged by the contractor shall be repaired or replaced immediately.
(h) All excavation materials shall be placed on one side of the trench, unless permission is given by the department to place it on both sides. Excavation materials shall be so placed as not to endanger the work and so that free access may be had at all times to all parts of the trench and to all fire hydrants or water valve boxes, etc. All shade trees, shrubs, etc., shall be protected.
(i) The excavation for manholes shall extend to a firm, acceptable foundation and leave not less than 24 inches in the clear between their exterior surface and the embankment or retaining structure that may be used to protect it.
(j) The contractor shall furnish, install and maintain such sheathing, bracing, etc., as may be required to support the sides of the excavation and to prevent any movement that might injure the pipe, or cause sloughing of the street or trench, or otherwise injure or delay the work or interfere with adjoining structures.
(k) Construction occurring around active sanitary sewerage systems shall be done in such a way so as to prevent the spillage of sewage.
2) All materials shall be considered as rock which cannot be excavated except by drilling, blasting or wedging. It shall consist of undecomposed stone in solid layers or of boulders of not less than one-half cubic yard. Wherever rock is encountered in the excavation, it shall be removed by suitable means. If blasting is used for removal of rock, the contractor shall take all proper safety precautions. He shall comply with all rules and regulations for the protection of life and property that may be imposed by any public body having jurisdiction relative to the handling, storing and use of explosives. He is fully responsible for filing for and acquiring any blasting permits that may be required by those agencies having jurisdiction. Before blasting, the contractor shall cover the excavation with heavy timbers and mats in such a manner as to prevent damage to persons or the adjacent property. Rock excavation near existing pipelines or other structures shall be conducted with the utmost care to avoid damage. The contractor shall be wholly responsible for any damage resulting from blasting, and any injury or damage to structures or property shall be promptly repaired by the contractor to the satisfaction of the department and property owner.
3) Rocks in trenches shall be excavated over the horizontal limits of excavation and to depths as follows:
Size of Pipeline Depth of Excavation Below Bottom of Pipe 4 to 6 inches 6 inches 8 to 18 inches 8 inches 18 to 30 inches 10 inches Over 30 inches 12 inches
(a) The undercut space shall then be brought up to grade by backfilling with subgrade stabilizer stone.
(b) In rock excavation, the backfill from the bottom of the trench to one foot above the top of the pipe shall be finely pulverized soil, free from rocks and stones. The rest of the backfill shall not contain over 75 percent broken stone, and the maximum sized stone placed in the trench shall not weigh over 50 pounds. Excess rock and fragments of rock weighing more than 50 pounds shall be loaded and hauled to disposal. If it is necessary, in order to comply with these specifications, selected backfill shall be borrowed and hauled to the trenches in rock excavation.
(c) Sides of the trench shall be trimmed of projecting rock that will interfere with backfilling operations. Rock excavation by blasting shall be at least 75 feet in advance of pipe laying.
7.4.3 Installation of sanitary sewer.
1) Construction stake-out will be required prior to construction of sanitary sewer lines. At a minimum, the horizontal alignment will be staked at 100-foot intervals and each manhole will be located with a centerline stake and two offset hubs. "Cuts" to invert elevations will be shown for each manhole entry and exit pipe. A copy of the stake-out notes will be provided by the department.
2) Pipe and accessories shall at all times be handled with care to avoid damage. Whether moved by hand, skidways or hoists, material shall not be dropped or bumped. The interior of all pipe shall be kept free from dirt and foreign matter at all times. Each joint of pipe shall be unloaded opposite or near the place where it is to be laid in the trench. All such material that is defective in manufacture or has been damaged in transit or after delivery shall be removed from the job site.
3) All pipe and appurtenances shall be of the dimensions and laid to the line and grade as shown on the plans and as established by the design professional and as approved by the department. Wyes and/or service connections and stubs from manholes shall be placed where shown on plans and as approved by the department. All such connections shall be blanked off with suitable stopper and made watertight with jute and cement mortar.
4) The preferred order of construction is to connect to existing sanitary sewers after all other construction is complete and conditionally accepted by the department. Connections to existing sanitary sewers can be done at the beginning of construction; however, the new main shall be plugged where it enters either the existing manhole or the new doghouse manhole over an existing sanitary sewer, and the plug shall remain in place until the project is conditionally accepted.
5) Sanitary sewer pipes shall be joined by "push-on" joints using elastomeric gaskets to affect the pressure seal. The ends of pipe to be joined and the gaskets shall be cleaned immediately before assembly, and the assembly shall be made as recommended by the pipe manufacturer. Lubricant used must be nontoxic and supplied or approved for use by the manufacturer. Sanitary sewer pipes shall be laid in the uphill direction with the bells pointing upgrade. Any variation from this procedure shall require approval from the department.
6) Bell holes shall be provided of sufficient size to allow ample room for making the pipe joints without putting any load on the bell of the pipe. The bottom of the trench between bell holes shall be carefully graded so that the pipe barrel will rest on a solid foundation for its entire length as shown on the plans. Pipe shall be laid with joints close and even, butting all around, so that it will form a close concentric joint with adjoining pipe with no sagging at the hub and so that a true surface is given to the invert throughout the entire length of the sewers. After the pipe is laid, backfilling shall be completed as directed in these regulations.
7) The contractor shall be required to provide and operate any equipment necessary to keep the trenches free from water while pipe is being laid and the joints made. The installed pipe shall not be used for draining water from the ditch.
8) Pipe grades shall be obtained by use of a laser and double-checked with a surveying level and rod.
9) Completed sewers shall be tested between manholes with lanterns or reflected light and shall show the full circle of the pipe from manhole to manhole without obstruction.
10) Sewers shall be laid tight and the rate of infiltration in any section of line between adjacent manholes shall not exceed 100 G.P.D. per inch diameter of pipe per mile of line when the trenches are saturated with water.
All openings along the line of the sewers shall be securely closed at night, during suspension of work, and at the end of each work period, with a water-tight stopper.
No length of pipe shall be laid until one preceding it shall have sufficient quantity of fine earth tamped around it to hold it firmly in place.
7.4.4 Making of joints. When joining gravity sewer pipe, both the spigot end and the bell end of the pipe shall be perfectly clean and free from dirt, oil, grease or other foreign matter. The spigot end shall be lightly coated with the lubricant recommended and furnished by the manufacturer, and the pipe then shall be securely and firmly seated in the bell end of the adjoining pipe. In making the joint, the spigot end of the pipe, after being cleaned and coated with lubricant, shall not be allowed to touch the sides or bottom of the trench before being inserted in the bell end of the adjoining pipe. In addition to the above, joints shall be made in strict accordance with the specifications and recommendations of the manufacturer.
7.4.5 Subgrade and pipe bedding.
1) All D.I.P. or R.C.P. pipe shall have a minimum of Class "C" bedding. All PVC pipe shall have a minimum bedding as described below and shown in the standard details.
Wherever water or wet soil is encountered, Class "B" bedding shall be provided for D.I.P. or R.C.P. If specifically designated on the plans, Class "A" or "B" bedding may be required.
2) A description of Class "A," "B," and "C" bedding is as follows:
(a) Class "A" bedding. Class "A" bedding refers to bedding with concrete cradle, arch or encasement. The contractor shall conform to details show in the detailed drawings when Class "A" bedding is required.
(b) Class "B" bedding. The pipe shall be bedded in crushed granite material, conforming to the section of these regulations on "Subgrade Stabilizer Stone," or other suitable materials approved by the department. The bedding shall be placed on a flat trench bottom with a minimum thickness beneath the pipe of one-eighth the outside pipe diameter, but not less than six inches (150 mm) and sliced under the haunches of the pipe with a shovel or other suitable tool to height of one-half the outside pipe diameter, or to the horizontal centerline. The initial backfill shall be hand placed to a level of 12 inches (300 mm) over the top of the pipe and shall consist of finely divided materials free from debris, organic material and large rocks or stones.
(c) Class "C" bedding. The pipe shall be bedded in subgrade stabilizer stone placed on a flat trench bottom. The bedding material shall have a minimum thickness beneath the pipe of six inches (150 mm) or one-eighth of the outside diameter of the pipe, whichever is greater, and sliced under the haunches of the pipe with a shovel or other suitable tool to a height of one-sixth the outside diameter of the pipe. The initial backfill shall be hand placed to a level of 12 inches (300 mm) over the top of the pipe and shall consist of finely divided materials free from debris, organic material and large rocks or stones. Bedding materials shall be as described in the section of these regulations on "Subgrade Stabilizer Stone."
(d) Special bedding for PVC pipe. The pipe shall be bedded in crushed granite material, conforming to the section of these regulations on "Subgrade Stabilizer Stone," or other materials approved by the department. The bedding shall be placed on a flat trench bottom with a minimum thickness beneath the pipe of one-fourth the outside pipe diameter, but not less than six (6) inches (150 mm) and sliced under the haunches of the pipe with a shovel or other suitable tool to height of two-thirds the outside pipe diameter. The initial backfill shall be hand placed to a level of 12 inches (300 mm) over the top of the pipe and shall consist of finely divided materials free from debris, organic material and large rocks or stones.
7.4.6 Dewatering trenches. The contractor shall do all necessary pumping or bailing, build all drains and do all other work necessary at his own expense to keep the trenches clear of water during the progress of the work. No structure shall be built or pipe shall be laid in water, and water shall not be allowed to flow over or rise upon any concrete, masonry or pipe until the same has been inspected and the concrete or joint material has thoroughly set. All water pumped, bailed or otherwise removed from the trench or other excavation shall be conveyed in a proper manner to a suitable place of discharge where it will not cause injury to the public health or to public or private property or to work completed or in progress, or to the surface of the streets or cause any interference with the use of same by the public.
7.4.7 Backfilling.
1) After the pipe has been laid, backfilling shall be done in two distinct operations. In general, all backfill beneath, around and to a depth of 12 inches above the top of the pipe shall be placed by hand in four inch layers for the full width of the trench and thoroughly compacted by hand with vibratory equipment. The remainder of the backfill shall be placed in six inch layers and compacted to the top of the trench, either by pneumatic had tamps, hydro-tamps, or other approved methods. Care shall be taken so that the pipe is not laterally displaced during backfilling operations. The backfill lifts shall be placed by an approved method in accordance with that hereinafter specified. Backfill materials shall be the excavated materials without bricks, stone, foreign matter or corrosive materials, where not otherwise specified or indicated on the plans.
2) Backfill under permanent concrete or bituminous pavement and as elsewhere specified or indicated on the plans shall be approved bank-run sand or gravel or crushed stone free from large stones and containing not more than ten percent by weight of loam or clay. This backfill shall be compacted to 100 percent as determined by the Modified Proctor test for the top two feet of trench and 95 percent by the Modified Proctor test from pipe bedding to two feet below trench top. Mechanical vibrating equipment shall be used to achieve the required compaction. Pavement shall be replaced immediately after the backfilling operation is completed.
3) Backfill under gravel or crushed stone surfaced roadways shall be the approved suitable excavated material placed in six inch layers thoroughly compacted for the full depth and width of the trench, conforming to the compaction, density compaction method and materials as specified in the immediately preceding paragraph.
4) Backfill in unpaved areas shall be compacted with mechanical vibrating equipment to 90 percent as determined by the Modified Proctor test. Backfill material from pipe bedding to ground surface shall be excavated earth free from large stones and other debris.
5) The contractor shall fully restore and replace all pavement, sidewalks, landscapes, surface structures, etc., removed or disturbed as part of the work to a condition equal to or better than before the work began to the satisfaction of the department.
6) Where sheeting is used in connection with the work, it is in no case to be withdrawn before the trench is sufficiently filled to prevent damage to banks, road surfaces, adjacent pipes, adjacent structures or adjacent property, public or private.
7.4.8 Stream crossings.
1) The preferred method of crossing a river, stream, creek impoundment or wet weather ditch is with a minimum of two feet of cover between the lowest point in the stream and the top of outside diameter of the pipe. Ductile iron pipe is required for all stream crossings and shall extend a minimum of ten feet beyond the top of the bank on each side. Concrete collars or encasement must be provided at all joints for ductile iron pipe with less than three feet of cover.
2) The stream bed and banks at the crossing site shall be protected from erosion with the use of rip-rap, as defined and sized in the Manual for Erosion and Sediment Control in Georgia, Appendix C (Construction Materials), most current edition.
3) Aerial crossings will require detailed plans and will be allowed only when, in the department's opinion, there is no reasonable alternative.
4) Erosion control measures shall be installed prior to installing pipe across any stream.
All work should be performed when stream flows are at their lowest, and all work should be performed as quickly and safely as possible. As soon as conditions permit, the stream bed shall be cleared of all falsework, debris, and other obstructions placed therein or caused by the construction operations.
5) Erosion control measures can include, but are not limited to, the following items: a) silt fencing, types a, b and/or c; b) erosion control check dams; c) channel diversion through temporary storm drain pipe; and d) rock filter dams. The construction and installation of these various structures are detailed in the Manual for Erosion and Sediment Control in Georgia or the Georgia D.O.T. Standards and Construction Details, both of which are available for purchase to the contractor.
7.4.9 Casing for sanitary sewers.
1) Where pipe is required to be installed under railroads, highways, streets or other facilities by jacking or boring methods, construction shall be done in a manner that will not interfere with the operation of the utility, and shall not weaken the roadbed or structure.
2) Casing pipe shall be installed at the locations shown on the plans. Unless directed otherwise, the installation procedure shall be the dry bore method. The hole is to be mechanically bored and cased through the soil by a cutting head on a continuous auger mounted inside the casing pipe. The installation of the casing and boring of the hole shall be done simultaneously by jacking. The diameter of the bore shall conform to the outside diameter and circumference of the casing pipe as closely as practical. Any voids that develop during the installation operation shall be pressure grouted. Each segment of the casing pipe shall be welded (full circumference butt weld) to the adjoining segment. The completed casing shall have no sags or crowns that cause the grade for any segment to be less than the minimum slope for the size pipe being installed.
3) Excavation material will be removed and placed at the top of the working pit. Backfill material and methods of backfilling and tamping shall be as previously outlined in this article. Carrier pipe shall be D.I.P. and shall be inserted within the casing by use of approved casing spacers. Inside of casings, the sewer main joints shall be slip joint restrained by using U.S. Pipe "Field-Lok" gaskets or approved equal.
4) The annular space between the carrier pipe and the casing shall be pressure grouted after the carrier pipe is sufficiently secured on grade to prevent floating during grouting. The carrier pipe should be filled with water prior to grouting to aid in the prevention of floating. At each end of the casing pipe, the void between the carrier pipe and casing shall be sealed with brick and mortar.
7.4.10 Sewer service laterals.
1) A sewer service shall be provided for every existing or proposed lot or building. All services must be shown on the construction drawings. All service laterals shall be minimum of six inches in diameter. A common service shall not be allowed for two or more buildings. The service shall extend to the property line of the lot being served and normally be within ten feet of the lower corner of the lot. The contractor shall install a cleanout at the right-of-way and extend the PVC cleanout to a height of three feet above the finished grade. The contractor shall also place a four-inch x four-inch pre-treated wood post painted green above the end of the service lateral to enable the builder to locate the service. All service laterals shall have six feet of cover at the right-of-way. Where six feet of cover cannot be achieved, services shall be ductile iron.
2) Six-inch services shall be laid at a minimum grade of one percent. Service laterals tied directly to manholes shall enter the manholes through cored holes and shall be provided with a pre-molded rubber boot. Laterals shall enter the manhole no higher than six inches above the table and shall be provided with a concrete flume to slope the flow into the manhole invert.
3) The developer shall be responsible for serving all lots developed. On any lot where the service cannot be found, the developer shall be responsible for payment of the cost of installation of another service lateral. Also, unless noted on the final plat, the service shall be low enough to serve the first floor elevation at the building line. The builder shall be responsible for the location of the services prior to the pouring of the foundation, driveway or other appurtenances. The department will not be responsible for any house built too low to be served nor for any service covered by construction.
4) No plumber or contractor will be allowed to connect to the sewerage system except to the end of the service provided for this connection, when proper permit is issued. After the service is run from the end of the lateral provided by the sewer line contractor to the house plumbing, the cleanout at the right-of-way may be cut down to a level six inches below the finished grade. The cleanout shall be provided with a cast iron ferrule with a brass screw plug to enable the cleanout to be located with a metal detector.
Plastic plugs are not allowed.
7.4.11 Setting fittings on force mains.
1) Fittings shall be placed where shown on the plans. Fittings shall be properly braced to ensure that they will not be blown off or broken loose under the greatest possible force of the sewage flow. All fittings shall be mechanical joint with retainer glands unless specified otherwise. In situations where there is insufficient undisturbed earth to act as a bearing surface or where otherwise directed by the department, fittings shall be restrained by the use of threaded rods or other method acceptable to the department.
2) Prior to blocking any joint or fitting with concrete, that joint or fitting shall be wrapped with polyethylene film in such a manner that the concrete will not stick directly to the pipe but that the load bearing capacity of the blocking will not be affected.
7.4.12 Bracing, sheeting and/or shoring. Whenever the condition of the ground is such that it is necessary to protect the work, the street, the roadway or the workmen, the sides of the trench shall be supported with suitable bracing, sheeting and/or shoring to be furnished by the contractor at his own expense.
7.4.13 Location and protection of existing underground utilities. It is the responsibility of the contractor to locate the underground utilities and to protect same. Utility lines or services damaged by the contractor shall be repaired by the contractor at his own expense.
7.4.14 Connection to Paulding County's Existing Sanitary Sewer System.
1) The developer's private contractor shall make all required connections to the county's sewer system. The department's inspectors will supervise the connection and all associated work. The contractor shall give the department a minimum of 48 hours' notice prior to any sewer system work.
2) The contractor will provide proper traffic control devices and certified personnel to direct traffic if required.
3) All connections to existing manholes shall be properly cored with a coring machine.
"Knocking-out" of a hole in the manhole for a connection is not permitted.
4) The timing of the developer's connection to the county's system shall be pre-arranged with the department.
7.4.15 Street cuts.
1) All paved roads will be bored and cased. A bore must be attempted before consideration will be given to cutting the street.
2) Existing roadways shall not be open cut unless permission is granted by the Georgia D.O.T. and/or the Paulding County Department of Transportation. Submittal of an authorization letter from the state D.O.T. or the county D.O.T. is required.
3) One lane of traffic shall be maintained open at all times. Construction work shall be limited to time between 9:00 a.m. and 4:00 p.m.
4) The contractor shall furnish traffic control devices and certified personnel to direct traffic, if required.
5) The above requirements may be altered with the written approval of the department in extenuating circumstances.
6) Assuming that a road bore has been attempted and failed, and that the contractor has received permission to open cut a road, pavement replacement shall adhere to the following guidelines:
(a) Removing and replacing pavement shall consist of removing the type of pavement and base encountered, and replacing same to its original shape, appearance and riding quality, in accordance with the detailed plans. Where possible, all pipe under existing paved driveways will be either free bored or installed in casing.
Free bores under driveways will be made with ductile iron pipe. Casing will be required where the installation is under any roadway. Carrier pipe shall be ductile iron pipe.
(b) Concrete pavement shall be replaced with pavement of a thickness equal to that removed, or six inches for driveways and eight inches for roads, whichever is thicker. The concrete shall meet the specifications of the D.O.T. for concrete paving.
(c) Where bitumastic paving is replaced, a base course of 3,000 psi concrete shall be placed over the ditch line. The concrete shall be six inches thick for driveways and parking lots and eight inches thick for public roads. The top of this base course shall be left with a rough float finish 11
/2 inches below the surface of the existing paving. After the concrete has attained its strength, a tack coat of AC-15 or equal shall be applied at the rate of 0.25 gallons per square yard, and a plant mix surface course applied over this, and finished off level with existing pavement.
(d) Unless otherwise directed in writing, all pavement shall be removed to a width of the trench plus 12 inches on each side as shown on the detailed drawings. Under normal circumstances, the maximum allowable trench width shall be the nominal diameter of the pipe plus 24 inches.
7.4.16 Standard detailed drawings. Installation of sewer mains, service laterals, manholes, casings, cleanouts, etc., shall be made in accordance with the standard detailed drawings in these regulations.
7.4.17 Clean-up.
1) The contractor shall remove all unused materials, excess rock and earth, and all other debris from the construction site as closely behind the work as practicable. All trenches shall be backfilled and tamped before the end of each day's work.
2) Prior to requesting the final inspection, the contractor shall do the following:
(a) Remove and dispose of in an acceptable manner all shipping timbers, shipping bands, excess materials, broken material, crates, boxes and any other material brought to the job site.
(b) Repair or replace any work damaged by the sewer line construction.
(c) Regrade and smooth all shoulder areas disturbed by the sewer line construction.
(d) All easement areas shall be cleared of trees, stumps and other debris and left in a condition such that the easement can be maintained by bush-hog equipment.
(e) All shoulders, ditches, culverts and other areas impacted by the sanitary sewer construction shall be at the proper grades and smooth in appearance.
(f) All manhole covers shall be brought to grade.
(g) A uniform stand of grass or mulch for erosion protection, as defined in the Manual for Erosion and Sediment Control in Georgia is required over all construction easements and sanitary sewer easements prior to the department's acceptance of the sanitary sewer.
7.4.18 Barricades. The contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient red lights, danger signals and necessary precautions for the protection of the work and the safety of the public. Streets closed to traffic shall be protected by effective barricades on which shall be placed acceptable warning signs. Barricades shall extend completely across the street that is to be closed, and shall be illuminated at night by lights not farther than five feet apart, and lights shall be kept burning from sunset to sunrise.
7.4.19 Grassing.
1) All areas outside structures along pipelines where the earth is disturbed shall be grassed. After the soil has been properly prepared, the seed shall be planted. After the seeds have been planted, the moisture content of the soil shall be maintained at the optimum amount to insure germination of the seed and growth of the grass.
2) Immediately after the initial watering of seeded areas, the contractor shall apply a mat of hay or rye, wheat or oat straw over the area at a uniform rate of not less than 11 /2
ton of mat to the acre. The minimum depth of the straw shall be two inches and the maximum depth three inches. After placing mat or hay or straw, emulsified asphalt shall be sprayed over the mat at a uniform rate of 0.15 gallon per square yard. After the grass has shown a satisfactory growth (approximately 30 days after the planting), nitrate of soda shall be applied at a uniform rate of 100 pounds per acre, followed by sufficient water to dissolve the fertilizer.
3) The contractor shall do all maintenance work necessary to keep all planted areas in satisfactory condition until the work is finally accepted. This shall include mowing, repairing washed that occur, reseeding, and water as required to produce a healthy and growing stand of grass. Mowing will be required to remove tall and obnoxious weeds before they go to seed.
4) It is the intent of these specifications to produce a stand of grass that is alive and growing, without any bare spots larger than one square foot. The contractor shall repeat all work, including any plowing, fertilizing, watering and seeding as necessary to produce a satisfactory stand.
7.5 Inspection and tests.
7.5.1 General.
1) All lines designed to operate as gravity sanitary sewers and all force mains shall be successfully tested. Tests of installed piping shall be completed as described in the following sections.
2) All piping to be tested must satisfactorily comply with these tests before being eligible for acceptance.
3) These tests must be performed in the presence of the department's inspectors or designees in order for the test to be accepted as valid.
7.5.2 Concealed work. The department's inspectors may direct that the contractor notify the department and receive inspection approval prior to concealing certain work such as manhole foundations, pipe bedding, wyes, bends, service laterals or other appurtenances.
7.5.3 Minimum tests. All new gravity sewer lines constructed will be tested for infiltration, exfiltration and deflection. Flexible pipe sewers (PVC) shall be subjected to the Mandrel Test.
The sewer lines may be televised if the department's inspectors cannot see through the line properly or suspects that the joints may be offset or broken. Force mains will be subjected to a pressure/leakage test. Slopes of sewer mains that are close to minimum grade will be checked to insure cleansing velocity. The department may require manholes to be subjected to a vacuum test to check potential infiltration. The backfill in the trench above the pipeline will be subjected to compaction tests as detailed below. Any defects located during testing must be corrected before construction of the project may proceed. All costs associated with testing will be paid by the developer. Tests will be performed as follows:
1) Measurement of infiltration.
(a) The contractor shall furnish an adequate number of plugs of the proper size and acceptable weirs to measure infiltration into the system. Measurements of flow shall be performed on any lines with a visible flow of water.
(b) In no case will an infiltration rate of greater than 100 GPD per inch diameter per mile of pipe be allowed. Also, any visible or audible leak must be dug up and repaired. Any increase in flow between two adjacent manholes must be corrected.
2) Exfiltration test (low air pressure test).
(a) After completing backfill of a gravity sewer line section, conduct a low pressure air test of all pipe constructed, using methods and devices acceptable to the department. Perform such test using the following general procedures:
i. Temporarily plug line segment between two manholes using plugs having air tight fittings through which low pressure air can be introduced into the pipe segment being tested.
ii. Introduce low pressure air into the test pipe segment until the internal air pressure reaches 4.5 psig above ground water pressure, if any.
iii. Wait at least two minutes for air temperature in the test segment to stabilize while internal air pressure remains no less than 3.5 psig above ground water pressure.
iv. Bleed internal air pressure to exactly 3.5 psig above ground water pressure.
v. Accurately determine the elapsed time for internal pressure to drop to 2.5 psig above ground water pressure.
vi. The air test is acceptable if elapsed time is no less than shown by the following table:
Pipe Diameter (in inches) Seconds per 100 feet of Pipe Pipe Diameter (in inches) Seconds per 100 feet of Pipe 6 17 30 85 8 23 36 102 10 28 42 119 12 34 48 136 15 43 54 153 18 51 60 170 21 60 66 187 24 68 72 204
(b) Air leakage time is based on pipe being damp. If pipe and joints are dry, dampen line if helpful in meeting air test time requirement.
(c) Permanently correct excessive leakage determined by air testing, and repeat operations until the inspector witnesses a successful test on each line segment.
Note: Upon request, the department may allow substitution of a water exfiltration test in lieu of the low air pressure test. If used, the exfiltration test will be conducted with a minimum water head of two feet above the groundwater table and the allowable exfiltration will be limited to 100 GPD per inch diameter per mile of pipe.
3) Deflection test.
(a) Every section of sewer line shall be visibly checked for deflection. A passing section shall show a full circle when observed from one end. This may be done using mirrors to reflect sun light or by using lamps. Any section that fails this visual test shall be further checked as follows:
The section shall have water run through it sufficient to fill any sags that may exist. Then it shall have a television camera pulled through it to check for sags.
Any sag holding more than one inch of water will require that the pipe be removed and replaced to proper grade after which the section shall be televised again to verify correction.
4) Mandrel test for flexible pipe (PVC).
(a) All PVC gravity sewer mains shall be subjected to the Mandrel Test. The procedure for testing flexible pipe for maximum allowable deflection shall be generally as follows. See ASTM specifications for mandrel dimensions and more details.
(b) Completely flush the line making sure the pipe is clean of any mud or trash that would hinder the passage of the mandrel.
(c) During the final flushing of the line, attach a floating block or ball to the end of the mandrel pull rope and float the rope through the line. (A nylon ski rope is recommended)
(d) After the rope is threaded through the line, connect the pull rope to the mandrel and place the mandrel in the entrance of the pipe.
(e) Connect a second rope to the back of the mandrel. This will enable the mandrel to be retrieved if excessive deflection is encountered.
(f) Draw the mandrel through the sanitary sewer line.
(g) An increasing resistance to pull is an indication of excessive deflection. If this occurs mark the rope to note the location. Televise the sanitary sewer section to identify the extent of the problem and develop a plan, subject to department approval, for correcting the problem.
(h) Retest after correcting the problem.
5) T.V. inspection. In the event that the inspector cannot see through the line properly or conditions cause him to suspect that the line may be settled or broken or that the joints may not be made properly, he may direct that a T.V. camera be passed though the line.
A video tape of the inspection will be made. Any discrepancies noted such as sagged pipes, broken pipes, bad joints, etc., will be dug up and will be corrected. Internal grouting to repair new lines will not be allowed. After connection of the discrepancies, the line will be reinspected.
6) Compaction testing.
(a) Compaction testing will be required for sanitary sewers constructed in paved areas or where pavement is planned. A minimum of five tests per 1,000 feet of sanitary sewer shall be conducted at varying depths.
(b) The department may require additional compaction tests be conducted if any other areas where the department's inspectors suspect the backfill has not been compacted in accordance with these regulations. If any of these tests show failing results, then the failing backfill will be removed, re-compacted and re-tested, and one additional area will be tested as well.
7.5.4 Timing of service connections. In no circumstance shall any homes, buildings or plumbing fixtures be connected to the sanitary sewers until the sewers have been inspected and approved by the department.
7.6 Pre-treatment requirements for industrial wastewater.
Some industrial and other developments may be required to pre-treat sewage prior to discharge into the county's collection system. Requirements for pre-treatment will be determined on a case by case basis.
7.7 Other requirements.
No part of these regulations is intended to relieve the developer of his responsibility to comply with the requirements of the Georgia Department of Transportation, the Georgia Environmental Protection Division or other appropriate agencies.
7.8 Decentralized sewer systems, private sewer treatment facilities and community septic systems.
7.8.1 Private decentralized sewer systems. No privately owned and operated decentralized sewer systems (a/k/a package plants) shall be authorized for use in the unincorporated areas of Paulding County, Georgia.
7.8.2 Private sewer treatment plant facilities. No privately owned and operated permanent centralized sewer treatment facilities, including, but not limited to, wastewater treatment plants, wastewater water reuse facilities, oxidation pond systems, and slow rate land application facilities, shall be permitted or authorized in the unincorporated areas of Paulding County, Georgia. All such permanent centralized sewer treatment facilities, including, but not limited to, wastewater treatment plants, wastewater water reuse facilities, oxidation pond systems, and slow rate land application facilities, located within the unincorporated areas of Paulding County, Georgia shall be owned and operated by Paulding County, Georgia, by and through its board of commissioners.
7.8.3 Multi-user connections to single septic systems (community septic systems). No development shall be authorized to utilize and implement a system, whether public or private, whereby multiple users connect to a single multi-user septic field and/or system (community septic system) for the purpose of treating sanitary sewer wastewater in the unincorporated areas of Paulding County, Georgia.
7.8.4 Public decentralized sewer systems (package plants). Public decentralized sewer systems (a/k/a package plants) shall not be allowed for use for the treatment of sanitary sewer wastewater in the unincorporated areas of Paulding County, except under the following limited circumstances.
a. For use in commercial and/or industrial developments, an owner/developer may seek permission to install a decentralized sewer system/permanent package plant to be dedicated to the county if the following criteria are met:
1. The decentralized sewer system/package plant shall only be allowed in instances where public sanitary sewer connection is not reasonably available to the area in the foreseeable future. The availability of the connection to public sanitary sewer is in the discretion of the Paulding County Public Works Department and/or its board of commissioners.
2. Paulding County, through its public works department, must approve the design, materials and site location of the decentralized sewer system/package plant. Prior to construction, the owner/developer must receive a signed notice to proceed and/or construction plan approval from Paulding County for the decentralized sewer system/package plant and related appurtenances.
3. All materials and specifications used for the connections and related appurtenances to the temporary decentralized sewer system/package plant shall be in conformity with the requirements for sanitary sewer system installation set forth in the Paulding County Development Regulations and the Paulding County Standard Details.
4. The construction of the decentralized sewer system/package plant and its related connections and appurtenances shall be subject to inspection and approval by Paulding County.
5. A separate warranty maintenance bond, which, except as provided herein, conforms to the form requirements for maintenance bonds set forth in article
13.2 of the development regulations shall be required. Provided however, the maintenance bond shall be for a minimum period of 36 months, (without a delineation for build-out) subject to renewal at Paulding County's discretion for an additional 18-month period, with the amount of the bond calculated as follows: $15.00 per linear foot of sanitary sewer lines connecting to the decentralized sewer system/package plant, plus an additional amount to be set by the Paulding County Public Works Department in the amount of no less than $25,000.00 and no more than $150,000.00 for the warranty and maintenance of decentralized sewer system/package plant.
6. The owner/developer and/or development shall be subject to the current published rates for sanitary sewer tap fees and the customary monthly rates for sanitary sewer usage.
7. Paulding County shall operate the decentralized sewer system/package plant;
provided however, the owner/developer shall be responsible for the costs associated with the operation until the decentralized sewer system/package plant is accepted for perpetual maintenance by Paulding County. Such costs shall be paid directly to Paulding County, Georgia.
8. The decision to approve such a system is completely discretionary. The owner/developer must submit an application for a decentralized sewer system/ package plant to the Paulding County Public Works Department. The public works department shall review the request and forward and application to the Paulding County Board of Commissioners for a final decision on the request.
9. Nothing in this ordinance is meant to relieve the owner/developer from meeting all Georgia E.P.D. requirements and receiving all necessary permits for a decentralized sewer system/package plant from the Georgia E.P.D.; provided however, such application for a decentralized sewer system/package plant to the Georgia E.P.D. may not be made until an approval for the construction and installation of the system has been granted by Paulding County, Georgia.
b. For use in residential developments, no permanent decentralized sewer systems/ permanent package plants of any kind shall be permitted.
c. For use in residential developments, owner/developer may seek permission to install a temporary decentralized sewer system/package plant to be dedicated to the county if the following criteria are met:
1. The temporary decentralized sewer system/package plant shall only be allowed in instances where public sanitary sewer connection is not reasonably available to the area within a two-year period. The availability of the connection to public sanitary sewer is in the discretion of the Paulding County Public Works Department and/or its board of commissioners. In the event it is determined that sanitary sewer may be available to the area in the future, but is projected at more than two years away, the temporary decentralized sewer system/ package plant shall not be allowed as the same shall be deemed a permanent system.
2. The owner/developer must submit a compelling reason why a temporary decentralized sewer system/package plant is necessary for the development.
3. Paulding County, through its public works department, must approve the design, materials and site location of the decentralized sewer system/package plant. Prior to construction, the owner/developer must receive a signed notice to proceed and/or construction plan approval from Paulding County for the decentralized sewer system/package plant and related appurtenances.
4. All materials and specifications used for the connections and related appurtenances to the decentralized sewer system/package plant shall be in conformity with the requirements for sanitary sewer system installation set forth in the Paulding County Development Regulations and the Paulding County Standard Details.
5. The construction of the decentralized sewer system/package plant and its related connections and appurtenances shall be subject to inspection and approval by Paulding County.
6. A separate warranty maintenance bond, which except as provided herein, conforms to the form requirements for maintenance bonds set forth in article
13.2 of the development regulations shall be required. Provided however, the maintenance bond shall be for a minimum period of 24 months, (without a delineation for build-out) or until such time as the system is removed and dismantled from the site due to the development's connection to public sanitary sewer, with the amount of the bond calculated as follows: $15.00 per linear foot of sanitary sewer lines connecting to the decentralized sewer system/package plant, plus an additional amount to be set by the Paulding County Public Works Department in the amount of no less than $25,000.00 and no more than $150,000.00 for the warranty and maintenance of decentralized sewer system/ package plant.
7. The owner/developer and/or development shall be subject to the current published rates for sanitary sewer tap fees and the customary monthly rates for sanitary sewer usage. No sewer tap fee credits shall be provided for the costs associated with the temporary package plant.
8. Paulding County shall operate the temporary decentralized sewer system/ package plant; provided however, the owner/developer shall be responsible for the costs associated with the operation of the temporary decentralized sewer system/package plant. Such costs shall be paid directly to Paulding County, Georgia.
9. Upon connection to the pubic sanitary sewer system becoming available, the owner/developer shall dismantle and remove the decentralized sewer system/ package plant from the site at its cost. The public works department shall notify the owner of the availability for connection to public sanitary sewer by written notice; the owner/developer must begin removal of the decentralized sewer system/package plant from the site and begin efforts to connect to public sanitary sewer system within 60 days of the notice.
10. The decision to approve such a temporary system is completely discretionary.
The owner/developer must submit an application for a temporary decentralized sewer system/package plant to the Paulding County Public Works Department.
the public works department shall review the request and forward and application to the Paulding County Board of Commissioners for a final decision on the request.
11. Nothing in this ordinance is meant to relieve the owner/developer from meeting all Georgia E.P.D. requirements and receiving all necessary permits for a temporary decentralized sewer system/package plant from the Georgia E.P.D.;
provided however, such application for a temporary decentralized sewer system/package plant to the Georgia E.P.D. may not be made until an approval for the construction and installation of the system has been granted by Paulding County, Georgia.
(Res. No. 05-16, § 1, 9-29-2005)
7.9 Sanitary sewer tap fees.
All sanitary sewer tap fees shall be paid to the water system per the current published rate for same. No persons, developments or entities shall be eligible to receive tap fee credits for sewer infrastructure constructed and installed in conjunction with a development or subdivision.
(Res. No. 06-28, § 5, 9-12-2006)
7.10 Paulding County Master Sanitary Sewer System Plan.
Incorporated herewith into these specifications shall be the 2006 Paulding County Master Sewer Plan adopted by the Paulding County Board of Commissioners on September 12, 2006, including its design specifications, infrastructure provisions, and sizing requirements for all sanitary sewer infrastructure servicing developments located within unincorporated Paulding County or connecting to the Paulding County Sanitary Sewer System.
(Res. No. 06-28, § 6, 9-12-2006)
ARTICLE 8 SITE GRADING, STORMWATER DETENTION, CULVERTS AND
PIPED DRAINAGE SYSTEMS REQUIREMENTS
8.1 Site grading.
8.1.1 General requirements.
1) Grading shall be done in accordance with the lines and grades shown on the approved construction plans.
2) Embankments shall be placed in uniform layers not to exceed a compacted thickness of six inches per layer and shall be compacted to a density of 95 percent of the maximum laboratory dry weight per cubic foot as determined by AASHTO Method T-99 in all areas where structures, parking lots and drives, streets, and utilities are to be placed. All other embankments are to be compacted to at least 85 percent.
3) The maximum slopes for cut or fill shall be 2:1 (two feet of horizontal run for each foot of rise or fall). The depth of cut referred to herein shall be the maximum cut or fill occurring in any one section of cut or fill. The slope of cut or fill shall be uniform throughout for each section of cut or fill except when the development control committee approves benching. When a cut is made in rock that requires blasting, the slope may be steeper if pre-splitting is employed and upon submission of a geotechnical report which substantiates the integrity of the rock in the steeper condition, subject to the review and approval of the development control committee.
4) While most soils in the area can be safely stabilized at a 2:1 slope, some soils exhibit a low shearing resistance and a low cohesiveness. These soils typically are micaceous silts and sandy soils with little or no clay. If the 2:1 slope shows evidence of shearing, noncohesiveness, sliding, or inability to maintain compaction, the slope shall be stabilized at 3:1 or by using such mechanical methods as needed (such as retaining walls or grow mats stapled in place) to maintain slope, height and integrity.
8.2 Stormwater detention.
8.2.1 Stormwater management report required.
1) Every project shall provide a stormwater management report prepared by a professional engineer currently registered in the State of Georgia. The purpose of this report shall be to formulate a plan to manage stormwater runoff so that stormwater runoff hazards are not created and existing runoff-related problems are not exacerbated, either upstream or downstream from or within the boundaries of the property being developed.
2) The stormwater management report shall include a written narrative and shall identify the locations and quantities of stormwater runoff entering and exiting the site for both pre- and post-developed conditions. Analysis of the off-site properties shall anticipate future development in addition to addressing existing conditions. It shall contain drainage area delineation maps and other exhibits at satisfactory scale and sufficient in quantity and scope to define the boundaries of the site relative to watercourses, drainage divides, drainage structures, and other pertinent features.
3) The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property.
The analysis shall focus on the portion of the drainage way immediately downstream from, the project. This area shall generally extend a flow distance of about one-half mile from the project's boundary line, but shall be longer for projects contributing relatively large amounts of runoff to the study area, and shorter for small runoff contributions. In all cases, the most critical downstream area investigation shall be conducted relative to existing and anticipated land uses on tracts that adjoin the project site.
8.2.2 Stormwater detention required.
1) If the stormwater management report indicates that adverse stormwater runoff is expected to result from the development of a property, that project shall be required to provide stormwater detention facilities. These detention facilities shall be designed so that their peak release rates, when combined with those of all detention bypass areas in the same basin, produce peak flow rates and flow velocities at the site's boundary line no greater than those which occurred at the same location for pre-developed conditions.
2) The following criteria shall be evaluated by the engineer preparing the stormwater management report, or the calculations and documents required may be performed and submitted by a registered land surveyor, licensed in the State of Georgia, and in determining whether or not detention should be required for any portion of any site:
(a) Existing land uses downstream.
(b) Anticipated future land uses downstream.
(c) Magnitude of increase in peak flows due to development.
(d) Presence of existing drainage problems.
(e) Capacity of existing and anticipated drainage systems.
(f) Creation of concentrated flows where none had occurred previously.
(g) Availability of feasible locations for detention facilities.
(h) Existing flows generated off-site that pass through the project site.
(i) Anticipated future flows generated off-site that pass through the project site.
(j) The nature of the receiving watercourse.
3) Stormwater detention facilities shall be required for any portion of any site for which development activities will result in increased flows, unless the registered professional engineer currently registered in the State of Georgia certifies and provides documentation supporting the conclusion to the development control committee that the following is true and correct as applicable:
(a) The nondetained, post-development runoff will leave the project site as sheet flow, and will not have an adverse impact upon downstream properties.
(b) The effect of detention would be to concentrate flows where sheet flow had occurred under pre-developed conditions, and any impact of increase sheet flows upon downstream properties would be less adverse than that which would result from the concentrated flows from a detention facility even if energy dissipation devices were employed.
(c) The runoff will flow directly into a floodplain without crossing off-site properties, and the runoff will constitute less than five percent of the total runoff in the watercourse at the point where the watercourse crosses the project site's downstream property line.
(d) The undetained flow will pass through downstream properties, in drainage easements obtained by the developer, to an existing detention facility that has been designed to manage the additional upstream property's runoff.
4) In the event that the professional engineer has concluded that stormwater detention may not be necessary as outlined in subsection 8.2.2 (c) above is anticipated, a pre-design conference with the development control committee shall be required before the submittal of plans. Fees shall be collected at the rate of $3,700.00 per impervious acre of the proposed project to be used for capital drainage improvements.
8.2.3 Detention design criteria; general.
1) All stormwater detention design calculations shall be certified by a professional engineer currently registered in the State of Georgia.
2) All stormwater detention facilities shall be designed to control the peak flow rates associated with storms having 2, 5, 10, 25, 50 and 100-year return frequencies.
3) A variety of methods of achieving stormwater-management goals shall be acceptable in providing detention facilities. The type of facility provided shall be based on the following criteria:
(a) The type of development for which the detention facility is being provided.
(b) The type of development which the detention facility is intended to protect.
(c) Volume of stormwater to be stored.
(d) Origin and magnitude of the flows to be managed.
(e) Topographic opportunities and limitations.
(f) Safety considerations.
(g) Maintenance requirements.
(h) Aesthetic considerations.
(i) Likelihood of facility operation interfering with access to public or private facilities.
(j) Proximity of facility to property lines, utilities, buffers, etc.
(k) Similar site-specific constraints.
4) Detention facilities may be of any of the following types, and two or more types may be used in combination with one another:
(a) Normally-dry basins, whether excavated or created by damming a natural drainage feature, or a combination of both methods.
(b) Lakes and ponds, whether excavated or created by damming a natural drainage feature, or a combination of both methods.
(c) Other types of facilities shall be approved by the community development department.
5) Reservoir routing methods shall be used for all detention facility design.
6) The detention methodology required for any given project shall conform to standard engineering practices. It shall be the responsibility of the design engineer to use the correct coefficients and applications that will result in compliance with the requirements of this article and the intent of these regulations.
7) Runoff coefficients used for pre- and post-development conditions for the rational method shall be consistent with standard engineering practices. For the SCS method the runoff curve numbers found in the Manual for Erosion and Sediment Control in Georgia shall be used. For any stormwater analysis, the composite "C" (rational method) or CN (SCS Method) used for pre-developed conditions shall not exceed 0.3 or 66, respectively, unless prior approval has been obtained through the community development department.
8) If either the rational method or the SCS method is used for detention design, calculations shall be provided showing how all times of concentration or lag times were computed, both for pre- and post-developed conditions. Likewise, adequate support must be provided for all composite runoff coefficients or curve numbers used.
9) If a computer program is used for detention design, including generating and routing hydrographs, the output from the program shall be summarized in the stormwater management report, and the name and version of the program shall be indicated.
Computer output sheets may be attached to the report if desired by the design engineer or if requested by the community development department.
10) The design of every detention facility of any type shall consider the effects both of inflows in excess of those the facility is designed to accommodate and of malfunctioning of the primary outlet system. A safe path for overflow condition flows shall be provided.
8.2.4 Detention facility location criteria.
1) Residential detention facilities shall be located outside the boundaries of a permitted building lot. Access shall be provided via a graded and grassed roadway not less than 12 feet wide and minimum grade practical within a 25-foot wide deeded property strip under exclusive control of Paulding County. Access shall not occur on any permittable building lot.
2) For purposes of these regulations, a detention facility shall be deemed to consist of the area within the maximum design ponding limits, the dam (if one) including all embankment slopes and wall footings (if applicable), primary and emergency outlet works, any drainage and access easements, and any energy dissipation devices.
3) Detention facilities, to the greatest extent feasible, shall be located so as to minimize the amount of flow generated on-site that by-passes the facility.
4) No portion of any detention facility shall disturb any required buffer, landscape strip, or tree protection area.
5) The 100-year ponding limits of a detention facility shall not encroach upon a neighboring lot.
6) Detention facilities may encroach upon utility easements or rights-of-way, upon receipt by the development control committee of written permission from both the property and utility owners.
7) A detention facility may be located within or encroach upon a floodplain in accordance with article 10 of these regulations.
8) The detention facility shall be surrounded by a level 15-foot access road which may be easily traversed by vehicular traffic.
8.2.5 Residential detention facility access requirements. Deeded property at least 25 feet in width shall be required to provide access to all residential detention facilities from a public street. This access shall be cleared, grubbed and/or graded so that it can be utilized by rubber-tired construction vehicles. Its location shall be such as to minimize the amount of grading required.
8.2.6 Residential detention facility maintenance.
1) The detention storage capacity or function of any detention basin, pond or other impoundment, whether natural or manmade, shall not be removed or diminished without the express approval of the community development department.
2) A maintenance fee of $500.00 per residential detention facility shall be paid to Paulding County prior to final plat approval. All residential detention facilities shall become the responsibility of the county for maintenance upon the county's approval of the final plat; its approval of said detention facilities; and the expiration of the maintenance bond required in article 13 of these regulations.
8.2.7 Detention facility construction standards.
1) Stormwater detention facilities shall be constructed in accordance with plans reviewed and approved by the community development department, and shall be in place and inspected prior to the initiation of other improvements. If the detention facility is planned to be a lake, temporary detention facilities shall be provided and shall remain in place until such time as the lake has become effective in providing stormwater management.
2) Within a detention basin, all stumps are to be cut flush with the ground or removed and all debris is to be removed below the ten-year ponding elevation. Trees or shrubs may be allowed to remain below the ten-year ponding elevation only upon certification of the survivability of the vegetation.
3) Detention slopes that are disturbed are to be grassed and the ground cover within the basin shall be well established with all exposed areas covered prior to the end of the maintenance period. All slopes shall be 3:1 maximum.
4) The developer shall place a fence around detention facilities, which fence shall be a minimum four foot high fence of durable material with a 12-foot wide access gate.
8.2.8 Detention facility engineer's certification and record drawings. A certified record survey of each detention facility shall be prepared by a land surveyor or registered professional engineer currently registered in the State of Georgia. A certified record drawing of the facility shall be prepared based upon this survey. Based on the actual parameters established on the record drawing, an addendum to the stormwater management report shall be prepared that demonstrates that the facility, as constructed, complies with the requirements of these regulations. The amended stormwater management report shall be certified by a professional engineer currently registered in the State of Georgia.
8.3 Culverts and piped drainage systems.
8.3.1 Drainage improvements required. Stormwater conveyance facilities, which may include but are not limited to culverts, storm drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutters, swales, channels, and ditches, shall be provided for the protection of public rights-of-way and private properties adjoining projects sites and/or public rights-ofway.
8.3.2 Standard specifications. Unless otherwise specifically set forth herein or in the Paulding County Standard Details, all of the materials, methods of construction, and workmanship for the work covered in reference to stormwater conveyance facility construction shall conform to the most recent Standard Specifications of the Georgia Department of Transportation (Georgia DOT).
8.3.3 Design criteria; general.
1) All stormwater conveyance facility design calculations shall be certified by a professional engineer currently registered in the State of Georgia.
2) Stormwater flows from drainage areas up to 200 acres in size may be calculated using the Rational Method. Flows from drainage areas between ten and 2,000 acres in size may be calculated using the SCS Method or other approved methods. Flows for drainage areas larger than 2,000 acres in size must be calculated using published FEMA data or USGS Regional Regression Analysis.
3) Runoff coefficients used for pre- and post-development conditions for the rational method shall be consistent with standard engineering practices. For the SCS method the runoff Curve Numbers found in the Manual for Erosion and Sediment Control in Georgia; shall be used. For any stormwater analysis, the composite "C" (rational method) or CN (SCS Method) used for pre-developed conditions shall not exceed 0.3 or 66, respectively, unless prior approval has been obtained through the community development department.
8.3.4 Design criteria; culverts.
1) Culverts (structures designed to convey water from one side of a public right-of-way to the other and carry the runoff from a contributing drainage area) shall be designed to pass the peak flow associated with a 100-year storm with at least one foot of freeboard between the 100-year ponding elevation and the top of the roadway shoulder, without rising the 100-year flood elevation on upstream properties, and in accordance with article 10 of these regulations.
2) All pipes are to be designed for inlet and outlet control conditions. Appropriate charts and tables are to be placed on the plans.
3) The 100-year ponding limits above the culvert shall be shown on the construction plans and on the final plat (if applicable).
4) The minimum allowable culvert diameter shall be 18 inches.
5) Culvert design is to be in accordance with the methods contained in the Georgia DOT Drainage manual for highways, chapter 7, and shall include a thorough analysis of both inlet and outlet control structures.
8.3.5 Piped collection systems.
1) The design (initial pipe sizing and profile design) of piped collection systems required under 8.3.1 herein shall be based upon conveyance of the peak flows associated with a 100-year storm with the hydraulic grade line being at or below the structure throat throughout the system.
2) Based on the analysis of 100-year conditions, the preliminary design shall be revised where necessary to produce a final design for which the likelihood of dwelling flooding, major property damage, or substantial public access and/or utility interruption shall be less than one chance in 100 years.
3) Catch basins and/or drop inlets shall be designed by the developer's engineer or registered surveyor to state highway standards and subject to final approval by the community development department. This chart may be used for street water in lieu of calculations per structure:
500 feet on grades up to seven percent 400 feet on grades from seven percent to ten percent 250 feet on grades over ten percent
4) Catch basins shall be spaced so that the spread in the street for a 50-year design flow shall not exceed six feet, as measured from the face of the curb. Gutter spread calculations are required if the above chart is not used.
5) Complete flow, velocity, and hydraulic grade line computations, shall be provided for all portions of a piped collection system. Hydraulic grade lines shall be shown on the storm drainage profiles contained with the development plans for the 100-year storm.
6) Should a bridge ever be required it must meet all Georgia DOT standards.
7) Inverts are required in all structures, leaving no standing water. All inverts are to be constructed of grout or concrete.
8) All structures are to be precast concrete or brick construction in accordance with Georgia DOT standard details.
9) On final plats, problem lots will require a residential drainage plan and house location plan prior to obtaining a building permit. Problem lots are to be determined by the community development department. Residential drainage plans shall be drawn at one inch equals 50 feet minimum with two-foot existing and proposed topography. In addition, for each problem lot, an as-built survey of the dwelling, building or structure shall be provided to the community development department prior to final inspections and the issuance of a certificate of occupancy. In the event the as-built survey shows the dwelling does not have proper setbacks, flood standards set forth herein article 10, floor elevations or other discrepancies, the community development department may deny the issuance of the certificate of occupancy.
10) Maximum continuous length of pipe shall be 300 feet.
11) Before any traffic over a storm drain is allowed, the developer shall provide an adequate depth and width of compacted backfill to protect the structure from damage or displacement. Any debris or silt that restricts the flow through a pipe shall be removed by the developer as often as necessary to maintain drainage. All pipe structures shall be cleaned before the work is accepted. Any damage or erosion shall be repaired or corrected before final acceptance by the county.
12) Trench construction for storm drainage pipe shall be in accordance with State Highway Standards 1030D (or most current).
13) Storm drainage pipe shall be bedded in No. 57 gravel, if firm soil is not available.
14) A certification of the pipe specifications for each pipe shall be required before installation.
15) Storm drainage pipes shall be sloped so as to maintain a minimum velocity of three FPS (feet per second) so that sediment will not collect.
16) State Highway Standard 1030D (or most current) shall be used in determining class (concrete) or gauge of pipe underfill, method of backfilling and pipe installation.
8.3.6 Energy dissipation; piped systems and culvert.
1) Energy dissipation devices, such as splash pads, rip-rap, stilling basins, etc., shall be provided at the outlet of every culvert and piped collection system. (Please refer to the Manual for Erosion and Sediment Control in Georgia.)
2) Energy dissipation devices shall be located entirely within the project site, and shall not encroach upon any required buffer.
3) When uniform, graded stone rip-rap is used for energy dissipation, ultraviolet resistant filter fabric (200-pound test) shall be used between the stone layers.
8.3.7 Minimum pipe specifications.
1) Galvanized corrugated steel pipe and pipe arches shall conform to the requirements of Type I or II pipe per AASHTO M-36 for the specified dimensions and thickness.
Corrugated steel pipe shall have a minimum of two ounces per square foot of zinc coating, complying with AASHTO M-218.
(a) All corrugated galvanized pipe located within a street right-of-way, drainage easement, or detention facility shall be asphalt coated. All corrugated galvanized pipe that will carry a live stream, within a street right-of-way, drainage easement, or in a detention facility shall be either 1) asphalt coated with a paved invert per AASHTO M-190, Type C, or 2) asphalt coated with a concrete lining.
The lining shall be plant applied so as to produce a homogeneous nonsegregated lining throughout. The lining shall have a nominal thickness of 1
/4-inch above the crest of the corrugations.
(b) See the standard details for minimum acceptable combinations of gages, diameters, and corrugation configurations for corrugated steel pipe and pipe arches (Georgia DOT 1030-D).
(c) Each end of each pipe section, to be joined by a coupling band, shall have a minimum of two annular corrugations. Coupling bands shall be so constructed as to lap on an equal portion of each of the pipe sections to be connected. The connecting bands shall have a minimum of two annular corrugations and shall fully engage, over the entire pipe periphery, one corrugation on each pipe end.
Bands shall be fabricated from the same material as is the pipe, and the gauges shall be as specified in Section 9.2 of AASHTO M-36.
(d) Gaskets may be required as determined by the department in the field and shall be either sleeve type or 0-ring type, and shall meet the requirements for gaskets as specified in Section 9.3 of AASHTO M-36.
2) Reinforced concrete pipe shall be required at the entrance of any subdivision containing more than 100 lots. Reinforced concrete pipe shall be in not less than eight foot joint lengths. All joints shall be bell and spigot type, using an 0-ring gasket conforming to ASTM C-443. Pipe shall be manufactured in accordance with AASHTO M-170 and/or ASIM C-6. Class of pipe and wall thickness shall be in accordance with 1030-D, Georgia DOT specification, Table No. 1.
3) Aluminized steel-coated pipe shall comply with AASHTO M-274 for the coating and AASHTO M-36 for the pipe fabrication. Aluminum alloy pipe shall comply with AASHJ M-196 for material and fabrication.
(a) See the standard details for the minimum acceptable combinations of gages, diameters, and corrugation configurations for corrugated aluminum pipe and pipe arches, and for corrugated aluminized steel pipe and pipe arches (Georgia
DOT 1030-D).
(b) Each end of each pipe section, to be joined by a coupling band, shall have a minimum of two annular corrugations. Coupling bands shall be so constructed to lap on an equal portion of each of the pipe sections to be joined. The connecting bands shall have a minimum of two annular corrugations and fully engage, over the entire pipe periphery, one corrugation on each pipe. Bands shall be fabricated from the same material as the pipe. The minimum band gauges for aluminum pipe and aluminized pipe shall be as specified in AASHTO M-196, Section 19, and AASHTO M-36, Section 9, respectively.
(c) Gaskets may be required as determined by the department in the field, and shall be either sleeve type or 0-ring type and shall meet the requirements for gaskets as specified in AASHTO M-36, Section 9.3.
4) Structural plate drainage structures shall conform to the following specifications:
(a) Corrugated steel structural plate pipe, pipe arches, and arches shall consist of galvanized plates, bolts and nuts of the size, shape and thickness as shown on the approved plans. These structures shall conform to the requirements of AASHTO M-167.
(b) Corrugated aluminum alloy structural plate pipe, pipe arches and arches shall consist of aluminum plates and galvanized bolts and nuts of the size, shape and thickness as shown on the approved plans. These structures shall conform to the requirements of AASHTO M-219.
8.3.8 Pipe length.
1) Culverts carrying live streams shall extend to where the crown of the pipe intersects the roadway slope.
2) Pipes that do not carry live streams shall extend at least 50 feet beyond the front building setback lines, and may be required to extend farther where necessary to provide an adequately protected building site on the property. In nonresidential subdivisions, these pipes may temporarily end at the right-of-way line, but shall be extended as part of a subsequent development permit approved for the individual site.
8.3.9 Pipe installation. Reinforced concrete pipe, corrugated steel pipe, corrugated aluminum pipe and corrugated aluminized steel pipe shall be bedded and backfilled in the same manner.
1) Bedding. All pipe structures shall be placed on stable earth or No. 57 rock, the characteristics of which would be expected to provide long-term stability. In all live stream pipe installations, in areas of low bearing soils or nonuniform foundations, in areas where rock is encountered at the foundation level, or in other locations where conditions warrant, a minimum of six inches of No. 57 bedding is required.
2) Geotextiles or geogrids may also be required by the department in problem areas.
3) Backfilling. Backfill on all pipe installations shall be constructed using foundation backfill material Type I or Type II, as specified in Section 812.01 and 812.02 respectively, in GA. DOT Standard specifications. These materials shall be placed in layers of not more than six inches loose. Compaction of these materials shall be accomplished by hand tamping or machine tamping. Required compaction levels are as follows:
(a) Backfill within all street rights-of-way shall be compacted to 95 percent maximum density, tested using the AASHT0 Method T-99.
(b) Backfill in all other areas shall be compacted to 95 percent maximum density, tested using the AASHT0 Method T-99.
4) Construction loads and minimum covers. If drainage pipe is installed prior to the completion of grading, a minimum of four feet of fill should be provided here needed to adequately protect the drainage structure during the land development phase, unless the structure itself is designed to withstand the anticipated live load during construction.
8.3.10 End finish.
1) Headwalls or other end treatments are required on all culverts (except under residential driveways) and at the outlet of all piped collection systems.
2) Headwalls are to be precast concrete, stone masonry with reinforced concrete footings, or poured-in-place, reinforced concrete with reinforced concrete footings.
3) End treatments that conform to the slope may be masonry, pre-cast concrete end sections, reinforced poured-in-place slope collars, or grouted rip-rap. Concrete end sections shall conform to Georgia DOT Specification 1120. Concrete headwalls are required on all pipes.
8.3.11 Junction boxes and catch basins. Junction boxes having access to the pipe shall be constructed to meet the requirements of the Georgia Department of Transportation standards (or most current). All pipe junctions shall have junction boxes. Junction boxes and catch basins shall have metal manhole frames and lids for access.
8.3.12 Other structures. Natural bottom arches and box culverts may be used in accordance with the latest Standard Specifications of the Georgia DOT.
8.4 Surface drainage.
8.4.1 Design standards.
1) All new proposed channels shall be designed to carry at least the 100-year storm with one foot of freeboard.
2) Transition channels shall be provided at the inlet and outlet ends of all culverts and pipe systems, unless otherwise provided herein.
3) The maximum flow velocity at the project site's downstream property line shall not exceed the pre-developed velocity.
4) In cases of potential erosion due to irregular channel alignment, extreme velocities, or excessive slopes, a paved ditch shall be required, unless otherwise directed by the community development department.
5) The cross-sectional shape of channels shall be as found in the Manual for Erosion and Sediment Control in Georgia. "V" shaped cross-sections are not permitted in grassed channels.
6) If the channel will be affected by backwater from culverts, bridges, other structures or floodplains, backwater elevations shall be shown in profiles of the channel.
8.4.2 Construction standards.
1) The channel shall be shaped to the dimensions specified on the approved plans and shall be free of overfalls, gullies or other irregularities.
2) Channels in fills shall be lined.
3) Protective cover in grassed channels shall be installed as soon as the earthwork is completed.
ARTICLE 9 SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL*
9.1 Definitions.
The following definitions shall apply in the interpretation and enforcement of this article unless otherwise specifically stated:
1) Best management practices (BMP's): These include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
2) Board: The board of natural resources.
3) Buffer: The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
4) Certified personnel: A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
5) Coastal marshlands: Shall have the same meaning as in O.C.G.A. 12-5-282.
6) Commission: The Georgia Soil and Water Conservation Commission (GSWCC).
7) CPESC: Certified professional in erosion and sediment control with current certification by EnviroCert, Inc., which is also referred to as CPESC or CPESC, Inc.
8) Cut: A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface. Also known as excavation.
9) Department: The Georgia Department of Natural Resources (DNR).
10) Design professional: A professional licensed by the State of Georgia in the field of:
engineering, architecture, landscape architecture, forestry, geology, or land survey-ing; or a person that is a certified professional in erosion and sediment control (CPESC) with a current certification by EnviroCert, Inc. Design Professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure.
11) Director: The director of the environmental protection division of an authorized representative.
12) District: The Coosa River Soil and Water Conservation District.
13) Division: The environmental protection division (EPD) of the department of natural resources.
14) Drainage structure: A device composed of a virtually nonerodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes.
15) Erosion: The process by which land surface is worn away by the action of wind, water, ice or gravity.
16) Erosion, sedimentation and pollution control plan: A plan required by the Erosion and Sedimentation Act, O.C.G.A. Chapter 12-7, that includes, as a minimum protections at least as stringent as the state general permit, best management practices, and requirements in section 9.3.3 of this article.
17) Fill: A portion of land surface to which soil or other solid material has been added;
the depth above the original ground surface or an excavation.
18) Final stabilization: All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the plan (uniformly covered with landscaping materials in planned landscape areas) or equivalent permanent stabilization measures as defined in the manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction.
19) Finished grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
20) Grading: Altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition.
21) Ground elevation: The original elevation of the ground surface prior to cutting or filling.
22) Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices as described in section 9.2.5).
23) Larger common plan of development or sale: A contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, plan means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.
24) Local issuing authority: The governing authority of any county or municipality which is certified pursuant to subsection (a) O.C.G.A. § 12-7-8.
25) Metropolitan River Protection Act (MRPA): A state law referenced as O.C.G.A.
§ 12-5-440 et seq., which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins.
26) Natural ground surface: The ground surface in its original state before any grading, excavation or filling.
27) Nephelometric turbidity units (NTU): Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.
28) NOI: A notice of intent form provided by EPD for coverage under the state general permit.
29) NOT: A notice of termination form provided by EPD to terminate coverage under the state general permit.
30) Operator: The party or parties that have:
(a) Operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or
(b) Day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.
31) Outfall: The location where stormwater in a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water.
32) Permit: The authorization necessary to conduct a land-disturbing activity under the provisions of this article.
33) Person: Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the State of Georgia, any interstate body or any other legal entity.
34) Phase or phased: Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site.
35) Project: The entire proposed development project regardless of the size of the area of land to be disturbed.
36) Properly designed: Designed in accordance with the design requirements and specifications contained in the Manual for Erosion and Sediment Control in Georgia (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the manual as approved by the commission up until the date of NOI submittal.
37) Roadway drainage structure: A device such as a bridge, culvert, or ditch, composed of a virtually nonerodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
38) Sediment: Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by air, water, ice, or gravity as a product of erosion.
39) Sedimentation: The process by which eroded material is transported and deposited by the action of water, wind, ice or gravity.
40) Soil and water conservation district approved plan: An erosion, sedimentation and pollution control plan approved in writing by the Coosa River Soil and Water Conservation District.
41) Stabilization: The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.
42) State general permit: The National Pollution Discharge Elimination System (NPDES) general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251, et seq., and subsection (f) of Code Section 12-5-30.
43) State waters: Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of the Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.
44) Structural erosion, sedimentation and pollution control practices: Practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss.
Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures and sediment traps, etc. Such practices can be found in the publication manual for Erosion and Sediment Control in Georgia.
45) Trout streams: All streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A.
§ 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3-6 at www.epd.georgia.gov. Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown or brook trout.
Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.
46) Vegetative erosion and sedimentation control measures: Measures for the stabilization of erodible or sediment-producing areas by covering the soil with:
(a) Permanent seeding, sprigging or planting, producing long-term vegetative cover; or
(b) Temporary seeding, producing short-term vegetative cover; or
(c) Sodding, covering areas with a turf of perennial sod-forming grass.
Such measures can be found in the publication Manual for Erosion and Sediment Control in Georgia.
47) Watercourse: Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
48) Wetlands: Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018)
9.2 Exemptions.
This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following:
1) Surface mining, as the same is defined in O.C.G.A. § 12-4-72, The Georgia Surface Mining Act of 1968;
2) Granite quarrying and land clearing for such quarrying;
3) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;
4) The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A.
§ 12-7-6 and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of the Georgia Water Quality Control Act. In any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of subsection (b) of O.C.G.A. § 12-7-6 and the buffer zones provided by this paragraph shall be enforced by the local issuing authority;
5) Agricultural operations as defined in O.C.G.A. § 1-3-3, definitions, to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including, but not limited to, chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aqua culture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds;
6) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in section 9.3.3.1)(o) and 9.3.3.1)(p) of this article, no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;
7) Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture;
8) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, state waters excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by paragraphs 1) 2) 3)
4) 5) 6) 7) 9) or 10) of this section;
9) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the department of transportation, the Georgia Highway Authority, or the state road and tollway authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the department of transportation or the state road and tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1; except where the department of transportation, the Georgia Highway Authority, or the state road and tollway authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
10) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
11) Any public water system reservoir.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018)
9.3 Minimum requirements for erosion, sedimentation and pollution control using best management practices.
9.3.1 General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the NPDES general permit are not met. Therefore, plans for those land-disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of section 9.3.2 and 9.3.3. of this article. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this article and the NPDES general permit.
9.3.2 Minimum requirements/BMPs.
1) Best management practices as set forth in section 9.3.2 and 9.3.3 of this article shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with paragraph (2) of this subsection or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to subsection (f) of O.C.G.A.
12-5-30, the Georgia Water Quality Control Act . As used in this subsection the terms proper design and properly designed mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. 12-7-6 subsection (b).
2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to subsection (f) of O.C.G.A. 12-5-30, the Georgia Water Quality Control Act, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters.
The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.
3) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A.
§ 12-5-30(f), the Georgia Water Quality Control Act, for each day on which such failure occurs.
4) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur.
5) The LIA may set more stringent buffer requirements than stated in 9.3.3.1)(o) and 9.3.3.1)(p) in light of O.C.G.A. § 12-7-6 (c).
9.3.3 BMPs.
1) The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A.
§ 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:
(a) Stripping of vegetation, regarding and other development activities shall be conducted in a manner so as to minimize erosion;
(b) Cut-fill operations must be kept to a minimum;
(c) Development plans must conform to topography and soil type so as to create the lowest practical erosion potential;
(d) Whenever feasible, natural vegetation shall be retained, protected and supplemented;
(e) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;
(f) Disturbed soil shall be stabilized as quickly as practicable;
(g) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;
(h) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
(i) To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. 12-7-1 et seq.;
(j) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;
(k) Cuts and fills may not endanger adjoining property;
(l) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
(m) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;
(n) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in section 9.3.2.2) of this article;
(o) Except as provided in paragraph (p) and (q) of this subsection, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, or where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or where bulkheads and sea walls are installed to prevent shoreline erosion on Lake Oconee and Lake Sinclair; or along any ephemeral stream. As used in this provision, the term ephemeral stream means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events;
that has the channel located above the ground water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the Georgia Water Quality Control Act, shall remain in force unless a variance is granted by the director as provided in this paragraph. The following requirements shall apply to any such buffer:
1. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
2. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) Stream crossings for water lines; or (ii) Stream crossings for sewer lines; and
(p) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of Title 12, the Georgia Water Quality Control Act, except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams.
The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer:
1. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
2. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) Stream crossings for water lines; or (ii) Stream crossings for sewer lines.
(q) There is established a 25-foot buffer along coastal marshlands, as measured horizontally from the coastal marshland-upland interface, as determined in accordance with Chapter 5 of Title 12 of this title, the Coastal Marshlands Protection Act of 1970. and the rules and regulations promulgated thereunder, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, where an alteration within the buffer area has been authorized pursuant to O.C.G.A. § 12-5-286, for maintenance of any currently serviceable structure, landscaping or hardscaping, including bridges, roads, parking lots, golf courses, golf cart paths, retaining walls, bulkheads, and patios; provided, however, that if such maintenance requires any land-disturbing activity, adequate erosion control measures are incorporated into the project pans and specifications and such measures are fully implemented, where a drainage structure or roadway drainage structure is constructed or maintained; provided; however, that if such maintenance requires any landdisturbing activity, adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented, on the landward side of any currently serviceable shoreline stabilization structure, or for the maintenance of any manmade storm-water detention basin, golf course pond, or impoundment that is located entirely within the property of a single individual, partnership, or corporation; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. For the purposes of this paragraph maintenance shall be defined as actions necessary or appropriate for retaining or restoring a currently serviceable improvement to the specified operable condition to achieve its maximum useful life. Maintenance includes emergency reconstruction of recently damaged parts of a currently serviceable structure so long as it occurs within a reasonable period of time after damage occurs. Maintenance does not include any modification that changes the character, scope and serviceable shall be defined as usable in its current state or with minor maintenance but no so degraded as to essentially require reconstruction.
1. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat, and
2. The buffer shall not apply to crossings for utility lines that cause a width of disturbance of not more than 50 feet within the buffer, provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented.
3. The buffer shall not apply to any land-disturbing activity conducted pursuant to and in compliance with a valid and effective land-disturbing permit issued subsequent to April 22, 2014, and prior to December 31, 2015; provided, however, that adequate erosion control measures are incorporated into the project pans and specifications and such measures are fully implemented or any lot for which the preliminary plat has been approved prior to December 31, 2015 if roadways, bridges, or water and sewer lines have been extended to such lot prior to the effective date of this Act and if the requirement to maintain a 25-foot buffer would consume at least 18 percent of the high ground of the platted lot otherwise available for development provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented.
4. Activities where the area within the buffer is not more than 500 square feet or that have a Minor Buffer Impact as defined in Rule 391-3-7-.01(r) of the Rules and Regulations of the State of Georgia, provided that the total area of buffer impacts is less than 5,000 square feet are deemed to have an approved buffer variance by rule. Bank stabilization structures are not eligible for coverage under the variance by rule and notification shall be made to the division at least 14 days prior to the commencement of land-disturbing activities.
(r) Operators are required to control waste, such as discarded building materials, concrete truck washout, chemicals, litter and sanitary waste; that may cause adverse impacts to water quality at the construction site pursuant to 40 CFR Part 122.34(4)(ii)(C).
9.3.4 Additional requirements. Nothing contained in O.C.G.A. 12-7-1 et seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in section
9.3.2 and 9.3.3. of this article. Paulding County stream buffer requirements are included in Article 12.
9.3.5 Other. The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018)
9.4 Application and permit process.
9.4.1 General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding it. They shall consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and any other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit.
9.4.2 Application requirements.
1) No person shall conduct any land-disturbing activity within the jurisdictional boundaries of Paulding County without first obtaining a permit from the community development department to perform such activity and providing a copy of notice of intent submitted to EPD if applicable.
2) The application for a permit shall be submitted to the community development department and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in section 9.3.3 of this article. Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land-disturbing activity proposed will be carried out in such a manner that the provisions of section 9.3.2 and 9.3.3 of this article will be met.
Applications for a permit will not be accepted unless accompanied by three copies of the applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7-.10.
3) Local permitting fees are included in article 14.
4) In addition to the local permitting fees, fees will also be assessed pursuant to paragraph (5) subsection (a) of O.C.G.A. 12-5-23, provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to subsection (a) of O.C.G.A. 12-7-8 half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to paragraph (9) or (10) of O.C.G.A. 12-7-17 shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
5) Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of a district to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by section 9.3.3.1)(o), 9.3.3.1)(p) and 9.3.3.1)(q) has been obtained, all fees have been paid, and bonding, if required as per section 9.4.2.7) have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.
6) If a permit applicant has had two or more violations of previous permits, this ordinance section, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit application.
7) The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
9.4.3 Plan requirements.
1) Plans must be prepared to meet the minimum requirements as contained in section
9.3.2 and 9.3.3 of this article, or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land-disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the Stakeholder Advisory Board created pursuant to O.C.G.A. § 12-7-20.
2) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the landdisturbing activity was permitted.
9.4.4 Permits.
1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.
2) No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required by section 9.3.3.1)(o), 9.3.3.1)(p) and 9.3.3.1)(q) are obtained, bonding requirements, if necessary, as per section 9.4.2.7) are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.
3) Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and any other ordinances relating to land development, as are applied to private persons and the division shall enforce such requirements upon the local issuing authority.
4) If the tract is to be developed in phases, then a separate permit shall be required for each phase.
5) The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
6) The LIA may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. 12-7-7(f)(1).
7) No permit shall be issued unless the applicant provides a statement by the Paulding County Tax Commissioner certifying all ad valorem taxes levied against the property have been paid.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018)
9.5 Inspection and enforcement.
9.5.1 Community development department.
1) The community development department will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities.
Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person.
The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article.
2) The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.
3) The community development department shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
4) No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
5) The district or the commission or both shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. 12-7-8(a). The districts or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
6) The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. 12-7-8(a).
Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. 12-7-7(e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division shall revoke the certification of the county or municipality as a local issuing authority.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018)
9.6 Penalties and incentives.
9.6.1 Failure to obtain permit for land-disturbing activity. If any person commences any land-disturbing activity requiring a land-disturbing permit as prescribed in this article without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.
9.6.2 Stop work order (SWO).
1) For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop-work order requiring that land-disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop-work order in lieu of a warning;
2) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop-work order; and
3) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
4) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the director or his or her designee. All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
9.6.3 Bond forfeiture. If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of section 9.4.2.7. The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
9.6.4 Monetary penalties.
1) Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty of at least $500.00 but not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any City Charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation.
Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article under county ordinances approved under this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.
2) Civil citations - Paulding County shall issue citations as it deems necessary to property owners, permit holders, etc., to appear in magistrate court to answer charges for violating this article, and if proven by a preponderance of the evidence, be subject to civil penalties as set forth in section 9.6.4.1. The citation shall state the section of this article being violated, and shall give the time and date of the hearing before the magistrate court. Potential violations warranting the issuance of citations shall include, but not be limited to, (a) continued/repeated failure to comply with a notice to comply or stop work order; (b) violation of stream buffers; (c) significant amounts of sediment, as determined by and in the discretion of the Paulding County Community Development Department, local issuing authority, or by the director or his or her designee, are found to be leaving the development site; (d) significant amounts of sediment, as determined by the Paulding County Community Development Department, local issuing authority, or by the director or his or her designee, have been or are being discharged into state waters; (e) where best management practices have not been properly designed, installed, and maintained; and (f) failure to obtain a land disturbance permit prior to commencing land disturbance activities.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018)
9.7 Education and certification.
1) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.
2) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
3) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article.
4) If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of paragraph (1) of subsection (b) of O.C.G.A. 12-7-19, then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in paragraph (4) of subsection (b) of O.C.G.A. 12-7-19 and shall not be required to meet any educational requirements that exceed those specified in said paragraph.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018)
9.8 Administrative appeal and judicial review.
9.8.1 Administrative remedies. The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance;
shall entitle the person submitting the plan or holding the permit to a hearing before the board of commissioners within 30 days after receipt by the local issuing authority of written notice of appeal.
9.8.2 Judicial review. Any person, aggrieved by a decision or order of Paulding County as set forth above, after exhausting his administrative remedies, shall have the right to appeal by filing a petition for review in accordance with O.C.G.A. § 5-3-1 et seq.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018; Ord. No. 23-10, § 1 (Exh. A), 9-12-2023, eff.
7-1-2023)
9.9 Effective date, validity and liability.
9.9.1 Effective date. This article, as amended, was approved by the Paulding County Board of Commissioners and shall become effective immediately upon its adoption, or on June 8, 2010.
9.9.2 Validity. If any section, paragraph, clause, phrase, or provision of this article shall be adjudged invalid or held unconstitutional, such decisions shall not effect the remaining portions of this article.
9.9.3 Liability.
1) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the Paulding County or District for damage to any person or property.
2) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
3) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any Waters of the State as defined thereby.
(Res. No. 18-50, § 1 (Exh. A), 10-9-2018)
ARTICLE 10 FLOODPLAIN MANAGEMENT/FLOOD DAMAGE PREVENTION
ORDINANCE*
Introduction It is hereby determined that:
The flood hazard areas of Paulding County, Georgia are subject to periodic inundation which may result in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.
Flood hazard areas can serve important stormwater management, water quality, streambank protection, stream corridor protection, wetland preservation and ecological purposes when permanently protected as undisturbed or minimally disturbed areas.
Effective floodplain management and flood hazard protection activities can: (1) protect human life and health; (2) minimize damage to private property; (3) minimize damage to public facilities and infrastructure such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains; and (4) minimize expenditure of public money for costly flood control projects associated with flooding and generally undertaken at the expense of the general public.
Article IX, Section II of the Constitution of the State of Georgia and O.C.G.A. § 36-1-20(a) have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, Paulding County, Georgia, does ordain this ordinance and establishes this set of floodplain management and flood hazard reduction provisions for the purpose of regulating the use of flood hazard areas. It is determined that the regulation of flood hazard areas and the prevention of flood damage are in the public interest and will minimize threats to public health and safety, as well as to private and public property.
Section 10.1. General provisions.
10.1.1 Purpose and intent. The purpose of this ordinance is to protect, maintain and enhance the public health, safety, environment and general welfare and to minimize public and private losses due to flood conditions in flood hazard areas, as well as to protect the beneficial uses of floodplain areas for water quality protection, streambank and stream corridor protection, wetlands preservation and ecological and environmental protection by provisions designed to:
(1) Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;
(2) Restrict or prohibit uses which are dangerous to health, safety and property due to flooding or erosion hazards, or which increase flood heights, velocities, or erosion;
(3) Control filling, grading, dredging and other development which may increase flood damage or erosion;
(4) Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands;
(5) Limit the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of flood waters; and
(6) Protect the stormwater management, water quality, streambank protection, stream corridor protection, wetland preservation and ecological functions of natural floodplain areas.
10.1.2 Applicability. This ordinance shall be applicable to all areas within unincorporated Paulding County, Georgia.
10.1.3 Designation of ordinance administrator. The Paulding County Community Develop-ment Director or the Director's designee is hereby appointed to administer and implement the provisions of this ordinance.
10.1.4 Basis for establishing areas of special flood hazard, areas of future-conditions flood hazard and associated floodplain characteristics—Flood area maps and studies. For the purposes of defining and determining "Areas of Special Flood Hazard," "Areas of Future-conditions Flood Hazard," "Areas of Shallow Flooding," "Base Flood Elevations," "Floodplains," "Floodways," "Future-conditions Flood Elevations," "Future-conditions Floodplains," potential flood hazard or risk categories as shown on FIRM maps, and other terms used in this ordinance, the following documents and sources may be used for such purposes and are adopted by reference thereto:
(1) The Flood Insurance Study (FIS), dated September 26, 2006, with accompanying maps and other supporting data and any revision thereto including, but not limited to, the October 1978 maps on file are hereby adopted by reference.
(2) Other studies which may be relied upon for the establishment of the base flood elevation or delineation of the 100-year floodplain and flood-prone areas include:
(a) Any flood or flood-related study conducted by the United States Army Corps of Engineers, the United States Geological Survey or any other local, state or federal agency applicable to Paulding County, Georgia; or
(b) Any base flood study conducted by a licensed professional engineer which has been prepared utilizing FEMA approved methodology and approved by Paulding County, Georgia.
(3) Other studies, which may be relied upon for the establishment of the futureconditions flood elevation or delineation of the future-conditions floodplain and flood-prone areas, including:
(a) Any flood or flood-related study conducted by the United States Army Corps of Engineers, the United States Geological Survey, or any other local, state or federal agency applicable to Paulding County, Georgia; and
(b) Any future-conditions flood study conducted by a licensed professional engineer which has been prepared utilizing FEMA approved methodology approved by Paulding County, Georgia.
(4) The repository for public inspection of the FIS, accompanying maps and other supporting data is located at Paulding County Community Development Department.
10.1.5 Compatibility with other regulations. This ordinance is not intended to modify or repeal any other ordinance, rule, regulation, statute, easement, covenant, deed restriction or other provision of law. The requirements of this ordinance are in addition to the requirements of any other ordinance, rule, regulation or other provision of law, and where any provision of this ordinance imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or impose higher protective standards for human health or the environment shall control.
10.1.6 Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this ordinance shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this ordinance.
10.1.7 Warning and disclaimer of liability. The degree of flood protection required by this ordinance is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by manmade or natural causes. This ordinance does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This ordinance shall not create liability on the part of Paulding County or by any officer or employee thereof for any flood damages that result from reliance on this ordinance or any administrative decision lawfully made thereunder.
(Ord. No. 19-02, § 2 (Exh. A), 5-30-2019) Section 10.2. Definitions.
Addition means any walled and roofed expansion to the perimeter or height of a building.
Adjacent means those areas located within the defined horizontal distance from the future-conditions floodplain boundary that are at or lower in elevation than either three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher, unless the area is hydraulically independent (meaning absolutely no connection to the flooding source such as through pipes, sewer laterals, down drains, foundation drains, ground seepage, overland flow, gated or valved pipes, excavated and backfilled trenches, etc., with no fill or other manmade barriers creating the separation).
Appeal means a request for a review of the community development director's or the director's designee interpretation of any provision of this ordinance.
Area of future-conditions flood hazard means the land area that would be inundated by the one-percent-annual-chance flood based on future-conditions hydrology (100-year futureconditions flood).
Area of shallow flooding means a designated AO or AH zone on a community's flood insurance rate map (FIRM) with a one percent or greater chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
Area of special flood hazard means the land area subject to a one percent or greater chance of flooding in any given year. This includes all floodplain and flood prone areas at or below the base flood elevation designated as zones A, A1-30, A-99, AE, AO, AH, and AR on a community's flood insurance rate map (FIRM).
Accessory structure or facility means a structure which is on the same parcel of property as the principal structure and the use of which is incidental to the use of the primary structure.
Base flood means the flood having a one percent chance of being equaled or exceeded in any given year, also known as the 100-year flood.
Base flood elevation means the highest water surface elevation anticipated at any given point during the base flood.
Basement means that portion of a building having its floor subgrade (below ground level) on all sides.
Building has the same meaning as Structure.
Development means any manmade change to improved or unimproved real estate including, but not limited to, buildings or other structures, mining, dredging, filling, clearing, grubbing, grading, paving, any other installation of impervious cover, excavation or drilling operations or storage of equipment or materials.
Elevated building means a non-basement building which has its lowest elevated floor raised above the ground level by foundation walls, shear walls, posts, piers, pilings, or columns.
Existing construction means any structure for which the start of construction commenced before the original Paulding County floodplain ordinance dated February 13, 1979.
Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and final site grading or the pouring of concrete pads) is completed before the original Paulding County floodplain ordinance dated February 13, 1979.
Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.
FEMA means the Federal Emergency Management Agency.
Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:
(a) The overflow of inland or tidal waters; or
(b) The unusual and rapid accumulation or runoff of surface waters from any source.
Flood insurance rate map or FIRM means an official map of a community, issued by FEMA, delineating the areas of special flood hazard and/or risk premium zones applicable to the community.
Flood insurance study or FIS means the official report by FEMA providing an examination, evaluation and determination of flood hazards and corresponding flood profiles and water surface elevations of the base flood.
Floodplain or flood-prone area means any land area susceptible to flooding.
Floodproofing means any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
Floodway or regulatory floodway means the channel of a stream, river, or other watercourse and the adjacent areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
Functionally dependent use means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities.
Future conditions flood means the flood having a one percent chance of being equaled or exceeded in any given year based on future-conditions hydrology. Also known as the 100-year future-conditions flood.
Future-conditions flood elevation means the highest water surface elevation anticipated at any given location during the future-conditions flood.
Future-conditions floodplain means any land area susceptible to flooding by the futureconditions flood.
Future-conditions hydrology means the flood discharges associated with projected-landuse conditions based on a community's zoning maps, comprehensive land-use plans, and/or watershed study projections, and without consideration of projected future construction of stormwater management (flood detention) structures or projected future hydraulic modifications within a stream or other waterway, such as bridge and culvert construction, fill, and excavation.
Highest adjacent grade means the highest natural elevation of the ground surface, prior to construction, adjacent to the proposed foundation of a building.
Historic structure means any structure that is:
(a) Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
(b) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the secretary to qualify as a registered historic district;
(c) Individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or
(d) Individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either:
i. By an approved state program as determined by the Secretary of the Interior; or ii. Directly by the Secretary of the Interior in states without approved programs.
Lowest floor means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this ordinance.
Manufactured home means a structure, transportable in one or more sections, which is built on a permanent chassis and is designed to be used with or without a permanent foundation when attached to the required utilities. The term includes any structure commonly referred to as a mobile home regardless of the date of manufacture. The term also includes parked trailers, travel trailers and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property. The term does not include a recreational vehicle.
Mean sea level means the datum to which base flood elevations shown on a community's flood insurance rate map (FIRM) are referenced. For purposes of this ordinance, the term is synonymous with National Geodetic Vertical Datum (NGVD) of 1929 or the North American Vertical Datum (NAVD) of 1988.
New construction means any structure (see definition) for which the start of construction commenced after the original Paulding County floodplain ordinance dated February 13, 1979 and includes any subsequent improvements to the structure.
New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the original Paulding County floodplain ordinance dated February 13, 1979.
Owner means the legal or beneficial owner of a site, including, but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
Permit means the permit issued by the Paulding County Community Development Department to the applicant which is required prior to undertaking any development activity.
Recreational vehicle means a vehicle which is:
(a) Built on a single chassis;
(b) Four hundred square feet or less when measured at the largest horizontal projection;
(c) Designed to be self-propelled or permanently towable by light duty truck; and
(d) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
Repetitive loss means flood related damage sustained by a structure on two separate occasions during a ten-year period for which the cost of repairs at the time of each such flood event, on the average, equals or exceeds 25 percent of the market value of the structure before the damage occurred.
Site means the parcel of land being developed, or the portion thereof on which the development project is located.
Start of construction includes substantial improvement, and means the date the permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of the structure on a site, such as the pouring of slabs or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure means a walled and roofed building (including a gas or liquid storage tank), that is principally above ground, or a manufactured home.
Subdivision means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.
Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. This term also includes repetitive loss.
Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement to a structure, taking place during a ten-year period, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure prior to the improvement. The market value of the building means (1) the appraised value of the structure prior to the start of the initial repair or improvement, or (2) in the case of damage, the value of the structure prior to the damage occurring. This term includes structures which have incurred
substantial damage, regardless of the actual repair work performed.
The term does not, however, include those improvements of a structure required to comply with existing state or local health, sanitary, or safety code specifications which are the minimum necessary to assure safe living conditions, which have been identified by the code enforcement official. The term does also not include any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a historic structure.
Substantially improved existing manufactured home park or subdivision is where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.
Variance means a grant of relief from the requirements of this ordinance.
Violation means the failure of a structure or other development to be fully compliant with the requirements of this ordinance. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this ordinance is presumed to be in violation until such time as that documentation is provided.
(Ord. No. 19-02, § 2 (Exh. A), 5-30-2019) Section 10.3. Permit procedures and requirements.
10.3.1 Permit application requirements. No owner or developer shall perform any development activities on a site where an area of special flood hazard or area of future-conditions flood hazard is located without first meeting the requirements of this ordinance prior to commencing the proposed activity.
Unless specifically excluded by this ordinance, any landowner or developer desiring a permit for a development activity shall submit to Paulding County, through its community development department, a permit application on a form provided by the Paulding County Community Development Department for that purpose.
No permit will be approved for any development activities that do not meet the requirements, restrictions and criteria of this ordinance.
10.3.2 Floodplain management plan requirements. An application for a development project with any area of special flood hazard or area of future-conditions flood hazard located on the site shall include a floodplain management/flood damage prevention plan. This plan shall include the following items:
(1) Site plan drawn to scale, which includes, but is not limited to:
(a) Existing and proposed elevations of the area in question and the nature, location and dimensions of existing and/or proposed structures, earthen fill placement, amount and location of excavation material, and storage of materials or equipment;
(b) For all proposed structures, spot ground elevations at building corners and 20-foot or smaller intervals along the foundation footprint, or one foot contour elevations throughout the building site;
(c) Proposed locations of water supply, sanitary sewer, and utilities;
(d) Proposed locations of drainage and stormwater management facilities;
(e) Proposed grading plan;
(f) Base flood elevations and future-conditions flood elevations;
(g) Boundaries of the base flood floodplain and future-conditions floodplain;
(h) If applicable, the location of the floodway; and
(i) Certification of the above by a licensed professional engineer or surveyor.
(2) Building and foundation design detail, including, but not limited to:
(a) Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
(b) Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed;
(c) Certification that any proposed nonresidential floodproofed structure meets the criteria in section 10.5.2(2);
(d) For enclosures below the base flood elevation, location and total net area of flood openings as required in section 10.5.1(5); and
(e) Design plans certified by a licensed professional engineer or architect for all proposed structure(s).
(3) Description of the extent to which any watercourse will be altered or relocated as a result of the proposed development;
(4) Hard copies and digital files of computer models, if any, copies of work maps, comparison of pre- and post-development conditions base flood elevations, futureconditions flood elevations, flood protection elevations, special flood hazard areas and regulatory floodways, flood profiles and all other computations and other information similar to that presented in the FIS;
(5) Copies of all applicable state and federal permits necessary for proposed development, including, but not limited to, permits required by section 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33 U.S.C. 1334; and
(6) All appropriate certifications required under this ordinance.
The approved floodplain management/flood damage prevention plan shall contain certification by the applicant that all development activities will be done according to the plan or previously approved revisions. Any and all development permits and/or use and occupancy certificates or permits may be revoked at any time if the construction and development activities are not in strict accordance with approved plans.
10.3.3 Construction stage submittal requirements. For all new construction and substantial improvements on sites with a floodplain management/flood damage prevention plan, the permit holder shall provide to the Paulding County Community Development Department a certified as-built elevation certificate or floodproofing certificate for nonresidential construcAPPENDIX B—DEVELOPMENT REGULATIONS § 10.3 tion including the lowest floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. A final elevation certificate shall be provided after completion of construction including final grading of the site. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a licensed land surveyor or professional engineer and certified by same. When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a licensed professional engineer or architect and certified by same using the FEMA floodproofing certificate. This certification shall also include the design and operation/maintenance plan to assure continued viability of the floodproofing measures.
Any work undertaken prior to approval of these certifications shall be at the permit holder's risk. The Paulding County Community Development Department shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make the corrections required hereby shall be cause to issue a stop work order for the project.
10.3.4 Duties and responsibilities of the administrator. Duties of the Paulding County Community Development Director or the Director's designee shall include, but shall not be limited to:
(1) Review all development applications and permits to assure that the requirements of this ordinance have been satisfied and to determine whether proposed building sites will be reasonably safe from flooding;
(2) Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including, but not limited to, section 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33 U.S.C. 1334;
(3) When base flood elevation data or floodway data have not been provided, then the Paulding County Community Development Director or the Director's designee shall require the applicant to obtain, review and reasonably utilize any base flood elevation and floodway data available from a Federal, state or other sources in order to meet the provisions of sections 4 and 5;
(4) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures;
(5) Review and record the actual elevation, in relation to mean sea level to which any substantially improved structures have been floodproofed;
(6) When floodproofing is utilized for a nonresidential structure, the Paulding County Community Development Director or the director's designee shall review the design and operation/maintenance plan and obtain certification from a licensed professional engineer or architect;
(7) Notify affected adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA);
(8) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (e.g., where there appears to be a conflict between a mapped boundary and actual field conditions) the Paulding County Community Development Director or the director's designee shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this ordinance. Where floodplain elevations have been defined, the floodplain shall be determined based on flood elevations rather than the area graphically delineated on the floodplain maps; and
(9) All records pertaining to the provisions of this ordinance shall be maintained in the office of the Paulding County Community Development Director or the director's designee and shall be open for public inspection.
(10) Coordinate all FIRM revisions with the GA DNR and FEMA; and
(11) Review variance applications and make recommendations to the development waiver review committee.
(Ord. No. 19-02, § 2 (Exh. A), 5-30-2019) Section 10.4. Standards for development.
10.4.1 Definition of floodplain boundaries.
(1) Studied A zones, as identified in the FIS, shall be used to establish base flood elevations whenever available.
(2) For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations shall be provided by the Paulding County Community Development Director or the director's designee. If future-conditions elevation data is not available from the Paulding County Community Development Director, then it shall be determined by a licensed professional engineer using a method approved by FEMA and the Paulding County Community Development Director or the director's designee.
10.4.2 Definition of floodway boundaries.
(1) The width of a floodway shall be determined from the FIS or FEMA approved flood study. For all streams with a drainage area of 100 acres or greater, the regulatory floodway shall be provided by the Paulding County Community Development Director or the director's designee. If floodway data is not available from the Paulding County Community Development Director, then it shall be determined by a licensed professional engineer using a method approved by FEMA and the Paulding County Community Development Director or the director's designee.
10.4.3 General standards.
(1) No development shall be allowed within any area of special flood hazard or area of future-conditions flood hazard that could result in any of the following:
(a) Raising the base flood elevation or future-conditions flood elevation equal to or more than 0.01 foot;
(b) Reducing the base flood or future-conditions flood storage capacity;
(c) Changing the flow characteristics as to the depth and velocity of the waters of the base flood or future-conditions flood as they pass both the upstream and the downstream boundaries of the development area; or
(d) Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation.
(2) Any development within any area of special flood hazard or area of future-conditions flood hazard allowed under section 4.3(1) shall also meet the following conditions:
(a) Compensation for storage capacity shall occur between the average ground water table elevation and the base flood elevation for the base flood, and between the average ground water table elevation and the future-condition flood elevation for the future-conditions flood, and lie either within the boundaries of ownership of the property being developed and shall be within the immediate vicinity of the location of the encroachment. Acceptable means of providing required compensation include lowering of natural ground elevations within the floodplain, or lowering of adjoining land areas to create additional floodplain storage. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the natural (predevelopment) stream channel unless such excavation results from the widening or relocation of the stream channel;
(b) Cut areas shall be stabilized and graded to a slope of no less than 2.0 percent;
(c) Effective transitions shall be provided such that flow velocities occurring on both upstream and downstream properties are not increased or decreased;
(d) Verification of no-rise conditions (less than 0.01 foot), flood storage volumes, and flow characteristics shall be provided via a step-backwater analysis meeting the requirements of section 10.4.4;
(e) Public utilities and facilities, such as water, sanitary sewer, gas, and electrical systems, shall be located and constructed to minimize or eliminate infiltration or contamination from flood waters; and
(f) Any significant physical changes to the base flood floodplain shall be submitted as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. The CLOMR submittal shall be subject to approval by the Paulding County Community Development Director or the Director's designee using the FEMA community concurrence forms before forwarding the submittal package to FEMA for final approval. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be the responsibility of the applicant. Within six months of the completion of development, the applicant shall submit as-built surveys and plans for a final letter of map revision (LOMR).
10.4.4 Engineering study requirements for floodplain encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and floodways. This study shall be prepared by a licensed professional engineer and made a part of the application for a permit. This information shall be submitted to and approved by the Paulding County Community Development Director or the director's designee prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. Such study shall include:
(1) Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;
(2) Step-backwater analysis, using a FEMA-approved methodology approved by the Paulding County Community Development Director or the director's designee.
Cross-sections (which may be supplemented by the applicant) and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles;
(3) Floodplain storage calculations based on cross-sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development;
(4) The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments.
10.4.5 Floodway encroachments. Located within areas of special flood hazard are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity flood waters, debris or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights.
Therefore the following provisions shall apply:
(1) Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway, except for activities specifically allowed in (2) below.
(2) Encroachments for bridges, culverts, roadways and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment will not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge.
A licensed professional engineer must provide supporting technical data and certification thereof; and
(3) If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway shall be issued by the Paulding County Community Development Director or the director's designee until an affirmative conditional letter of map revision (CLOMR) is issued by FEMA and no-rise certification is approved by the Paulding County Community Development Director or the director's designee.
10.4.6 Maintenance requirements. The property owner shall be responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on his property so that the flood-carrying or flood storage capacity is not diminished. The Paulding County Community Development Director or the director's designee may direct the property owner (at no cost to Paulding County) to restore the flood-carrying or flood storage capacity of the floodplain if the owner has not performed maintenance as required by the approved floodplain management plan on file with the Paulding County Community Development Director or the director's designee.
(Ord. No. 19-02, § 2 (Exh. A), 5-30-2019) Section 10.5. Provisions for flood damage reduction.
10.5.1 General standards. In all areas of special flood hazard and areas of futureconditions flood hazard the following provisions apply:
(1) New construction and substantial improvements of structures (residential or nonresidential), including manufactured homes, shall not be allowed within the limits of the future-conditions floodplain, unless all requirements of sections 10.4.3,
10.4.4 and 10.4.5 have been met;
(2) New construction and substantial improvements shall be anchored to prevent flotation, collapse and lateral movement of the structure;
(3) New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage;
(4) New construction and substantial improvements shall be constructed by methods and practices that minimize flood damage;
(5) Elevated buildings. All new construction and substantial improvements that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure.
The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.
(a) Designs for complying with this requirement must either be certified by a licensed professional engineer or architect to meet or exceed the following minimum criteria:
(i) Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;
(ii) The bottom of all openings shall be no higher than one foot above grade;
and (iii) Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions.
(b) So as not to violate the lowest floor criteria of this ordinance, the unfinished and flood resistant enclosure shall solely be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and
(c) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
(6) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located four feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher, so as to prevent water from entering or accumulating within the components during conditions of flooding;
(7) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable State requirements for resisting wind forces;
(8) All proposed development shall include adequate drainage and stormwater management facilities per the requirements of Paulding County to reduce exposure to flood hazards;
(9) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system;
(10) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters;
(11) On-site waste disposal systems shall be located and constructed to avoid impairment to, or contamination from, such systems during flooding;
(12) Other public utilities such as gas and electric systems shall be located and constructed to avoid impairment to them, or public safety hazards from them, during flooding;
(13) Any alteration, repair, reconstruction or improvement to a structure which is not compliant with the provisions of this ordinance, shall be undertaken only if the nonconformity is not furthered, extended or replaced;
(14) If the proposed development is located in multiple flood zones, or multiple base flood elevations cross the proposed site, the higher or more restrictive base flood elevation or future condition elevation and development standards shall take precedence;
(15) When only a portion of a proposed structure is located within a flood zone or the future conditions floodplain, the entire structure shall meet the requirements of this ordinance; and
(16) Subdivision proposals and other proposed new development, including manufactured home parks or subdivisions, shall be reasonably safe from flooding:
(a) All such proposals shall be consistent with the need to minimize flood damage within the flood-prone area;
(b) All public utilities and facilities, such as sewer, gas, electrical, and water systems shall be located and constructed to minimize or eliminate flood damage; and
(c) Adequate drainage shall be provided to reduce exposure to flood hazards.
10.5.2 Building standards for structures and buildings within the future-conditions floodplain.
(1) Residential buildings.
(a) New construction. New construction of principal residential structures shall not be allowed within the limits of the future-conditions floodplain unless all requirements of sections 10.4.3, 10.4.4 and 10.4.5 have been met. If all of the requirements of sections 10.4.3, 10.4.4 and 10.4.5 have been met, all new construction shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the futureconditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of section 10.5.1(5)(a).
(b) Substantial improvements. Substantial improvement of any principal residential structure shall not be allowed within the limits of the future-conditions floodplain unless all requirements of sections 10.4.3, 10.4.4, and 10.4.5 have been met. If all the requirements of sections 10.4.3, 10.4.4, and 10.4.5 have been met, all substantial improvements have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of section 10.5.1(5)(a).
(2) Nonresidential buildings.
(a) New construction. New construction of principal nonresidential structures shall not be allowed within the limits of the future-conditions floodplain unless all requirements of sections 10.4.3, 10.4.4 and 10.4.5 have been met. If all of the requirements of sections 10.4.3, 10.4.4 and 10.4.5 have been met, all new construction shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of section 10.5.1(5)(a). New construction that has met all of the requirements of sections 10.4.3, 10.4.4 and 10.4.5 may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, or at least as high as the future-conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the Paulding County Community Development Director using the FEMA floodproofing certificate along with the design and operation/maintenance plan.
(b) Substantial improvements. Substantial improvement of any principal nonresidential structure Substantial improvement of any principal nonresidential structure shall not be allowed within the limits of the future-conditions floodplain unless all requirements of sections 10.4.3, 10.4.4, and 10.4.5 have been met. If all of the requirements of sections 10.4.3, 10.4.4, and 10.4.5 have been met, all substantial improvements shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher.
Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of section 10.5.1(5)(a). Substantial Improvements that have met all of the requirements of sections 10.4.3, 10.4.4, and 10.4.5 may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, or at least as high as the future-conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the Paulding County Community Development Director using the FEMA floodproofing certificate along with the design and operation/ maintenance plan.
(3) Accessory structures and facilities. Accessory structures and facilities (i.e., barns, sheds, gazebos, detached garages, recreational facilities and other similar nonAPPENDIX B—DEVELOPMENT REGULATIONS § 10.5 habitable structures and facilities) which meet the requirements of sections 10.4.3,
10.4.4 and 10.4.5 and are permitted to be located within the limits of the future-conditions floodplain shall be constructed of flood-resistant materials and designed to provide adequate flood openings in accordance with section 10.5.1(5)(a) and be anchored to prevent flotation, collapse and lateral movement of the structure.
(4) Standards for recreational vehicles. All recreational vehicles placed on sites must either:
(a) Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or
(b) Meet all the requirements for Residential Buildings—Substantial Improvements (section 10.5.2(1)), including the anchoring and elevation requirements.
(5) Standards for manufactured homes.
(a) New and substantially improved manufactured homes shall not be allowed to be placed within the limits of the future-conditions floodplain unless all requirements of sections 10.4.3, 10.4.4 and 10.4.5 have been met. If all of the requirements of sections 10.4.3, 10.4.4 and 10.4.5 have been met, all new construction and substantial improvement shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of section 10.5.1(5)(a).
(b) Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision shall be elevated so that either:
(i) The lowest floor of the manufactured home is elevated no lower than three feet above the level of the base flood elevation, or one foot above the future-conditions flood elevation, whichever is higher; or
(ii) The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
(c) All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement in accordance with standards of section 10.5.1(7).
10.5.3 Building standards for structures and buildings authorized adjacent to the future-conditions floodplain.
(1) Residential buildings. For new construction and substantial improvement of any principal residential building or manufactured home, the elevation of the lowest floor, including basement and access to the building, shall be at least three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of section 10.5.1(5)(a).
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.