Putnam County · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 28 - DEVELOPMENT REGULATIONS / Article IV - FINAL PLAT AND CERTIFICATE OF COMPLETION
Sec. 28-81. Inspection process.
Sobre este texto
- As published by Municode, current through 2026-02-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The director, using the construction drawings, shall conduct a field inspection of the subdivision or development. If there are deviations from the approved drawings deemed by the director to be significant, the director shall require the developer to submit revised drawings and/or engineering studies (as appropriate), reflecting the changes. The changes shall be further reviewed for compliance with the original approval and comments of the TRC. Once the director is satisfied that compliance has been achieved, the developer shall be notified that a final plat may be submitted. A satisfactory inspection of a site development shall cause the director to issue a certificate of completion letter to the developer, stating the development has met all applicable requirements.
Historia
(Res. of 7-17-2007(2); Ord. of 6-25-2024(1))
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.