Whitfield County · Ordenanza de zonificación
Appendix C - STORMWATER LOCAL DESIGN MANUAL
3.2.2. Dry underground detention ponds.
Sobre este texto
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
No underground detention pond shall be constructed on residential development projects. Underground detention ponds may be considered on non-residential development projects after the designer has shown that construction of an aboveground detention pond is infeasible to the satisfaction of the county engineer. If allowed, all structures which are designed to store water shall be constructed of reinforced concrete or HDPE. Additionally, the structures should be designed such that vehicular traffic meeting an H-20 loading standard could traverse the area over the detention pond once backfilled or completed without resulting in structural failure of the pond. When designing the pond, the designer should design the structure such that routine maintenance can be accommodated without unreasonable demands being placed on future property owners.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.