Monroe County · Código de ordenanzas
Appendix A - SUBDIVISIONS / Article V - REQUIRED SUBDIVISION IMPROVEMENTS / 5.5 - Basic construction requirements for all streets.
5.5.4. Installation of utilities. After grading is
Sobre este texto
- As published by Municode, current through 2025-03-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
completed and approved and before any base is applied, all of the underground utilities—water mains, sewer mains, gas mains and all service connections related thereto, and where available— shall be installed completely in accordance with Appendix B: Monroe County Utility Placement Standards and approved throughout the length of the street and across the flat section. All driveways for houses to be built by the subdivider shall be cut and drained. Where the utility
mains are off the pavement, the subdivider may elect to omit the installation of service connections providing that at such time as these service connections are needed, they may be jacked
across the street without breaking or weakening the existing pavement.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.