Ir al contenido
Georgia Commons
Menú

Atlanta · Ordenanza de zonificación

Atlanta Zoning Ordinance

Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.

Sobre este texto

  • As published by Municode, current through 2026-10-21
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 22 de 24. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

specified herein; provided, however that new full floor tenant alterations exceeding $25,000 in valuation which includes the removal/installation of fixed partitions or ceiling systems (including electrical lighting above the ceiling), shall install automatic sprinkler protection for that space only as a condition of that

alteration permit.

Exception: Areas within telecommunications equipment buildings, used exclusively for telecommunications equipment and associated generator and power equipment, and under the exclusive control of a telecommunications provider shall be exempt from requirements of this section where the following alternate requirements are satisfied:

(a) Such areas are separated from the remainder of the building by construction equivalent to a one hour fire resistant wall and two hour floor/

ceiling assemblies.

(b) Such areas are provided with automatic fire detection to respond to visible and invisible particles of combustion.

(2) All mercantile and institutional occupancies six (6) stories or over 75 ft. in height.

(3) All residential occupancies (Group R) six

(6) stories or more in height shall be designed in accordance with NFPA 13 or any subsequent rules that the Director of the Bureau of Buildings may publish to

provide economical installations, including, but not limited to, hydraulic design methods, or innovative piping materials.

(4) Any assembly occupancy used or capable of being used for exhibition or display

purposes shall be protected throughout by an approved automatic sprinkler system

when the exhibition or display area exceeds 15,000 sq. ft.

(5) The following requirements shall be the specific responsibility of the authorized sprinkler contractor and shall be applicable where existing Class I, Class II or Class III standpipes are utilized to provide a Combined Standpipe system:

i. During such time periods as the installation of sprinkler systems may require, no standpipe or fire pump

may be made inoperative without the Fire Department being given twenty-four (24) hour prior notice.

Such notice shall be made by notifying the City of Atlanta Fire Communication Center at telephone number 911; and, ii. Where buildings contain two (2) or

more standpipes, at least one standpipe shall be maintained in such a manner that water can be discharged through piping, valves, hose outlets and allied equipment for the

purposes of extinguishing a fire.

Where a building contains only one

(1) standpipe riser, modifications to the system shall be conducted after normal working hours; and, iii. Appropriate temporary signage shall be provided at all Fire Department

Connections on the building indicating the operational status of the system.

(6) All total systems required in Section 101.8(b) shall be installed by December

31, 1995. No business license or permission to occupy shall be issued to such buildings unless when in compliance with this Code.

Exceptions:

(a) For buildings and individual spaces within buildings having documented leases that presently extend beyond December 31, 1995, an extension to December 31, 1999 shall be allowed provided however that leases of such building and spaces which expire between December 31, 1995 and December 31, 1999 shall be subject to compliance within 12 months of lease

expiration.

(b) For buildings and individual tenant spaces within buildings presenting documented evidence of major asbestos presence or other toxic materials which would directly affect the installation of automatic sprinkler protection an extension to December 31, 1999 shall be allowed; provided, however that new full floor tenant alterations exceeding $25,000 in valuation which includes the removal/ installation of fixed permanent

partitions or ceiling systems (including electrical lighting above the ceiling), shall install automatic sprinkler protection for that space only as a condition of that alteration permit.

(c) For buildings exceeding one million square feet in size an extension to December 31, 1999, shall be allowed;

provided however, that new tenant alterations exceeding $25,000 in valuation which includes the removal/ installation of fixed permanent partitions or ceiling systems (including electrical lighting above the ceiling)

and which includes a minimum of one half (1 /2) of the total area as measured contiguously on the affected floor, shall install automatic sprinkler protection for that space

only as a condition of that alteration permit.

(d) Condominiums (as defined in the Georgia Condominium Act at

O.C.G.A. § 44-3-71(7).

(c) Requirements for Retroactive Mechanical and Electrical Systems.

(1) Where new full floor tenant alterations exceeding $25,000 in valuation which includes the removal/installation of fixed permanent partitions or ceiling systems

(including electrical lighting above the ceiling) are performed, all abandoned wiring previously utilized for low voltage systems which are not approved for return air plenums shall be removed from above the ceiling plenum spaces, or the

plenum space shall be protected with automatic partial sprinkler protection.

(2) All HVAC units exceeding 5,000 cfm shall be provided with listed smoke detectors

installed in the supply system downstream of the filters to detect the presence of smoke and automatically stop the fan(s).

Such modification shall be installed by December 31, 1995.

(3) For existing buildings having electrical systems of 277/480 volts with 1,000 amps or more which are designed without ground fault protection and use electric bussways, heat detectors shall be installed in each electrical room to disconnect the overcurrent device supplying that circuit. Such modification shall be installed by December 31, 1995.

Exception: Telecommunications equipment buildings, used exclusively for telecommunications equipment and associated generator and power equipment and under the exclusive control of a telecommunications provider shall be exempt from requirements of this section.

(d) If, within any twelve (12) month period, alterations or repairs costing in excess of fifty (50) percent of the physical value of the building at the time of renovation are made to an existing building, such building shall be made to conform to the requirements of this Code for new buildings.

(e) If an existing building is damaged by fire or otherwise in excess of fifty (50) percent of the physical value before such damage is repaired, it shall be made to conform to the requirements of this Code for new buildings.

(f) If the cost of such alterations or repairs within any twelve (12) month period or the amount of such damage as referred to in Section 101(d) is more than twenty-five (25) percent but not more than fifty (50) percent of the physical value of the building at the time the damage occurred, the portions to be altered or repaired shall be made to conform to the requirements of this Code for new buildings to such extent as the Director of the Bureau of Buildings may determine in accordance with the requirements for Existing Occupancies in the Code for Safety to Life from Fire in Buildings and Structures (NFPA 101-1985).

(g) For the purpose of this section, physical value of the building shall be determined by the Director of the Bureau of Buildings.

(h) Repairs and alterations, not covered by the preceding paragraphs of this section, restoring a building to its condition previous to damage to deterioration, or altering it in conformity with the provisions of this Code or in such manner as will not extend or increase non-conformity or hazard, may be made with the same kind of materials as those of which the building is constructed; but not more than twenty-five (25) percent of the roof covering of a building shall be replaced in any period of twelve (12) months unless the entire roof covering is made to conform with the requirements of this Code for new buildings.

(Ord. No. 1983-13, § 1, 3-11-83; Ord. No. 1983-14, § 1, 3-11-83; Ord. No. 1989-89, §§ I—IV, 12-22-89;

Ord. No. 1993-20, § 1, 6-7-93; Ord. No. 2008-06(06- O-0262, § 1, 2-12-08)

SECTION 102. ORGANIZATION

102.1. DIRECTOR.

There shall be a Director of the Bureau of Buildings who shall receive applications required by this Code, issue permits and furnish the prescribed certificates. For purpose of this Code, the word "Director" shall be defined as the Director of the Bureau of Buildings or an authorized representative. The Director shall examine premises for which permits have been issued and shall make necessary inspections to see that provisions of law are complied with and that construction is prosecuted safely. The Director shall enforce all laws relating to the construction, alteration, repair, removal, demolition, raising or lowering, equipment, use and occupancy, location, and maintenance of buildings and structures, except as may be otherwise provided for in other ordinances or regulatory measures. The Director shall, when requested by proper authority, or when the interests of the City of Atlanta, Georgia, so require, make investigations in connection with matters referred to in this Code and render written reports on the same. To enforce compliance with the law, to remove illegal or unsafe conditions or to secure the necessary safeguards, the Director shall issue such notices or orders as may be necessary.

102.2. INSPECTIONS REQUIRED.

(a) Inspections required under the provisions of this Code shall be made by the Director. Upon presentation of proper credentials, the Director may enter, at reasonable times, any building, structure or premises in the City of Atlanta, Georgia, to perform any duty imposed by this Code. The Director is hereby authorized and directed to enforce all provisions of this Code, and is hereby invested with all police power necessary for the purpose of issuing subpoenas and copies of charges for the prosecution of any person or persons as may be charged with any violations of this or other ordinances of the City of Atlanta, Georgia.

(b) All construction, alteration, repair, installation, erection, removal, demolition, uses, locations, and maintenance of equipment, appliances or systems for which a permit has been issued as prescribed in this Code shall be subject to inspection by the Director.

(c) Work requiring a building permit shall not be commenced until the permit holder or agent shall have posted the building permit card in a conspicuous place on the front of the premises.

The permit shall be protected from the weather and located in such a position as to permit the Director to conveniently make the required entries thereon. This permit card shall be maintained in such a position by the permit holder until the Certificate of Occupancy has been issued by the Director.

(d) The Director upon notification from the permit holder or agent, shall make the following inspections of buildings and such other inspections as may be necessary, and shall either approve that portion of the construction as completed or shall notify the permit holder or agent wherein the same fails to comply with the law:

Foundation Inspection: To be made after trenches are excavated and forms erected.

Frame Inspection: To be made after the roof, all framing, fire-blocking and bracing is in place, all concealed wiring, all pipes, chimneys, ducts and vents are complete.

Final Inspection: To be made after the building is completed and ready for occupancy.

(e) Work shall not be done on any part of a building or structure beyond the point indicated in each successive inspection without first obtaining the written approval of the Director. Such written approval shall be given only after an inspection shall have been made of each successive step in the construction as indicated by each of the foregoing three inspections.

(f) Reinforcing steel or structural framework of any part of any building or structure shall not be covered or concealed in any manner whatsoever without first obtaining the approval of the Director.

(g) In all buildings where plaster is used for fire protection purposes, the permit holder or agent shall notify the Director after all lathing and backing is in place. Plaster shall not be applied until the approval of the Director has been received (See Chapter X).

(h) The Director may require that the owner or agent employ a special inspection service on large or special buildings or work. The special inspection service shall be qualified and approved by the Director. Reports in writing of all code violations and other information required by the Director shall be submitted.

102.3. RULES.

(a) The Director shall promulgate rules as prescribed in this Code and consistent therewith, it being the intent of this requirement that the standards of federal and state bureaus, national technical organizations or fire underwriters, as the same may be amended from time to time, shall serve as a guide in fixing the minimum rules of practice under this Code.

(b) For the purpose of securing for the public the benefits of new developments and yet ensuring public safety, the City of Atlanta, Georgia, shall make or cause to be made investigations, or may accept duly authenticated reports from recognized sources of new materials, equipment, appliances or systems intended for use in the City of Atlanta, Georgia, which are not provided for in this Code, and shall promulgate rules setting forth the conditions under which such materials, appliances, equipment or systems may be used.

(c) No rule of the Director shall become effective until four (4) weeks after notice of intention to enforce it shall have been given through the publication in a newspaper in general circulation in the City of Atlanta, Georgia, and until a public hearing on the same shall have been held;

provided that said public hearing shall not be necessary unless a request shall have been made for such hearing during the said period of publication, by notice to the Director. Such rule must be drawn in its proposed form and opened to public inspection at the time the notice to enforce is published.

102.4. RECORDS.

(a) The Director shall maintain a permanent record of the permit application and issuance thereon, which record shall indicate the name of the professional engineer or architect, if any, that has sealed the plans, specifications, plats, or reports pursuant to which said building permit is issued. Said report should indicate details on the size, type of building or structure, use for said building or structure and estimated cost of construction.

(b) All such records shall be open to public inspection for good and sufficient reasons at office hours observed by the City of Atlanta, Georgia, but shall not be removed from the office of the Director.

(Ord. No. 1983-13, § 1, 3-11-83; Ord. No. 1983- 14, § 1, 3-11-83)

SECTION 103. APPLICATION FOR PERMIT

103.1. WHEN REQUIRED.

It shall be unlawful to construct, erect, demolish, install, alter or repair or to commence the construction, erection, demolition, installation, alteration or repair of any building, structure, equipment, appliances or system without first obtaining a building permit in conformity with Section 104, unless said structure is specifically exempted by this Code.

Nothing in this Code shall be construed to allow the violation of any of the terms of the Atlanta Zoning Ordinance regardless of whether or not a permit is required.

(a) An application for a permit shall be submitted in such form as the Director may prescribe.

(b) Such application shall be made by the owner or an authorized representative.

(c) Such application shall contain the full names and addresses of the applicant and of the owner.

(d) Such application shall describe briefly the proposed work and shall give such additional information as may be required by the Director.

(e) Performance of work under a permit shall affirm consent to conditions of the permit.

(a) When required by the Director, two or more copies of specifications, and of drawings drawn to scale with sufficient clarity and detail to indicate the nature and character of the work, shall accompany every application. Such drawings and specifications shall contain name and address of designer and information in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with this Code. Such information shall be specific, and this Code shall not be cited as a whole or in part, nor shall the term legal or its equivalent be used, as a substitute for specific information.

(b) The Director may require details, computations and other data necessary to describe the construction and basis of calculations and they shall bear the signature of the person responsible for the design. The plans shall show the use and occupancy and the design live loads of all parts of the building.

(c) All drawings, specifications and accompanying data shall bear the name and address of the designer. In the case of buildings or structures exceeding two stories in height or 5,000 square feet in area and/or costing $50,000 or more except one and two family dwellings, such designer shall be an architect or engineer legally registered under the laws of this State regulating the practice of architecture or engineering and shall affix an official seal to said drawings, specifications and accompanying data.

103.4. WORK EXEMPT FROM PERMIT.

Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provision of this code or any other laws and ordinances of the City of Atlanta.

Permits shall not be required for the following:

(a) Building Permit: No permit or permit fee is required for any repair work to a

single-family, duplex, multi-family or nonresidential structure with a total valuation of less than $10,000.00 provided that such work is otherwise lawful. As

used herein, repair work shall mean the reconstruction or renewal of any part of an existing structure for the purpose of its maintenance. The following permit

exemptions shall only apply to existing single-family, two-family or duplex residential structures or for existing accessory structures for such properties and without regard to cost:

i. Non-structural re-roofing repairs excluding truss repairs or shingle replacement provided that upon replacement no more than three layers of shingles remain;

ii. Repair or replacement of kitchen cabinets;

iii. Repair or replacement of bath cabinets or countertops not involving relocation of electric outlets or appliances or plumbing fixtures;

iv. Repair or replacement of interior doors;

v. Repair or replacement of drywall on ceilings or walls not to exceed three sheets;

vi. Repair or replacement of floor or wall coverings such as carpet, tile, hardwood, paneling, wallpaper, etc.;

vii. Interior or exterior painting;

viii. Repair or replacement of gutters;

ix. Non-structural porch or deck repairs;

and

x. Repair or replacement of siding.

(b) HV/AC Permit: The following permit exemptions shall only apply to existing single-family, two-family or duplex residential structures or for existing accessory structures for such properties:

i. Repair or replacement of existing air conditioner condensers;

ii. Repair of existing furnaces and equipment; and iii. Replacement of grills and diffusers on existing duct work.

(c) Plumbing Permit: The following permit exemptions shall only apply to existing

single-family, two-family or duplex residential structures or for existing accessory structures for such properties:

i. Repair or replacement of existing kitchen fixtures (sinks); and ii. Repair or replacement of existing bathroom fixtures (sinks, lavatories, bathtubs, showers).

(d) Electrical Permit: The following permit exemptions shall only apply to existing

single-family, two-family or duplex residential structures or for existing accessory structures for such properties:

i. Repair or replacement of existing electrical outlets;

ii. Repair or replacement of existing electrical fixtures; and iii. Installation, repair or replacement of low voltage systems such as

security alarms, garage door openers, phone and cable lines, etc.

(e) Policies and Procedures: The director may adopt written policies and procedures to exempt additional classes of work

exempt from permitting upon a finding that such additional class or classes is warranted and will not endanger the

health or safety of building occupants or the public.

(f) No exemption for properties designated under Chapter 20 of the zoning ordinance:

The foregoing permit valuation threshold and permit scope exemptions shall not

apply to any work to be conducted in a landmark, or historic district, or landmark or historic building or site governed by Chapter 20 of the zoning ordinance when

such work affects exterior of the structure or site. Notwithstanding the foregoing,

for property governed by said Chapter 20, no certificate of appropriateness or building permit or permit fee is required for any repair work with a total valuation of less than $2,500.00 provided that such work is otherwise lawful.

(Ord. No. 2017-33(17-O-1307), § 2, 6-28-17)

SECTION 104. PERMITS

104.1. APPLICATIONS.

(a) Applications for permits shall be examined within a reasonable time after filing, provided however that no applicant shall be prevented from exercising their rights pursuant to O.C.G.A.

§ 8-2-26 to request in writing a determination as whether their application can be processed within the time frame set forth by such state law. If, after examination by the director, it appears that the proposed work will be in compliance with the laws and ordinances applicable thereto, the application shall be approved and a permit issued for the proposed work. If the director's examination reveals otherwise, or if the director finds that any ongoing construction subject to this Code and related to the building or structure for which the permit application has been filed does not comply with the applicable regulatory requirements, is subject to a notice or stop work order issued under Sections 106.1 or 106.2, the condition in violation has not been remedied or corrected, and the permit application is not necessary for such remedy or correction, such application shall be rejected and the applicant notified by a written report or otherwise.

(b) A nonrefundable minimum initial permit application fee of $175.00 shall be imposed for all building permit applications accepted for review.

Any failure of the form of the payment offered for permit application fee shall result in the immediate cancellation of the application. Twenty-five dollars of the nonrefundable minimum initial permit application fee shall be allocated to fund the cost of technology improvement and such payments may be allocated to pay the cost of improvements already undertaken.

(c) For all permits requiring plan review, a portion of the total building permit fee shall be paid to cover the cost of plan review before any processing of the application shall occur. The applicant shall be responsible for providing accurate cost of construction information to the director in such form as the director shall specify.

(i) All applicants shall pay 50% of the total building permit fee based on the cost of construction information provided to the director at the time of the submittal of the application for plan review. The director may decline to continue plan review upon a finding that the cost of construction information submitted was inaccurate and if such determination is made, the director shall notify the applicant

within three business (3) days that such determination has been made and that

payment of the amount necessary to bring the amount paid to 50% of the total building permit fee that plan review will recommence.

(ii) Amendments or corrections to plans requiring a third review of the plans, and each subsequent plan amendment or correction may require the payment of an additional 25% of the estimated building permit fee or a fee of $150.00 per hour of plan review time whichever is smaller.

(iii) Revisions or amendments to plans for which a building permit has been issued, but for which no certificate of occupancy has been issued may, require an additional plan review fee in the event of changes

discovered upon inspection that were not a part of the plans approved for permit

issuance.

(iv) Within 30 days after the payment of the initial plan review fee (50% of the total building permit fee estimate), the

applicant may present in writing a request that the building permit application be

withdrawn. The Director may authorize a refund of up to 50% of the plan review fee payment, provided that the cost for

the plan review ($150.00 per hour of review per department) does not exceed the amount of refund requested as of the date when the Office of Buildings received the refund request. The initial permit

application fee is not refundable.

(d) An application shall expire when there has been no activity on the application for a period of 180 days as described in this subsection.

(i) With respect to an application not approved for issuance of the building permit, "no activity" shall mean that the applicant of record has not responded to the director's written notification that additional information or correction of

any of the required plans is required before further processing of the application can take place or that the applicant has failed to submit corrections to plans or additional information after having

received the director's written instructions. Such written notifications may be made by e-mail or by other means such

as dated notations during plan reviews where the applicant or a representative is present.

(ii) With respect to an application approved for issuance of the building permit, "no activity" shall mean that the applicant of record has not responded to the director's notification that all required approvals have been obtained and the building

permit is awaiting issuance and that the final fee payment is due.

(iii) An expired application shall not be vested against any change in the zoning code, or any applicable building code, or any other ordinance of the City of Atlanta.

(iv) An expired application may be reactivated by the director, by the payment of the

actual cost ($150.00 per hour) to review the plans for any change in the zoning

code and any applicable building code but in no case shall this cost be less than $150.00. Reactivation of the application shall not excuse compliance with the

provisions of the zoning code, or any applicable building code, or any other ordinance of the City of Atlanta in effect at the time of reactivation.

(v) Any changes requested to an expired application shall require an additional 50% of the cost of the building permit to cover the cost of review by all affected departments.

(e) An application shall be cancelled and shall not be reactivated after 365 days of no activity.

For the purposes of determining when cancellation of the permit application shall occur, "no activity" shall have the same meaning which applies to the expiration of applications and begin as of the same date that the expiration period begins.

(f) Extensions of permit applications.

(i) Upon the request of applicant and payment of the fee required by this subsection prior to the expiration date or cancellation date of the permit application, it may be extended once as of right, for a period of up to 180 days. Any

subsequent extensions of 180 days shall be at the discretion of the director, who may only grant further extensions upon

a showing of extraordinary circumstances, and, payment of the fee prior to the date of expiration or expiration of the prior extension, provided however that no extension shall vest an application against changes in the zoning code or increases

in building permit fee for any period greater than six months from the date when the permit would have first expired.

(ii) The cost for all permit application extensions shall be $100.00. During the period of the extension, the time for the application to be considered a cancelled permit by the operation of law shall be tolled but the fact that the extension has been

granted shall not act to prevent the imposition of additional cost for the reactivation of an expired permit application as set forth above.

(g) Once the applicant has been contacted in the manner set forth in their application and been informed that all required approvals have been obtained and the building permit does not issue within 365 days of the date of such contact, the permit application shall be cancelled and may not be reactivated. Failure of the applicant to keep their contact information current by notifying the director in writing of the change in the contact information shall not extend the time before cancellation may occur.

(h) The issuance or granting of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of any violation of any of the provisions of this Code. No permit presuming to give authority to violate or cancel the provisions of this Code shall be valid, except insofar as the work or use which it authorizes is lawful.

(i) Nothing in this section shall be construed to prevent the building official from issuing a permit for the construction of a part of a building or structure before the entire plans and detailed statements of said building or structure have been submitted or approved. No permit issued pursuant to this section shall vest any rights in the applicant or permit holder in a manner that would excuse any failure to fully comply with all applicable requirements of the City Code prior to the issuance of the certificate of occupancy and all work that is done shall be fully at the risk of the permit holder.

(j) Interior work on the build-out of commercial buildings is permitted prior to the final approval of building plans provided however that such work shall be limited to the use of metal stud members. Such work can only be performed by a licensed contractor and shall require the submission of plans and the payment of a $200.00 nonrefundable "fast-track metal stud only" additional application fee. Any licensed contractor applying for such application shall acknowledge at the time of initial permit application that the work is entirely at risk and that any work not in conformity with the code or the plans must be corrected. The issuance of "fasttrack metal stud only" permit through the additional application fee shall not excuse compliance from any requirement of Code or of other ordinances of the City of Atlanta, Georgia prior to issuance of a regular permit.

(k) The issuance of a permit based on applications, plans and/or specifications shall not prevent the director from thereafter requiring the correction of errors when in violation of this Code or of other ordinances of the City of Atlanta, Georgia.

(l) Information provided by an applicant of record including all details shown on the plans submitted shall be presumed to be given to the City with the consent of the owner and shall be binding with respect to all actions taken by the City in reliance upon such information. The submission of the application shall be sufficient for this presumption to become effective and signature of the applicant or owner is not required for the information to be considered a representation binding on the applicant or owner that the information in the application is truthful.

(Ord. No. 2025-07(25-O-1055), § 1, 2-17-25)

104.2. FEES.

Any persons obtaining a building permit shall pay, to the City of Atlanta, fees in accordance with the value of the proposed work per square foot of building in addition to any application fee charged in Section 104.1. For purposes of this section, the minimum value of proposed new work (including new work to existing structures) shall be based on Table 100, Building Valuation Data provided by the International Code Council as updated February 2009 and as set forth herein. Valuation of alteration projects shall be based upon the estimated construction costs for new work. Minimum value for interior alterations without engineered structural work shall be 20% of the valuation of new building construction. For interior alterations involving structural engineering, the minimum valuation shall be 40% of the value of new building construction.

The factor shall apply only the square footage being altered in the application and not the entire structure.

(a) Reserved.

(b) The amount of $7.00 per $1,000.00 of valuation based on Table 100 is the fee

for the plan review of the building permit.

The final payment shall be the total of the valuation cost calculation less the plan review cost previously paid. The fact that the valuation cost calculation does not include the amount of development impact fees imposed pursuant to Chapter 19 or other fees imposed

elsewhere in the Code does not relieve any applicant from the payment of any fees. No permit is valid until all fees imposed by the City have been paid and the payment validated by the Office of Revenue

(c) A reinspection fee of $50.00 shall be imposed for each reinspection after the

initial inspection when a written notice has been issued requiring the correction of inferior work.

(d) A fee of double the usual permit fee will be charged for all building begun without a permit. However, in no case shall the

penalty portion of said fee exceed $1,000.00. In the event that work is stopped for failure to obtain a permit and citations are issued for violation of the stop work order, any court imposed fines shall be for violation of the stop work

order and every violation may constitute a separate offense.

(e) The fee for changing the contractor of record on a permit or permit application shall be $50.00.

(f) The fees for sign permits set forth in this section shall impose an additional amount to fees charged elsewhere in the City

Code for sign permits where such fees are lower than the fees charged in this section such that the fee amount in this section shall be the actual amount of the fee.

(g) A fee of double the usual permit fee shall be charged for signs erected without a

permit. However, in no case shall the penalty portion of said fee exceed $1,000.00.

(h) Fees for the issuance of certificates of occupancy (whether temporary or

permanent which are each a separate fee) shall be as follows:

a. New one- and two-family residences shall be $100.00.

b. Additions to one- and two-family residence shall be $50.00.

c. Tenant build-out for residential condominium units shall be $100.00 per unit.

d. New commercial building of one story shall be $200.00.

e. New commercial building exceeding one story but less than eight stories in height shall be $200.00 plus $200.00 per additional floor or portion thereof.

f. Any building eight stories or higher shall be $300.00 per floor.

g. Tenant build-out for interior commercial spaces shall be $100 per story or portion thereof.

h. Condominium development (residential or commercial) common area and major systems (HVAC, gas, electrical, sprinklers, parking decks, and like components) shall be charged fees in the same manner as new commercial buildings.

i. The fee for the reprinting of duplicate certificate permits or certificates of

occupancy shall be $50.00.

j. The fee for a certificate of completion shall be $100.00.

k. Emergency call-out inspection shall be $300.00.

l. Life Safety inspection shall be $200.00 per floor.

m. Fire or water damage preliminary inspection shall be $200.00 per inspection.

(i) A non-profit entity applying for a permit for the development of not for profit

housing for the homeless may request an exemption from building permit fees. In such cases, the director shall investigate the application and decide whether the

application meets the criteria set forth in this subsection. For purposes of this

sub-section a non-profit development is that constructed by an entity recognized as non-profit under § 501(c)(3) of the

Internal Revenue Code or an entity meeting the requirements of § 501(c)(3).

(j) Development impact fees shall be imposed in accordance with Section 19-1001 et

seq. of the City of Atlanta Code of Ordinances.

(k) The fee for the registration of contractors pursuant to O.C.G.A. § 8-2-26 shall be

$100.00 per year.

(l) Fees for Additional Plan Review Services Requested by Applicant. By written

request to the director, an applicant may receive additional services at a cost above the normal permit fees and which shall

be performed by appointment outside of normal business hours at the discretion of the director, subject to availability of personnel and a written fee agreement

concerning the following rates:

a. Initial consultation and preliminary plan review (maximum of two hours).

Single family interior alteration $200.00 Commercial interior alterations $300.00 New Commercial (less than 8 stories) $500.00 New Commercial (8 stories and up) $1,000.00 Single family new construction $300.00 Land Disturbance $500.00

b. Expedited plan review. Requires initial consultation and payment at the listed hourly rate:

Single family interior alteration $150.00 hour Commercial interior alterations $200.00 hour New Commercial (less than 8 stories) $200.00 hour New Commercial (8 stories and up) $200.00 hour Single family new construction $200.00 hour Land Disturbance $200.00 hour

(m) Miscellaneous permits - where a minimum permit fee is set forth, the rate of $7.00 per thousand dollars of the value of work shall be used to determine if the permit fee is to be above the minimum.

a. Construction of new cellular communication tower or commercial

telecommunication

b. Co-location on existing towers For each new collocated antenna or other wireless facility on an existing wireless support structure or new equipment box within an existing ground

provided that all zoning, permitting, or other fee for review or inspection in the aggregate shall not exceed $500.

For each modification, meaning improvement, upgrade, expansion, or replacement of an existing antenna or other wireless facility on an

existing wireless support structure or within an existing equipment: $100

provided that all zoning, permitting, or other fee for review or inspection in the aggregate shall not exceed $500.

c. Awnings/Canopies—

d. Single-family residential carport or accessory building—Per

e. Single family residential garage or accessory building—Per

f. Single-family residential basement or attic:

Unfinished—Per sq. ft. $0.38 Build-out—Per sq. ft. . $0.33

g. Decks/Balconies/ Porches SF residential—Minimum

h. Re-roofing of existing structures—Minimum

i. Demolition of residential buildings—

j. Demolition of commercial buildings—

k. Retaining walls—

l. Fences 6 ft. or less in height—Minimum fee . $75.00

m. Fences greater than 6 ft. in height—Minimum

n. Paving or resurfacing—

o. SF Residential swimming pools or spas—

p. Commercial swimming pools or spas—

q. Sprinkler (up to 50 (More than 50 heads add $1.00 per head)

r. MEP permits— except public utility re-connection fee which shall be $50.00.

Each additional trade . $150.00 More than two plan reviews—Per review . . $150.00

s. SF and Duplex Online "Remove & Replace" . . $50.00 Limited to: hot water tanks, dishwashers and similar appliances;

kitchen cabinets; toilets, tubs, sinks and showers; interior or exterior painting only.

(n) Fees for services provided by the Zoning Enforcement Division—Where a minimum

permit fee is set forth, the rate of $150.00 per hour shall be used to determine if the permit fee is to be above the minimum.

a. Verification of non-conformity where necessary for determination of application for building permit— Minimum fee of $300.00.

b. Letters requesting verification of non-conformity—Minimum fee of $300.00.

c. Letters requesting zoning verification without investigation of nonconformity—Minimum fee of $100.00.

d. Verification of zoning for business license without investigation of nonconformity—Minimum fee of $50.00.

(o) Fee for sign permits—Where a minimum permit fee is set forth and the cost above the minimum is not rated per square

foot, the rate of $150.00 per hour shall be used to determine if the permit fee is to be assessed shall be above the minimum.

The rating of fees in square feet is for the purpose of determining the charge for

the installation of signs and does not determine whether a sign of a particular size will be allowed under the City of

Atlanta Sign Ordinance. All permit fees are payable upon application and are nonrefundable.

a. General advertising signs—New applications and conversions involving changing signs—Minimum fee $1,050.00.

b. Wall signs—New applications and conversions involving changing signs—Minimum fee of $150.00 plus $1.00 per square foot of sign area.

Where a second wall sign is reviewed as a part of the same application, only the $1.00 per square foot of sign area shall be charged for the second sign.

c. Freestanding signs—New applications and conversions involving changing signs—Minimum fee of

$450.00 plus $1.00 per square foot of sign area. Where a second freestanding sign is reviewed as a part of the same application, only the $1.00 per square foot of sign area shall be charged for the second sign.

d. Shopping center signs shall be charged at the same rate as freestanding signs.

e. Portable signs—$75.00.

(p) Fee for sign permits—Where a minimum permit fee is set forth in Chapter 28A of the Zoning Code forth and the cost set for the herein would rise above that fee, the fees charged herein shall be in the nature of an additional fee.

TABLE 100 cost per sq. ft.

Group (2009 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters,

with stage

211.15 203.98 198.73 190.05 178.25 173.30 183.31 162.97 156.05 A-1 Assembly, theaters,

without stage

193.16 185.99 180.74 172.06 160.31 155.36 165.32 145.04 138.12 A-2 Assembly, nightclubs 163.22 158.56 154.17 148.00 138.96 135.24 142.52 126.06 121.36 A-2 Assembly, restaurants,

bars, banquet halls

162.22 157.56 152.17 147.00 136.96 134.24 141.52 124.06 120.36 A-3 Assembly, churches 195.10 187.93 182.68 174.00 162.21 157.26 167.26 146.94 140.02 A-3 Assembly, general, community halls, libraries, museums

163.81 156.64 150.39 142.71 129.91 125.96 135.97 114.63 108.71 A-4 Assembly, arenas 192.16 184.99 178.74 171.06 158.31 154.36 164.32 143.04 137.12 B Business 164.76 158.78 153.49 145.97 132.45 127.63 139.92 116.43 110.93 E Educational 176.97 170.85 165.64 158.05 146.37 138.98 152.61 127.91 123.09 F-1 Factory and industrial,

moderate hazard

97.87 93.28 87.66 84.46 75.44 72.26 80.79 62.17 58.48 F-2 Factory and industrial,

low hazard

96.87 92.28 87.66 83.46 75.44 71.26 79.79 62.17 57.48 H-1 High Hazard,

explosives

91.74 87.15 82.53 78.33 70.49 66.31 74.66 57.22 N.P.

H234 High Hazard 91.74 87.15 82.53 78.33 70.49 66.31 74.66 57.22 52.53

H-5 HPM 164.76 158.78 153.49 145.97 132.45 127.63 139.92 116.43 110.93 I-1 Institutional, supervised

environment

164.82 159.04 154.60 147.90 135.84 132.25 144.15 121.88 117.55 Group (2009 International

Building Code) IA IB IIA IIB IIIA IIIB IV VA VB I-2 Institutional, hospitals 277.07 271.09 265.80 258.28 243.90 N.P. 252.23 227.88 N.P.

I-2 Institutional, nursing homes

193.00 187.02 181.74 174.22 160.98 N.P 168.16 144.96 N.P.

I-3 Institutional, restrained 187.72 181.73 176.45 168.93 156.64 150.82 162.87 140.63 133.13 I-4 Institutional, day care

facilities

164.82 159.04 154.60 147.90 135.84 132.25 144.15 121.88 117.55 M Mercantile 121.57 116.92 111.53 106.36 96.96 94.25 100.88 84.07 80.36 R-1 Residential, hotels 166.21 160.43 155.99 149.29 137.39 133.80 145.70 123.43 119.10 R-2 Residential, multiple

family

139.39 133.61 129.17 122.47 111.23 107.64 119.54 97.27 92.94 R-3 Residential, one- and

two-family

131.18 127.60 124.36 121.27 116.43 113.53 117.42 108.79 101.90 R-4 Residential, care/assisted living facilities

164.82 159.04 154.60 147.90 135.84 132.25 144.15 121.88 117.55 S-1 Storage, moderate

hazard

90.74 86.15 80.53 77.33 68.49 65.31 73.66 55.22 51.53 S-2 Storage, low hazard 89.74 85.15 80.53 76.33 68.49 64.31 72.66 55.22 50.53 U Utility, miscellaneous 71.03 67.02 62.71 59.30 52.86 49.43 56.33 41.00 39.06 (Ord. No. 2017-33(17-O-1307), §§ 1, 3, 4, 6-28- 17)

104.3. REFUND OF PERMIT FEES.

Within six months from the date of issuance of a permit, a refund request of 50% of the permit fee paid to date, excluding the nonrefundable application fee, may be granted for the following:

(a) When a permit has been issued in error as determined by the director provided

no work has commenced on that permit.

(b) When a permit has been issued and the job has been cancelled by the applicant, provided no work has commenced on that

permit.

(c) All applications for refunds shall be in writing and shall state the reasons for

the request. However no refund shall be issued for less than $50.00.

104.3.1. BUILDING PERMIT FEE REVIEW

REQUESTS FOR COMPLETED

PROJECTS.

(a) Applicability. An applicant for a building permit, or the owner of the property which is the subject of the permit (collectively referred to herein as the "owner"), for a project meeting the eligibility requirements herein has the right to request a building permit fee review under the procedures set forth herein.

(b) Eligibility. For a project to be eligible for building permit fee review, the director shall find:

(i) The project required the submission of plans and the calculation of the building permit fee from such plans using Table

100;

(ii) The Table 100 job cost calculation on which the city's building permit fee is

based exceeds the actual cost to construct the building or structure which is the

subject of the permit (the "project") by more than ten percent as indicated on

the building permit application;

(iii) The owner paid a plan review fee equal to one-half of the building permit fee

based on the cost of construction information provided to the director at the time of the submittal of the application for

plan review as required by Sec. 104.1(c);

(iv) The owner paid a final building permit fee payment which is the balance of the

fee based on the cost of construction information provided to the director at the time of the submittal of the application for plan review as required by Sec.

104.1(c); and

(v) The owner gave written notice of the request for a permit fee review, as

prescribed herein, at the time of final building permit fee payment.

(c) Notice. The notice of a request for a permit fee review must contain, at a minimum:

(i) The permit number;

(ii) The street address of the project;

(iii) The permit fee amount paid;

(iv) The permit holder's approximate expected cost to construct that part of the project for which the review is sought;

(v) A statement of demand for a permit fee review based on actual cost to construct a completed project including a statement

of the amount of the difference (greater than 10%) between the projected permit

fee based on Table 100 and the projected permit fee based on owner's expected

cost;

(vi) The name and street address for the person authorized to receive notices from the director. No post office box may be

used to receive notice from the director;

and (vii) A statement agreeing that the payment of a review fee associated with the

director's review of the permit fee review request as established by city council will be paid before a final certificate of

occupancy is issued.

(d) Building permit issuance authorized during building permit fee review. If the director finds that an owner is eligible for a building permit fee review, the director may issue a building permit, notwithstanding the requirement of Sec. 104.2(b) that the final permit payment be based on Table

100. While the permit review request is being processed in accordance with the procedures outlined in this section, the director may also conduct all inspections during the course of construction, including final inspection, and issue a temporary certificate of occupancy upon completion of construction. The director shall not issue a final certificate of occupancy until the owner pays the amount set forth in Sec. 104.2(b) or the amount approved by the Atlanta City Council.

(e) Required submittals for building permit fee review.

(i) Within 30 days of the date of the issuance of the building permit, the owner shall submit:

(1) An affidavit from a professional engineer or architect, registered in the State of Georgia swearing that the cost stated in the notice given to the director is expected to be the actual cost to construct the project and shall thereof, temporarily safe, whether the procedure prescribed in this section has been instituted or not.

105.5. VACATING BUILDINGS AND CLOSING STREETS.

When a building or structure is in an unsafe condition so that life is endangered thereby, the Director shall order and require the inmates and occupants to vacate the same forthwith. The Director shall, when necessary for the public safety, temporarily close sidewalks, streets, buildings, structures and places adjacent to such building or structure, and prohibit the same from being used.

105.6. LABOR AND MATERIALS.

For the purpose of this section, the Director may employ such labor and purchase such materials as may be necessary. Any costs incurred shall be paid out of the city treasury on certification of the Director.

105.7. RECOVERY COSTS.

The City Attorney or other prosecuting authority shall institute proper actions against the owner of premises for the recovery of costs incurred by the Director in the performance of emergency work.

(Ord. No. 1983-13, § 1, 3-11-83; Ord. No. 1983- 14, § 1, 3-11-83)

SECTION 106. VIOLATIONS

106.1. NOTICE.

Whenever the Director is satisfied that a building or structure, its systems, appliances or equipment or any work in connection therewith that is covered by this Code, is being erected, demolished, installed, altered or repaired in violation of the provisions or requirements of this Code, or in violation of plans or specifications submitted and approved thereunder, or of a permit issued thereunder, the Director shall serve a written notice or order upon the person responsible therefore directing discontinuance of such illegal action and the remedying of this condition that is in violation of the provisions or requirements of this Code.

In case such notice or order is not promptly complied with, the Director shall request the City Attorney or other proper prosecuting authority to institute an appropriate action or proceeding at law or in equity, to restrain, correct or remove such violation, or the execution of work thereon, or to restrain or correct the erection or alteration of, or to require the removal of, or to prevent the occupation or use of, the building or structure erected, constructed or altered, in violation of, or not in compliance with, the provisions of this Code or with respect to which the requirements thereof, or of any order or direction made pursuant to provisions contained therein, shall not have been complied with.

Whenever, in the Director's opinion, defective or illegal work in violation of a provision or requirement of this Code is in progress, an order shall be issued, in writing or otherwise, to stop such work, and may require suspension of all work until the condition in violation has been corrected. In addition, whenever any building is being erected, altered or repaired in such a way as to allow the use of said property in violation of the Atlanta Zoning Ordinance, the Director shall order the work stopped. Anyone violating the provisions of said stop work order shall be guilty of an offense.

(a) Any person, firm, partnership, corporation or other legal entity who violates a provision of this Code or fails to comply therewith or with any of the requirements thereof shall be deemed guilty of an offense and upon conviction thereof shall be punished by a fine of not less than $1,000.00, and/or by imprisonment for not more than 60 days. Where any offense continues from day to day, each days continuance thereof shall be deemed a separate offense.

(b) Where anything in violation of this Code shall exist, the owner, lessee, architect, engineer, builder, contractor, agent, person or corporation employed in connection therewith, who may have assisted in the commission of such violation shall each be guilty of a separate offense and upon conviction thereof shall be fined as herein provided.

(c) Any work performed after the issuance of a Stop Work Order shall be demolished promptly and completely at the expense of the responsible party. Demolition shall be carried out in accordance with applicable regulations and safety standards.

(d) No permits shall be issued for further construction, renovation, or alteration of the structure in question until it has been restored to its state as of the date the Stop Work Order was issued.

(Ord. No. 2024-49(24-O-1093), § 1, 8-19-24) The imposition of the penalties herein

prescribed shall not preclude the City of Atlanta from instituting an appropriate civil action or proceeding to prevent an unlawful erection, construction, demolition, re-construction, alteration, repair, conversion, maintenance or use, or to restrain, correct or abate a violation, or to prevent the use of any equipment, appliance or system covered by this Code.

SECTION 107. ADVISORY BOARD

107.1. APPOINTMENT.

There is hereby created a Board to be known as the Building Code Advisory Board, consisting of nine (9) members to be appointed by the Mayor. Each member shall be either an architect, engineer, or contractor with not less than ten

(10) years experience in the field. The Board will elect one of its members as Chairman. Five members of said Board shall constitute a quorum thereof for the transaction of any and all business properly coming before them. All terms shall be for a period of two years, except that any term shall be automatically extended until such time as the Mayor appoints a successor.

The Bureau of Buildings shall provide secretarial services to the Advisory Board and shall make a detailed record of all its proceedings, which shall set forth the reasons for the decisions and the vote of each member participating therein, the absence of a member, and the failure of a member to vote. These records shall be submitted to the Board for approval and then kept on file as a public record in the Bureau of Buildings.

The Board shall establish rules and regulations for its own procedure not inconsistent with the provisions of this Code. The Board shall meet upon the call of the Chairman for the purpose of considering and advising the Director upon any matter where their advice and counsel is requested.

Whenever any person shall be dissatisfied with any ruling, decision or order of the Director, such person may make a written request to the Chairman of the Advisory Board for a hearing thereon. The Chairman of the Board shall thereupon call the Board to meet to hear and investigate such complaints. After a full and complete hearing on all questions in controversy, the Advisory Board shall render its opinion, concurring in, or recommending such changes in the order, ruling or decision of the Director as it may deem fit or proper under the circumstances.

Each action of the Board shall be in writing, copies of which shall be certified to the Director and the complaining party or parties. The powers of said Building Code Advisory Board shall be limited to advisory powers only. Any advice, decision, order or findings of the Board may be accepted or rejected in whole or in part, by the Director.

Any appellant, or complaining party requesting a hearing before the Advisory Board shall pay the sum of fifty ($50.00) dollars to the City of Atlanta.

Each member of the Advisory Board shall be paid fifteen ($15.00) dollars by the City of Atlanta for each meeting attended.

(Ord. No. 1983-13, § 1, 3-11-83; Ord. No. 1983- 14, § 1, 3-11-84)

[Chapter 2, Definitions, Section 201.2, Tense, Gender and Number, are modified as follows:]

[The following definitions for dormitories, fire wall, hotels and lodging houses are deleted in their entirety and the following substituted in lieu thereof:]

DORMITORIES include buildings or spaces in buildings where group sleeping accommodations are provided for persons not members of the same family group in one room or in a series of closely associated rooms under joint occupancy and single management, as in college dormitories, fraternity houses, military barracks, ski lodges;

with or without meals, but without individual cooking facilities.

FIRE WALL is a 4 hour fire resistive wall of masonry or monolithic concrete, having protected openings, which restricts the spread of fire and extends continuously from the foundation to or through the roof and has sufficient strength under fire conditions to allow collapse of construction on either side without collapse of the wall.

HOTELS include buildings or groups of buildings under the same management in which there are more than 15 sleeping accommodations for hire, primarily used by transients who are lodged with or without meals, whether designated as a hotel, inn, club, motel, or by any other name.

So-called apartment hotels shall be classified as hotels because they are potentially subject to transient occupancy such as hotels.

LODGING or ROOMING HOUSES include buildings in which separate sleeping rooms are rented providing sleeping accommodations for a total of 15 or less persons, on either a transient or permanent basis; with or without meals, but without separate cooking facilities for individual occupants.

[The following definitions are added:]

DIRECTOR OF THE BUREAU OF BUILDINGS means the person duly authorized to fill that position or said person's authorized representative; it shall have the same meaning as Building Official.

GARAGE means a building or structure or a portion thereof, in which a motor vehicle containing a flammable fluid in its fuel storage tank is stored, housed, kept, repaired or serviced;

AUTOMOTIVE SERVICE GARAGE means a garage where no repair work is done except exchange of parts and maintenance requiring no open flame, cutting, welding or the use of highly flammable liquids;

BASEMENT PARKING GARAGE means an enclosed parking garage located in a basement, and includes an underground parking garage;

CARPORT means a garage attached to a dwelling and having one or more open sides;

ENCLOSED PARKING GARAGE means a garage having exterior enclosed walls and used for the parking of motor vehicles;

OPEN AIR PARKING GARAGE means a garage having not less than 50 percent of two sides of the garage open to the air at each story and used for the parking of motor vehicles;

REPAIR GARAGE means a garage wherein major repairs may be made to more than two motor vehicles at a time.

(Ord. No. 1983-13, § 2, 3-11-83; Ord. No. 1983- 14, § 2, 3-11-83)

[Section 301.1 is amended to read as follows:]

301.1. GENERAL.

For the purpose of this Code, the Fire District (Fire Limits) is designated in Section 8-2074 of the Code of Ordinances of the City of Atlanta.

(Ord. No. 1983-13, § 3, 3-11-83; Ord. No. 1983- 14, § 3, 3-11-83)

[Chapter IV is modified as follows:]

Table 403, Minimum Requirements for Large Assembly be modified to read 2 hour in lieu of 4 hour.

[Section 403.2 is amended to read as follows:]

403.2. TENANT SEPARATION.

In a building, or portion of a building of a single occupancy classification, when enclosed spaces are provided for separate tenants, such spaces shall be separated by not less than one (1) hour fire resistance, unless otherwise specified.

[Section 403.2.12 is amended to read as follows:]

403.2.12. Exterior Sound Transmission.

[B]403.2.12 Exterior Sound Transmission.

Noise-sensitive uses, such as residential developments, hotels, hospitals, and schools must be protected from new S-2 occupancy group development that causes discernable increases in noise levels because of new equipment associated with the new construction. Noise from exhaust fans, emergency generators associated with a new building must be mitigated through physical measures or operational limits using nationally recognized standards for equipment sound transmission. Exterior sound transmission serving buildings or structures shall be installed in accordance with Section 425 of the International Building Code as amended by the City of Atlanta.

(Ord. No. 2018-58(18-O-1659), § 3, 11-28-18) [Section 412.7(e) is amended to read as follows:]

412.7(e) Enclosed and basement parking decks shall be provided wit[h] a mechanical ventilation system capable of providing six (6) air changes per hour for each level.

(Ord. No. 1983-13, § 4, 3-11-83; Ord. No. 1983- 14, § 4, 3-11-83)

[Section 425 is created to read as follows:]

SECTION 425 EXTERIOR SOUND

TRANSMISSION

425.1. CONDITIONS.

Any new proposed project is to mitigate the project build-out noise level to a maximum based on Table 425.1 at:

a. 5-feet above finished grade level; and

b. 20-feet from the rear/side of the property of the structure, unless the rear/side is less than 20-feet deep where the measurement shall be at the property line.

i. Where the useable rear/side is less than 20-feet deep, the measurement may be taken at the back of the useable rear/side property boundary.

Noise-sensitive uses, such as residential developments, hotels, hospitals, and schools must be protected from new development that causes discernable increases in noise levels because of new equipment associated with the new construction. Noise from exhaust fans, chillers, condensing units, scrubbers, energy recovery systems, refrigeration equipment, emergency generators associated with a new building must be mitigated through physical measures or operational limits using nationally recognized standards for equipment sound transmission.

425.1.1. Analysis.

Prior to approval of the proposed project and issuance of any permit pursuant to Section 425.1, an Acoustical Analysis Report and appropriate plans shall be submitted, which illustrates the feasibility of the exterior mitigation measures required to achieve noise mitigate requirements.

The plans must describe the noise generation potential of the proposed project and proposed noise attenuation measures to assure that an environment free from excessive or harmful noise is achieved and maintained. The report shall be prepared under the supervision of a certified acoustical consultant or engineer and submitted to the Office of Buildings for review and approval.

The approved attenuation features shall be incorporated into the plans and specification of the proposed project.

Table 425.1 Receiving Property LEG (h) dB(A)a Residential 55 Commercial 65 Industrial 70

a. Building and parking garage equipment average noise level over a one (1) minute to minimize the possibility of interfering noise.

b. At no time shall noise levels be produced that exceed 65 dB(c) Leq (one minute) at a receiving property line.

c. Impulsive sound sources shall not exceed 100 dB(c) Leq. measured at a receiving

at a receiving property line.

425.2. SOUND TRANSMISSION

CHARACTERISTICS.

All new parking garage, S-2 occupancy group classification exhaust fans and building's emergency generators and HVAC equipment present a unique problem in relation to sound transmission. The following methods shall be utilized to regulate noise transmission:

425.2.1. Shock Mounting of Site Operational Equipment.

All permanent mechanical equipment, such as exhaust fans, emergency generators, motors, compressors, pumps, and compactors, which are determined by the building official to be a source of structural vibration or structure-borne noise, shall be shock-mounted in inertia blocks or bases and/or vibration isolators in a manner that reduce the contributing factors of noise transmission.

425.2.2. Noise Mitigation.

A barrier should be designed that directs, reduces, or provides a dense enough barrier to prevent significant noise transmission. If a wall or similar design is used, it must be high enough, and long enough to shield the receiver from adjacent property and direct line of sight to the noise source. Barrier design should be determined through the Acoustical Analysis Report findings.

The building mechanical devices that are common in buildings shall be selected to prevent excessive noise transmission from the new project to adjacent property or common spaces that are considered habitable.

425.2.2.1. Parapets.

Parapets can be used as a barrier if the Acoustical Analysis Report findings support the sound mitigation but must be installed completely around all rooftop ventilation systems, with dampening materials.

425.2.2.2. Mechanical Equipment.

All new mechanical equipment associated with onsite development of an S-2 structure shall comply with sound transmission requirements, which prohibits noise from air conditioning, refrigeration, heating, pumps, generators, and filtering equipment from exceeding the ambient noise level to other adjacent properties.

The required acoustical analysis for adjacent properties intended for the use and the enjoyment of residents that have an exterior noise level of 60 dB(A) or above. Incorporate necessary mitigation measures into the project design that adverse impacts caused by the new noise generated by new developments.

425.2.2.2.1. Mechanical Equipment Sound Transmission.

Equipment sound ratings of new heating ventilation and air condition (HVAC) equipment installed according to the approval of the Acoustical Analysis Report findings, design information and Section 425.1. New permits for HVAC equipment S-2 parking structures shall be issued only where the sound rating of the proposed equipment does not exceed dBA value in Table 425.1.

425.2.2.2.3. Mufflers.

Equipment used for the S-2 building operation or that are used to support a building by the parking structure shall utilize the best available noise control techniques. All new generators shall be improved using noise reduction mufflers, equipment design, use of intake silencers, fixed damping devices, ducts, engine enclosures, damping material, and acoustically-attenuating shields or shrouds. The noise reduction method shall be included in the plans submittal meeting Table 425.1.

425.2.2.2.4. Replacement of Mechanical Equipment.

Existing equipment within a parking structure mentioned in Section 425 that is replaced shall comply with sound transmission requirements, which prohibits noise from air conditioning, refrigeration, heating, pumps, generators, and filtering equipment from exceeding the ambient noise level to other adjacent properties. In some cases, the project will be reviewed for approval using the Acoustical Analysis Report findings, design information and Section 425.1. New

APPENDIX A—BUILDING CODE AMENDMENTS

permits for HVAC equipment in or adjacent to other buildings or structures shall be issued only where the sound rating of the proposed equipment does not exceed dBA value in Table 425.1.

425.2.3. Special Inspections for Sound Levels.

An approved agency, funded by the building owner, shall furnish report(s) of test findings indicating that the sound level results follow this section, applicable laws and ordinances, and the construction documents. Discrepancies shall be brought to the attention of the design professional and Chief Building Official prior to the completion of said work. A final testing report documenting required testing and corrections of any discrepancies noted in prior tests shall be submitted by the design professional to the Chief Building Official or designed staff for purposes of demonstrating compliance.

425.2.4. Testing for mechanical and electrical generator equipment outside of buildings.

Special inspections shall be conducted in accordance with Section 425.2.5 to demonstrate compliance with the requirements of Section

425. Testing shall be conducted following the complete installation of the equipment or generators, the installation of sound reduction barriers, and balancing and operation of the equipment or generators. Testing shall be at locations representing each side of the project building. Such testing shall demonstrate that the equipment is capable of compliance with the limits.

425.2.5. Testing for building background noise.

Special inspections shall be conducted in accordance with Section 425.2.5 to demonstrate compliance with the requirements of Section

425. Testing shall be executed for all mechanical equipment associated with the building or structure listed in Table 425.1. Testing shall occur following the complete installation of the equipment and systems, the installation of any sound reduction barriers, and balancing and operation of the equipment and systems.

425.2.6. COMMISSIONING.

Where application is made for construction permit as described in this section, the registered design professional of record shall perform commissioning during construction and after occupancy as required by Table 425.2.6 The registered design professional of record and engineers of record involved in the design of the project permitted is able to act as the commissioning approving agency provided those personnel meet the qualification requirements of this section in compliance with Section 425. The registered design professional shall provide written documentation to the Chief Building Official or designee demonstrating competence and relevant experience or training.

Table 425.2.6 Commissioning Plan Requiring Verification Preoccupancy Post-Occupancy Method Occurrence Reference Preoccupancy Post-Occupancy Sound Transmission Mechanical and emergency generator equipment X None Field testing and verification See Section

425.2.3 None 425.2.3

HVAC

background sound X None Field testing and verification See Section

425.2.4 None 425.2.3

425.3. PLAN REVIEW INFORMATION.

The following information should be reported in the building design package:

1. Statement of conformance to Section 425.1, the design professional should state to which performance is designed to and

confirm which method of performance assurance is conducted.

2. Description of all equipment that cause or present a unique problem in relation

to sound transmission.

a. A complete description of the method to reduce the sound rating of the proposed equipment does not exceed dBA value including all the constructional elements or devices used for the proposed noise mitigation.

3. The description shall be measured using the most current acoustical standards,

and best engineering practice. The description should also list any restrictions in materials or construction techniques.

4. The project's estimated site boundary noise projection must be part of the

project plan so the building mechanical devices that are common in parking structure shall be selected to prevent excessive noise transmission from the new project to adjacent property or common spaces that are considered occupiable space.

5. In new construction of the parking structure, the Acoustical Analysis Report must be submitted with the construction

plans. The plans must contain the findings and methods of compliance with Section 425.

425.4. INSPECTION PROCESS.

The following information should be to the building inspector during the construction or replacement of the noise:

1. Statement of conformance and commissioning to Section 425 by the design professional indicating the installation is certified to meet the dB(A) of Table 425.1 and the performance is installation

conforms to the design documents.

(Ord. No. 2018-58(18-O-1659), § 1, 11-28-18) [Section 501.3.1.2 is amended to read as follows:]

[B]501.3.1.2 Exterior Sound Transmission.

Noise-sensitive uses, such as residential developments, hotels, hospitals, and schools must be protected from new S-2 occupancy group development that causes discernable increases in noise levels because of new equipment associated with the new construction. Noise from exhaust fans, emergency generators associated with a new building must be mitigated through physical measures or operational limits using nationally recognized standards for equipment sound transmission. Exterior sound transmission serving buildings or structures shall be installed in accordance with Section 425 of the International Building Code as amended by the City of Atlanta.

(Ord. No. 2018-58(18-O-1659), § 2, 11-28-18) [Section 506 is amended to read as follows:]

SECTION 506. SPECIAL PROVISIONS FOR

HIGH RISE GROUP R-RESIDENTIAL AND

GROUP B-BUSINESS BUILDINGS

506.1. GENERAL.

These requirements shall apply to:

(a) Group R—Residential buildings 7 stories or more in height; and

(b) Group B—Business buildings having floors more than 75 feet in height above the lowest level of fire department

vehicular access.

Such requirements shall be in addition to other applicable requirements of this code.

506.2. SPRINKLER SYSTEM.

An approved, supervised, sprinkler system shall be provided throughout every building.

The system shall be designed and installed in accordance with NFPA No. 13 Standard for the Installation of Sprinkler Systems.

APPENDIX A—BUILDING CODE AMENDMENTS

506.3. BUILDING EMERGENCY COMMUNICATION SYSTEM.

(a) There shall be two (2) approved electrically supervised communication systems as follows:

1. A two-way fire department communication system. The system shall provide two-way communication capabilities

between the Central Control Station and the following terminal areas: elevators, elevator lobbies, exitway access corridors and exitway stairways.

2. A one-way (address) communication system for the transmission of the voice alarm system message to the building

occupants. The system shall provide oneway communication capabilities between the Central Control Station and

throughout the following terminal areas:

elevators, elevator lobbies, exitway access corridors and exitway stairways, dwelling units, and hotel guest rooms or suites.

(b) The two-way fire department communication system may be combined with the one-way (address) communication system.

506.4. FIRE-SMOKE DETECTORS.

(a) An approved, automatic product-of-combustion (other than heat) detection system shall be installed in the following locations:

1. In boiler, furnace, and mechanical rooms and elevator lobby areas.

2. In mechanical air handling systems, including warm air heating systems, plain ventilating systems, combination heating and ventilating systems, air cooling systems, air conditioning systems, and

exhaust systems in accordance with NFPA 90A.

(b) The indicator panels shall be located in the Central Control Station.

506.5. FIRE ALARM.

An approved fire alarm system conforming with NFPA 72 shall be installed. The annunciator panel shall be located in the Central Control Station.

506.6. SMOKE CONTROL.

(a) Natural or mechanical ventilation for the removal or control of products-of-combustion shall be provided in every story and shall consist of one or more of the following:

1. Panels or windows, in exterior walls.

Such venting facilities shall be provided at the minimum rate of 2% of the exterior wall area in each story, and distributed around the perimeter at not more than

fifty (50) foot intervals. Such panels or windows shall be clearly identified and

shall have a minimum area of six square feet with at least a dimension of two (2) feet.

2. Approved tempered glass may be used in lieu of openable panels described above.

3. Acontinuous shaft or shafts through which smoke and heat can be mechanically vented to the outdoors. The size of any shaft shall be uniform throughout and of such dimen-sion as to provide one (1) air change per minute in the largest compartment served by that shaft. Openings into shafts shall be protected with an automatic single piece shutter located as high in the room as

possible and designed to vent the entire compartment.

4. The mechanical air handling equipment may be designed to direct return and ex-haust air directly to the outdoors under fire conditions.

5. Any other approved design which will pro-duce equivalent results.

(b) Exit stairways shall be mechanically pres-surized during a fire situation to 0.15 inches of water column minimum differential pressure across any closed stairway door with outside air in a manner approved by the Director. The maximum degree of pressurization shall be such that the opening of stairway doors can be accomplished with a force not to exceed twenty-five (25) pounds applied at the door knob. Additionally, the pres-surization system shall be designed with assump-tion that during a fire situation the following doors are open: the fire door, adjacent doors above and below the fire floor, and the door of exit discharge from the shaft; and the minimum ve-locity through the four opened doors shall be no less than 150 feet per minute.

(c) Elevator shafts shall be protected in a man-ner approved by the Director to prevent the entry of smoke or other products of combustion, or shall be pressurized to 0.10 minimum to 0.20 maxi-mum inches of water column differential pressure across any elevator door in a manner approved by the Director.

(d) Required ventilation of shafts as set forth in other sections of this code may be modified by approved means where tempered outside air is required for the pressurization of such shafts.

Also, approved motorized dampers, signalled by smoke/ionization detectors, may be used to effect the necessary control of required pressurization.

(e) Activation of all pressurization system shall occur due to response of: any smoke/ionization detector, manual fire alarm system, and sprinkler flow detector if installed. Means for deactivation of the pressurization system shall be provided in the Central Control Station. Additionally, the design of the pressurization system shall insure that no smoke be introduced in the shaft as a result of contamination of the fresh air intake(s).

(f) It shall be the responsibility of the architect, or a designated agent, to submit a comprehensive written description of all systems that are in-stalled as a result of this subsection. Copies of this report shall be submitted to the City of Atlanta, Bureau of Fire Services and the City of Atlanta, Bureau of Buildings, as well as being permanently posted in the Central Control Sta-tion.

Pressurization Commentary:

1. Weather conditions may require special consideration in stair and elevator shaft pressurization designs. It may be neces-sary to introduce outside air heated to

approximately the same temperature as is maintained in the building in order to limit pressures within the shafts to the range of pressures required by this subsection.

2. Stack effect in high rise buildings will make permanently opened louvers in the

top of stair and elevator shafts undesirable because of loss of heated air.

3. Relative to stairway pressurization, refer-ence should be made to the ASHRAE Guides or other appropriate data for door leakage values in order to facilitate design. How-ever, it is noted for information purposes that full scale testing has indicated that leakages of approximately 200 cfm per door are representative, and that the propeller type fan having a characteristic fan perfor-mance curve of high volume/low pressure

has been found to produce desired results.

LDC A:19

506.7. ELEVATORS.

(a) Elevators shall be designed, constructed and maintained in accordance with the require-ments of the City of Atlanta Elevator Code. (See Scope)

(b) At least one elevator for Fire Department access to any floor shall be provided. The elevator shall open into a lobby, which may serve addi-tional elevators, and shall be separated from the remainder of the building by construction as required for corridors. An elevator may be within a smokeproof enclosure which is either vented to the outdoors or pressurized by a mechanical air supply.

506.8. MODIFICATIONS.

When an approved, supervised, sprinkler sys-tem is installed in accordance with subsection 506.2, the following modifications to this code are permitted:

(a) The fire resistance rating of shafts, other than exitway stairway and elevator enclo-sure shafts, may be reduced to one (1) hour.

(b) The fire resistance rating of partitions sep-arating dwelling units from corridors and other occupancies in multifamily houses

may be reduced to one-half (¥2) hour.

(c) The fire protection rating of corridor doors from guest rooms in hotels and dwelling

units in multifamily houses may be re- duced to twenty (20) minutes. Approved one and three-quarter (144) inch solid bonded wood core doors of the flush type may be accepted. However, all such doors opening into a public corridor shall be equipped with approved door closers.

(d) Acclass I or Class III Standpipe shall be provided.

506.9. CENTRAL CONTROL STATION.

A central control station for fire department operations shall be provided in an approved loca-tion. It shall contain the following listed facilities when they are required by this section:

1. Building emergency communication sys-tem panel and apparatus.

Fire detection system panel.

Fire alarm system panel.

Status indicator and controls for elevators.

oR © Controls for pressurization and air han-dling systems used for pressurization.

id Sprinkler valve and waterflow detector in-dicators.

7. Fire department telephone.

Standby power controls.

Public telephone.

10. Exitway stairway door unlocking system.

506.10. STANDBY POWER SYSTEM.

A permanently installed standby power gener-ation system conforming to the requirements of the Electrical Code of the City of Atlanta shall be provided. The system shall be equipped with approved means for automatically starting the generator upon failure of the normal electrical service and for automatic transfer and operation of all functions, required by this section, at full power within sixty (60) seconds of such normal service failure. System supervision devices with manual start and transfer features shall be pro-vided at the central control system.

506.11. POWER REQUIREMENTS.

The power requirement shall be determined so as to provide standby service to the following listed facilities:

1. Building emergency communication sys-tem

Fire department elevator Mechanical pressurization systems Fire alarm system Fire detection system Fire protection equipment and devices Noa rf OD Exitway and other emergency lighting

8. Exitway stairway door unlocking system

506.12, FUEL SUPPLY.

An on-premises fuel supply adequate for two (2) hours full demand operation of the system shall be provided.

LDC A:20

506.13. EXIT STAIRWAYS.

(a) All exit stairway doors when locked from the stairway side shall have approved locksets with the capability of being unlocked remotely upon a manual signal from the Central Control Station.

(b) Emergency telephones shall be provided at not less than every fifth floor in each required exitway stairway which is normally locked from the stairway side.

(Ord. No. 1983-13, § 5, 3-11-83; Ord. No. 1983-14, § 5, 3-11-83)

Chapter V, Special Occupancy Requirements, Sec-tion 508, Accessibility for the Physically Disabled and/or Handicapped, be deleted in its entirety and Part VI, Chapter 91-11 of the State of Georgia Code entitled “Miscellaneous Provisions” and deal-ing with the requirements for handicapped acces-sibility in buildings, be adopted in lieu thereof.

(Ord. No. 1983-13, § 6, 3-11-83; Ord. No. 1983-14, § 5, 3-11-83)

Chapter VII, Fire Protection Requirements be modified as follows:

1. That Section 701.3(c) be deleted in its en-tirety and the following Section 701.3(c) be in-serted in lieu thereof:

701.3(c) Elevators shall not be in a common enclosing shaft with a stairway.

2. That Note 4 of Table 700 be deleted in its entirety.

3. That Section 702.3—Wall and Partition Re-quirements by Occupancy—be deleted in its en-tirety and the following Section 702.3 be inserted in lieu thereof:

702.3. WALL AND PARTITION REQUIRE-

MENTS BY OCCUPANCY.

All walls and partitions shall provide not less than the degree of fire resistance required in Table 700, except as modified in the Life Safety Code, NFPA 101.

4. That Section 706.6, Wood Shingles and Shakes, first paragraph, be deleted in its entirety and be substituted by the following:

Outside the Fire District, single family dwell-ings located not less than thirty (30) feet from the property line may be roofed with grade labeled No. 1 or No. 2 Wood Shingles and No. 1 Shakes with a minimum butt thickness of one-half (1/2) inch, securely fastened with rust resistant nails.

(Ord. No. 1983-13, § 7, 3-11-83; Ord. No. 1983-14, § 7, 3-11-83)

Chapter IX, Sprinklers and Standpipes, Section 902.3(b) and (c) be deleted in its entirety.

(Ord. No. 1983-13, § 8, 3-11-83; Ord. No. 1983-14, § 8, 3-11-83)

Chapter XI, Means of Egress Requirements be deleted in its entirety and the following be sub-stituted in lieu thereof:

1101.1. GENERAL PROVISIONS.

In every building hereafter erected, means of egress shall comply with the minimum require-ments of this Chapter. Except as provided in this Chapter, all buildings and structures shall be provided with means of egress which shall comply with the Rules of the Georgia Safety Fire Com-missioner, as amended and shall comply with the Life Safety Code (NFPA 101-1985).

(Ord. No. 1983-13, § 9, 3-11-83; Ord. No. 1983-14, § 9, 3-11-83; Ord. No. 1989-89, § V, 12-22-89) That Chapter XII, Minimum Design Loads, Sec-tion 1205, Wind Loads, be deleted in its entirety and the following be substituted in lieu thereof:

SECTION 1205. WIND PRESSURE

1205.1. WHEN CONSIDERED.

All buildings and structures shall be designed to resist a horizontal wind pressure on all sur-faces exposed to the wind, allowing for wind in any direction, in accordance with the following table. No allowance shall be made for the shield-ing effect of other buildings or structures. The

LDC A:21

height is to be measured above the average level of the ground adjacent to the building or struc-ture.

(A) (B) Wind Pressure Wind Pressure Height Zone (Lbs. Per Sq. (Lbs. Per Sq.

(Feet) Ft.) Ft.)

Less than 30 15 25 30—49 20 30 50—99 25 40 100—200 30 45 201 & above ANSI A-58.1 ANSI A-58.1

GENERAL NOTES

1. The values shown in column (A) above shall apply to the above structural frame. The values shown in column (B) above shall apply to veneers, screens, column walls, panel walls, ornamental attachments, and other attachments, together with their connections to the structural frame.

2. All buildings greater than 200 feet in height shall be designed totally in accordance with ANSI A-58.1 - 1982, using the applicable Exposure B or C with basic wind speed of 80 mph.

3. For use in Table 5 (H/T Lateral Support Ratios for Exterior Masonry Walls) Section 1405, a minimum load of 25 psf shall be assumed with a maximum wall height limitation of 12 feet. Walls exceeding 12 feet in height shall not be acceptable without a structural engineering analysis.

1205.2. EXTERIOR WALLS.

Exterior walls shall be designed to withstand the pressure specified in Section 1205.1 acting either inward or outward.

1205.3. ROOFS.

(a) The roofs of buildings and structures shall be designed and constructed to withstand pres-sures, acting outward normal to the roof surface equal to 1¥%4 times the pressures specified in section 1205.1. The height is to be taken as the vertical distance from the average elevation of the ground adjoining the building to the average elevation of the roof.

(b) Roofs or sections of roofs with slopes greater than 30 degrees shall be designed to withstand pressures, acting inward normal to the surface, equal to these specified in Section 1205.1 and applied to the windward slope only.

(c) Parapets, overhanging eaves and cornices shall be designed and constructed to withstand outward pressures equal to twice those specified in Section 1205.1.

1205.4. CHIMNEYS, TANKS AND TOWERS.

(a) Chimneys, tanks, solid towers and similar structures shall be designed and constructed to withstand the pressures specified in Section 1205.1 multiplied by the following factors:

Shape in Horizontal Cross Section Factor

(b) Radio towers and other towers of trussed construction shall be designed to withstand the wind pressures specified in Section 1205.1 multi-plied by the following factors:

Tower on total projected area of elements, wind-ward side

Wind normal to one side 3 or 4 cornered tower with flat or angular sections 2.20 Wind on corner 3-cornered structure 2.20 4-cornered metal structure 2.40 4-cornered wood structure 2.60 Individual elements on projected area Cylindrical Sections 2 in. or less in diameter 1.00 Over 2 in. in diameter 0.80 Flat or angular sections 1.30

1205.5. SIGNS AND OUTDOOR DISPLAY

STRUCTURES.

(a) For the purpose of determining wind pres-sures all signs shall be classified as either open or solid. Signs in which the projected area exposed to

LDC A:22

wind consists of 70% or more of the gross area as determined by the overall dimensions shall be classed as solid signs; those in which the projected area is derived from open letters, figures, strips, and structural framing members, the aggregate total area of which is less than 70% of the gross area so determined, shall be classed as open signs.

(b) All signs shall be designed and constructed to withstand wind pressures applied to the projected exposed area, allowing for wind in any direction, in accordance with the following table:

Wind Pressure Pounds Per Square Foot Height from Ground to Top of Sign in feet Solid Signs Open Signs Less than 30 28 39 30—49 33 46 50—99 44 62 100—199 50 70 For ground signs 30—49 feet in height the tabular values for height of less than 30 feet may be used.

1205.6. OTHER STRUCTURES.

The design wind pressures for structures not covered in this section 1205 shall be in accordance with the generally accepted engineering practice and shall be subject to the approval of the Director.

1205.7. STABILITY.

The overturning moment due to wind pressure shall not exceed 50 percent of the moment of stability due to the dead load only, unless the building or structure is securely anchored to the foundation to resist this force.

(Ord. No. 1983-13, § 10, 3-11-83; Ord. No.

1983-14, § 10, 3-11-83) That Section 1206, Alternate Wind Loads for Low Rise Buildings and Section 1207, Seismic Design Requirements be deleted in their entirety.

(Ord. No. 1983-13, § 11, 3-11-83; Ord. No.

1983-14, § 11, 3-11-83) That the following footnote (e) be added to Chapter XIV, Masonry Construction, Table 5, Section 1405, H/t Lateral Support Ratios for Exterior Masonry Walls:

(e) Use 25 psf loading; maximum allowable height of wall 12 feet acceptable without an engineering analysis.

(Ord. No. 1983-13, § 12, 3-11-83; Ord. No.

1983-14, § 12, 3-11-83)

SECTION 1300. ROOFING REFLECTANCE

STANDARDS

1300.1. APPLICABILITY.

The provisions of this section shall apply to all new building construction and roof replacements.

(Ord. No. 2025-18(25-O-1310), § 1, 6-11-25)

1300.2. STANDARDS.

(a) Unless an exception in subsection (c) applies, roof coverings over conditioned spaces on steep-slope roofs (roof slope > 2:12) shall be constructed of materials that achieve:

(i) A 3-year aged solar reflectance not less than 0.21 as determined by the ANSI/

CRRC S100 Standard or as certified to the City of Atlanta by the manufacturer;

or (ii) A 3-year aged solar reflectance index not less than 20 as determined by the ANSI/

CRRC S100 Standard or as certified to the City of Atlanta by the manufacturer.

(b) Unless an exception in subsection (c) applies, roof coverings over conditioned spaces on low-slope roofs (roof slope " 2:12) shall be constructed of materials that achieve:

(i) A 3-year aged solar reflectance not less than 0.70 as determined by the ANSI/

CRRC S100 Standard or as certified to the City of Atlanta by the manufacturer;

or (ii) A 3-year aged solar reflectance index not less than 85 as determined by the ANSI/

CRRC S100 Standard or as certified to the City of Atlanta by the manufacturer.

(c) The requirements of this section shall not apply to:

(i) Roof areas covered by living vegetation or equipment reasonably necessary to maintain such vegetation;

(ii) Roof areas designed for and used as outdoor recreation space by the occupants of the building;

(iii) Roof areas containing equipment required by the International Fire Code;

(iv) Roof areas that comprise 3% or less of a building's gross floor area; or

(v) Repairs to existing roofs that do not require full replacement of the structure's roof.

(Ord. No. 2025-18(25-O-1310), § 1, 6-11-25; Ord.

No. 2026-09(26-O-1154), § 1, 3-11-26)

SECTION 1301. AIR-SUPPORTED

STRUCTURES

1301.1. APPLICABILITY.

The provisions of this section shall apply to all new building construction.

(Ord. No. 2025-37(25-O-1474), § 1, 10-6-25)

1301.2. DEFINITIONS.

Air-Inflated Structure a structure that uses air-pressurized membrane beams, arches, or other elements to enclose space. Occupants of such a structure do not occupy the pressurized area used to support the structure.

Air-Supported Structure a building wherein the shape of the structure is attained by air pressure and occupants of the structure are within the elevated pressure area.

(Ord. No. 2025-37(25-O-1474), § 1, 10-6-25)

1301.3. REGULATIONS.

The construction of air-inflated structures and air-supported structures is prohibited.

(Ord. No. 2025-37(25-O-1474), § 1, 10-6-25)

APPENDIX B

ELECTRICAL CODE AMENDMENTS*

CHAPTER I. ADMINISTRATION

101.1. TITLE.

This ordinance shall be known and may be cited as “The Electrical Code of the City of Atlanta, Georgia 1992,” hereinafter referred to as “this Code.”

101.2. SCOPE.

This Code provides for matters concerning, af-fecting or relating to the installation, erection, alteration, repair, use and maintenance of electri-cal systems, including low voltage in the City of Atlanta, except insofar as such matters are other-wise provided as follows:

(a) BUILDING CODE

For regulations governing the construc- tion, maintenance, alterations, repair, dem-olition or removal of structures and build-ings, see Building Code, Bureau of Buildings, City of Atlanta.

(b) HEATING AND AIR CONDITIONING

CODE

For regulations governing heating and air conditioning installations, see the Heat-ing and Air Conditioning Code, Bureau of Buildings, H.V.A.C. Division, City of At-lanta.

(c) ELEVATOR CODE

For regulations governing elevator instal-lations, see the Elevator Ordinance, Bu-reau of Buildings, Electrical Division, City of Atlanta.

(d) COMMERCIAL MAINTENANCE CODE

For regulations governing maintenance of existing buildings, see Housing Code, Bureau of Buildings, Housing Code Divi-

(e) (f) (g) (h) (i) ) (k) (1) (m)

LDC B:3

sion, and Commercial, Institutional and Industrial Building Maintenance Code, Bu-reau of Buildings, Building Division.

PLUMBING CODE

For regulations governing plumbing in- stallations, see the Plumbing Code, Bureau of Buildings, Plumbing Division.

FIRE PREVENTION CODE

For regulations governing fire preven- tion, see the Fire Prevention Code, City of Atlanta.

ZONING ORDINANCE

For regulations governing zoning, see the Zoning Ordinance, City of Atlanta.

GEORGIA FIRE SAFETY LAW

For regulations governing means of egress and safety to life requirements, see also Georgia Fire Safety Law and the rules of the Safety Fire Commissioner pertaining

thereto.

AIR POLLUTION

For regulations governing the control of air pollution and air contamination, see regulations promulgated by Georgia Envi-ronmental Protection Division and appro-priate Federal regulations.

GAS CODE

For regulations governing gas piping, see Gas Code, Bureau of Buildings, HVAC Di-

vision.

GEORGIA STATE CODE FOR HANDI-

CAP ACCESSIBILITY

Where any requirement of this Code is less restrictive than those above listed, then such code or rules shall take prece-dence over the requirements of this Code.

GEORGIA STATE ENERGY CODE FOR

BUILDINGS

For regulations governing the use of en-ergy, see Georgia State Energy Code.

BOILER CODE

For regulations governing the installa- tion of boiler, see rules and regulations of the State of Georgia Department of Labor, Engineering Division.

(n) COUNCIL OF AMERICAN BUILDING OF-

FICIALS—ONE AND TWO FAMILY

DWELLING CODE

Provided, however, the regulations con- cerning the installation of Mechanical Part IV (Chapters 10—19) and Plumbing Part V

(Chapters 20—25) of the One and Two Family Dwelling Code are hereby deleted.

101.3. PURPOSE.

The purpose of this Code is to provide minimum standards and/or regulations to safeguard life, limb, health, property, and public welfare of the citizens of the City of Atlanta, Georgia.

101.4. ALL NEW WORK TO CONFORM.

(a) No equipment, appliance or system, as here-inafter specified in this Code, shall be installed, constructed, erected, altered or repaired, except in conformity with the provisions of this Code.

(b) No equipment, appliance or system, as here-inafter specified in this Code, shall be altered in any manner that would be in violation of the provisions of this Code or of any authorized rules or approval of the Director of Buildings made and issued thereunder.

(c) The provisions of this Code shall not apply to the installation, alteration or repair of plumb-ing, air conditioning and heating, or electrical systems, where such work is an integral part of the system owned or operated in rendering its duly authorized service as such, by a railroad company, pipeline company, mining company, pub-lic utility in the exercise of its normal functions as a public utility, or where such work is an integral part of any irrigation system on farms, ranches, or other open, unpopulated areas where such work will not be located within 300 feet of any dwelling or any building devoted to animal hus-bandry.

(d) Design conditions and selection of equip-ment shall conform to the Georgia State Energy Code for Buildings.

(e) The installation of all boilers shall be sub-ject to the jurisdiction of the State of Georgia Department of Labor, Engineering Division, which _ shall issue all permits and certifications for such equipment. Provided, however, all such approval certification shall be submitted to the Bureau of Buildings, HVAC Division, in order to obtain final approval on mechanical systems.

101.5. USE AND MAINTENANCE.

(a) It shall be unlawful to maintain, use, re-pair, or alter any equipment, appliance or system that has been or will be installed, constructed or erected after the adoption of this Code, that is in violation or will violate the provisions as herein-after specified.

(b) No equipment, appliance or system, as here-inafter specified in this Code, shall be used unless it is in a safe condition and listed with an ap-proved testing agency. The owner or his desig-nated agent shall be responsible for the mainte-nance of the electrical systems.

101.6. EQUIPMENT, APPLIANCES OR SYS-

TEM AFFECTED.

The provisions of this Code shall apply to any equipment, appliance or system installed, con-structed, erected, altered, repaired, maintained or used in the City of Atlanta, Georgia, except as may be otherwise specifically provided for by statute or ordinance.

101.7. APPLICATION TO EXISTING BUILD-

INGS.

(a) Equipment, appliances or systems installed at the passage of this Code may have their exist-ing use maintained, if approved at the time of passage of this Code, provided such continued use is not dangerous to life.

(b) The Director may make, or cause to be made, the inspections required by this Section.

He may accept reports of inspectors of recognized inspection services provided that after investiga-tion he is satisfied as to their qualifications and reliability. A certificate called for by any provision of these requirements shall not be based on such reports unless the same are in writing and certi-fied by a responsible office of such service.

(c) All abandoned wiring previously utilized for low voltage systems shall be removed from above

LDC B:4

the ceiling plenum spaces, or the plenum space shall be protected with automatic partial sprinkler protection.

(d) All HVAC units exceeding 5,000 cfm shall be provided with listed smoke detectors installed in the supply system downstream of the filters to detect the presence of smoke and automatically stop the fan(s).

(e) For existing buildings having electrical systems of 277/480 volts with 1,000 amps or more which are designed without ground fault protection and use electric bussway, heat detectors shall be installed in each electrical room to disconnect the overcurrent device supplying that circuit, or shall install ground fault protection.

Such modification shall be installed by December 31, 1995.

Exception: Telecommunications equipment buildings, used exclusively for telecommunications equipment and associated generator and power equipment and under the exclusive control of a telecommunications provider shall be exempt from requirements of this section.

101.8. ELECTRIC VEHICLE CHARGING

INFRASTRUCTURE READINESS

REQUIREMENT FOR NEW COMMERCIAL CONSTRUCTION.

(a) Definitions.

(1) Accessible Electric Vehicle Charging Station ("Accessible Station") means an Electric Vehicle Charging Station where

the Electric Vehicle Charging Station is located within accessible reach of a barrierfree access aisle and the Electric Vehicle to enable access and use by persons with disabilities, in accordance with the

Americans with Disabilities Act of 1990 (42 U.S.C. § 12101) and the applicable regulations, as amended ("ADA").

(2) Electric Vehicle ("EV") means an automotive-type vehicle for on-road use, including but not limited to passenger automobiles, buses, trucks, vans, neighborhood Electric Vehicles, and electric motorcycles, powered by an electric motor that draws current from a rechargeable

storage battery, fuel cell, photovoltaic array, or other source of electric current which is charged by being plugged into

an electrical source. For the purpose of this ordinance, off-road, self-propelled Electric Vehicles, such as industrial trucks, hoists, lifts, transports, golf carts, airline ground support equipment, tractors, boats, and similar vehicles are not included in this definition.

(3) EVSE Capable means a parking space that does not yet have an Electric Vehicle Charging Station installed, does have

dedicated electrical panel capacity and reserved breaker or subpanel expansion, and some Electric Vehicle Supply Equipment infrastructure installed including, a dedicated branch circuit to provide

enough power for future charging stations, one port per parking space with one 9600 VA circuit line provided during construction, or if a dual port is used to supply two adjoining parking spaces, two 9600 VA circuit lines. See Table 1 for a description and visual aid.

(4) Electric Vehicle Charging Station (or "Charging Station") means a public or

private parking space that is served by EVSE for charging and parking an Electric Vehicle.

(5) EVSE Ready means an Electric Vehicle parking space that provides dedicated

electrical panel capacity, conduit, and wiring installed that terminates at an outlet at the Electric Vehicle parking space but does not yet have an Electric Vehicle Charging Station installed. See Table 1 for a description and visual aid.

(6) Electric Vehicle Supply Equipment ("EVSE") means the conductors, including the ungrounded, grounded, and equipment grounding conductors, and the Electric Vehicle connectors, attachment

plugs, and all other fittings, devices, power outlets, or apparatus installed specifically for the purpose of transferring energy between the premises wiring and the Electric Vehicle.

(7) EVSE Installed means an Electric Vehicle parking space with an Electric Vehicle

Charging Station fully installed and operational, including all relevant Electric Vehicle Supply Equipment. The model

and manufacturer of the charger may be chosen by the property owner. See Table 1 for a description and visual aid.

(8) NEC means the current version of the National Electrical Code, as published by the National Fire Protection Association.

Table 1. EVSE Capable, Ready and Installed.

EVSE Capable EVSE Ready EVSE Installed Enough electrical capacity is installed at the panel to support future EV charging spots.

Additionally, there is a dedicated branch circuit to make sure enough power is available for future charging stations without overloading the system and raceway to future charging spots. Requires panel space and conduit.

A parking space is EVSE Ready when additional wiring and a junction box or an 8320 VA to 9600 VA outlet (like for a clothes dryer have been installed). This requires dedicated panel capacity, conduit, and wiring that safely terminates at the parking space.

Enables immediate EV charging to meet current and future demand. Requires installation

of at least a Level 2 EV Charger.

(9) Level-1 Charger means an Electric Vehicle Charging Station with a voltage range

from 0 VA to 1920 VA. See Figure 1.

(10) Level-2 Charger means an Electric Vehicle Charging Station with a voltage range

from greater than 4800 VA to 9600 VA.

See Figure 1.

(11) Level-3 Charger means a Direct Current (DC) Electric Vehicle Charging Station

with greater than 9600 VA. See Figure 1.

Figure 1. Level 1, Level 2, and Level 3 Chargers Described

(12) Non-Electric Vehicle means any motor vehicle that is licensed and registered for operation on public and private highways, roads, and streets that does not meet the definition of Electric Vehicle.

(13) Plug-In Hybrid Electric Vehicle ("PHEV") means an automotive-type vehicle for

on-road use, including but not limited to passenger automobiles, buses, trucks,

vans, neighborhood Electric Vehicles, electric motorcycles, powered by an electric motor that draws current from a rechargeable storage battery, fuel cell, photovoltaic array, or other source of electric current which is charged by being plugged into an electrical source, and having a

second source of motive power such as an internal combustion engine.

(b) Minimum Requirements.

(1) All new occupancy classifications, including all new construction for mixed use zoning classifications and all new S-2

parking garages, including S-2 parking garages associated with other new occupancies classifications, shall meet the requirements for EVSE Capable and EVSE Installed established in this Section, to accommodate the installation of EVSE and Charging Stations.

(2) EVSE shall be installed in accordance with the requirements of the current

version of the International Building Code and the following ratios:

(a) The off-street parking provided for all new occupancy classifications parking garages and new S- 2 parking garages associated with other new occupancies shall have EVSE

installed at the parking spaces dedicated for the use of the building at the following ratio:

(i) EVSE Capable parking spaces shall comprise 20% (or 1:5) of the required parking spaces.

(ii) EVSE Installed parking spaces shall comprise 20% (or 1:5) of the required parking spaces in addition to EVSE Capable Spaces.

(iii) EVSE Installed parking spaces shall be prioritized over EVSE Capable parking spaces in the case where fire safety requirements limit the number of EV parking spaces.

(iv) EVSE Capable Spaces in new off-street parking areas constructed, owned, or operAPPENDIX B—ELECTRICAL CODE AMENDMENTS 101.8 ated by the City of Atlanta

shall comprise 50% (or 1:2) of required parking spaces.

(v) EVSE Installed Spaces in new off-street parking areas constructed, owned, or operated by the City of Atlanta shall comprise 25% (or 1:4) of

required parking spaces.

(3) All new off-street parking, or the expansion of the existing footprint of off-street parking for all parking lot occupancy

classifications, including additional floors on existing parking decks, shall comply

with the EVSE Installed and Capable requirements established in subsection (2)(b) of this section; provided, however, that parking spaces below grade or parking spaces three or more levels above the level of exit discharge shall not be required to comply with the ratio.

(c) Electric Vehicle Supply Equipment Minimum Requirements.

(1) EVSE Capable parking spaces shall include a raceway, which is continuous from the branch circuit or feeder panel location to the EVSE parking space. The raceway shall be sized and installed in accordance with the NEC, and shall be at least one inch (1") in size or of a size suitable for the required conductor size.

The raceway shall include a pull rope or line installed for future conductor installation, and the raceway sealed and labeled for future use.

(a) The electrical load capacity for the service panel shall be provided on

the electrical permit documents to ensure the service panel has adequate electrical load capacity.

(b) The electrical permit documents shall show a 14400 VA, 2-pole single phase, (12480 VA if 3-phase feeder supplied) branch circuit to provide for the future electrical load capacity needed for the required EVSE in accordance with the number of parking spaces established in section 101.8(1)(b).

(c) All VA ratings shall apply the relevant demand factors in accordance with the NEC.

(2) EVSE Installed parking spaces shall include, at the minimum a Level-2 Charger with a minimum load capacity of 9600 VA.

(3) EV Charging Stations equipped with a Level-1, Level-2, or Level-3 Charger are permitted as an accessory use in all

zoning districts.

(4) EVSE, including Charging Stations shall be designed, located, and installed to

prevent damage and minimize exposure to damage, including, but not limited to vehicle impact protection such as posts

or bollards that meet the following standards:

(a) Constructed of steel not less than four inches (4") in diameter and filled with concrete.

(b) Spaced no more than four feet (4') on center between posts.

(c) Set at least three feet (3') deep in a concrete footing not less than fifteen

inches (15") in diameter.

(d) The top of the post is not less than three feet (3') above grade.

(e) Located not less than three feet (3') from the EVSE.

(f) Bollard installations in elevated parking deck slabs shall be designed by the applicant's design professional, provided however, the Director may require modifications of the design that ensure the safety the

EVSE or the Charging Station.

(g) Other barriers that resist or deflect vehicular impact may be approved

when they are designed to provide protection equivalent to the barriers describe in subsections (a) through (e).

(5) Parking garages of all occupancy classifications and S-2 parking garages associated with other new occupancies that have an electrical equipment room must

have dedicated space for the future installation of EVSE in the electrical equipment room.

(a) This space shall be identified on all construction documents submitted

for permitting review.

(b) The dedicated space shall comply with the International Building Code requirements regulating working space clearances around equipment, and the requirements governing the entrance to and egress from electrical equipment working space.

(c) During construction of the electrical equipment room, all raceways and conduit installed for the EVSE

Infrastructure shall terminate at the space dedicated for the future Electric Vehicle Charging Station.

(d) Prior to the final electrical inspection approval, the space dedicated within the electrical equipment room

for the future EVSE Capable and EVSE Installed shall have the distribution board installed for

"FUTURE ELECTRICAL VEHICLE

CHARGING EQUIPMENT AND

PANELS."

(d) Fire Protection Standards.

(1) EV parking spaces and Charging Stations shall be accessible from Fire Department standpipes to aid in suppressing fires.

(2) All closed and enclosed parking structures renovated, or constructed after the effective date of this section shall provide one

(1) nine meter by six meter (9x6) fire blanket in a location approved by the Fire Chief or their designee. All fire blankets shall be installed and maintained at the building owner's expense.

(3) All closed and enclosed parking structures renovated or constructed after the effective date of this section, shall provide a fused, emergency disconnect for each

charging unit to shut down power to the EVSE in the immediate vicinity of the unit.

(a) The location of the disconnect shall be approved by Fire Chief or their

designee.

(b) Disconnect devices and related appurtenances shall be installed and maintained at the building owner's expense.

(c) When the EVSE disconnect is installed, the disconnect shall be copper from the service panel to the disconnect. The conductors from the disconnect to the EVSE shall be copper.

(4) A minimum of two (2) 2A:10B:C Fire Extinguishers shall have the minimum capacity of 10lbs and shall be installed within 75 feet of each EVSE capable and

installed parking space and in each electrical room servicing EVSE equipment. All fire extinguishers shall be installed and maintained at the building owner's

expense.

(5) All closed and enclosed parking structures renovated or constructed after the effective date of this section, shall include an additional 30 inches of space between

each EV parking space, or the width of the emergency disconnect, whichever is greater. The spaces in between these parking spaces shall be striped in red to prohibit parking in that space.

(e) Compliance with the Americans with Disabilities Act.

(1) All EVSE and Charging Stations shall comply with ADA regulations.

(2) A minimum of one (1) EVSE Installed Accessible Station shall be located immediately adjacent to an ADAdesignated space to provide access to the charging station.

(3) An EV Charging station designated as dual-port may serve both an Accessible

Station and a non-accessible Charging Station with ADA compliant hardware.

(4) The use of a parking space for accessible parking shall be prioritized over the need to use the space as an EV Charging

Station.

(5) EVSE and Charging Stations shall not create a trip hazard or compromise the

accessible path of travel when the cord is connected to a vehicle, in accordance

with the U.S. Access Board's guidance for Floors and Ground Surfaces (https://

www.access-board.gov/ada/guides/chapter3-floor-and-ground-surfaces/).

(a) Charging cords must be covered by a highly visible, stable, secure, lowangle cable ramp while charging.

(b) A cover should remain highly visible at night through the use of reflective tape or colors that contrast

with adjacent walking surfaces.

(c) If the total height of both the cord and the ramp does not exceed one

half inch (1/2"), the following requirements apply:

(i) The ramp shall cover the charging cord completely across the sidewalk and be at least 4 feet

in length.

(ii) The ramp shall be no steeper than a 50% grade or 1:2 gradient.

Figure 2. Cross-section of Ramp Requirements for Cords up to 1/2 inch.

(d) If the total height of both the cord and the ramp exceeds one half inch

(1/2"), the following requirements apply:

(i) The ramp shall be no steeper than an 8.3% grade or 1:12 gradient.

(ii) A three foot by five foot (3' x 5') clear landing on the sidewalk

shall be on either side of the ramp.

(iii) The ramp shall cover the entire width of the sidewalk and can be no less than 4 feet wide.

(iv) A five foot by four foot (5' x 4') or greater landing platform shall be at the top of the ramp.

(v) The landing must be flat, with no more than a 2% slope (1:50 gradient) in any direction.

(vi) The ramp cannot have a cross slope, perpendicular to the direction of travel, that exceeds a 2% grade (1:50 gradient).

Figure 3. Cross-section of Ramp Requirements for Cords greater than 1 inch.

Figure 4. Overhead Diagram of a Ramp for Heights over 1/2 inch.

(Ord. No. 2017-76(17-O-1654), § 2, 11-29-17;

Ord. No. 2018-09(18-O-1143), § 1, 4-25-18; Ord.

No. 2021-43(21-O-0618), § 1, 9-15-21; Ord. No.

2025-03(25-O-1011), § 1, 1-23-25)

101.9. ELECTRIC VEHICLE CHARGING

INFRASTRUCTURE READINESS

REQUIREMENT FOR NEW

RESIDENTIAL CONSTRUCTION.

(a) All new Group R-3, single family, twofamily, and three-unit dwellings occupancies shall provide EVSE to accommodate the future installation of Charging Stations.

(b) The following project types shall also comply with the EV Ready Residential Requirements established in this section:

(1) When a new Accessory Dwelling Unit (ADU) is constructed with a garage.

(2) When a service change is triggered for a detached garage.

(3) When an electrical service is changed or upgraded.

(c) EVSE shall be installed in accordance with the requirements of the current edition of the NEC and this section.

(d) All dwellings regulated by this section shall provide sufficient electrical capacity for a 9600 VA branch circuit for the future installation of EVSE. Each new residential unit shall provide an area within attached garages, carports, driveways, or detached garages for at least one EVSE Ready parking space. The EVSE Ready parking space shall include at least:

(1) A 240V electrical outlet, with a dedicated branch circuit capable of supporting, at a minimum, a Level-2 Charger;

(2) The electrical panel serving the residential unit shall have sufficient electrical load capacity and panel space for the installation of a dedicated branch circuit for the

EVSE.

(3) The outlet shall be a National Electrical Manufacturers Association (NEMA) 14-50

or equivalent, ensuring compatibility with most Level-2 Chargers.

(4) The EVSE Ready parking space and the corresponding outlet or branch circuit

shall be clearly labeled as "EVSE Ready" in the electrical panel and at the outlet location.

(5) A permanent label shall be affixed to the electrical panel indicating the location of the EVSE-Ready outlet and its circuit

breaker.

(6) If a residential unit does not have an attached or detached garage, an

underground electrical conduit shall be provided between the dwelling and the designated off-street parking space for the dwelling.

(7) The overcurrent protective device and the panelboard must be sized to accommodate the sum of the value noted in subsection (b) of this section, plus the demand factor for continuous duty

established in the NEC.

(e) EVSE shall be designed, arranged, and installed to prevent damage and to prevent exposure to damage.

(d) The EVSE Ready parking space shall include a raceway, which is continuous from the branch circuit/feeder panel location to the future EV parking space designated for the dwelling.

The raceway shall be sized and installed in accordance with the International Building Code and the following requirements:

(1) To accommodate the appropriate conductor size within the wall cavity to protect the conductors from harm. The EVSE

infrastructure raceway shall include conduit and wiring for the dedicated branch circuit installation.

(2) The electrical load capacity for the service panel shall be provided on the permitting documents to ensure the service panel

has adequate electrical load capacity.

Utility companies shall be consulted to verify capacity concerns of overloading local transformers is possible.

(3) When a disconnect is required or EVSE Installed, the disconnect may be an

aluminum conductor from the service panel to the disconnect. The conductor from the disconnect to the charging unit shall be copper conductors.

(Ord. No. 2017-76(17-O-1654), § 2, 11-29-17;

Ord. No. 2018-09(18-O-1143), § 2, 4-25-18; Ord.

No. 2021-43(21-O-0618), § 2, 9-15-21; Ord. No.

2025-03(25-O-1011), § 2, 1-23-25)

101.10. SECURITY CAMERA INTEGRATION READINESS REQUIREMENT FOR NEW COMMERCIAL

CONSTRUCTION.

(a) Definitions:

1. Integrable Security Camera System: An Integrable Security Camera System shall

mean a video management system capable of producing a retrievable and identifiable image and that is able to connect to the City's Video Integration Center.

2. Integrable Security Camera Infrastructure:

i. The wiring, conductors, connectors, attachment plugs, and all other fittings, devices, power outlets, or apparatus installed specifically for

the purpose of transferring energy between the premises wiring and the Integrable Security Camera System;

ii. Any cables needed to install a Integrable Security Camera System including coaxial cable, fiber- optic cable, ethernet cable, or other appropriate cable, if necessary; or iii. Any fixtures or poles needed to mount the Integrable Security Camera System's components.

3. Ingress/Egress Points: Shall mean main access points for the public to enter and exit a building or structure including

access points for vehicles entering and exciting parking garages.

(b) All new construction of new occupancies of Assembly Group A buildings or structures (excluding places of religious worship), Business Group B buildings or structures, Institutional Group I buildings or structures, Mercantile Group M buildings or structures, Residential Group R buildings or structures, and Storage Group S buildings or structures (including S-2 parking garages associated with other new occupancies), as regulated by the International Building Code, and that are 100,000 square feet or more, are required to install Integrable Security Camera Infrastructure. The Integrable Security Camera Infrastructure shall be installed per this code provision including that:

1. The Integrable Security Camera Infrastructure shall be installed on the exterior of the buildings or structures at Ingress/Egress Points; and

2. Prior to a final inspection, or at an appropriate point in the permitting

process as determined by the Office of Buildings, the property owner, or authorized agent, shall execute an affidavit affirming compliance with the requirements of this code provision. The Office of Buildings shall have the

administrative authority to determine the scope and terms of the affidavit and shall include wireless or wi-fi capable

connections as compliant with this code provision.

(c) Nothing in this code provision shall require a building owner to connect a Integrable Security Camera System to the City's Video Integration Center however the Integrable Security Camera Infrastructure shall be installed to facilitate this connection should the building owner so choose.

(Ord. No. 2023-34(23-O-1402), § 1, 10-2-23)

SECTION 102. DIRECTOR OF THE BUREAU

OF BUILDINGS TO HAVE SUPERVISION,

MAKE TESTS AND INSPECTIONS

102.1. CREATION OF DUTIES.

The Director of the Bureau of Buildings shall receive applications required by this Code, issue permits and furnish the prescribed certificates.

The Director shall examine the equipment, appliance or system for which permits have been issued and shall make necessary inspections to see that the provisions of the law and this Code are met. The Director shall enforce all laws relating to the construction, alteration, repair, installation, erection, removal, demolition, use, location, and maintenance of equipment, appliances or systems, except as may be otherwise provided for in other ordinances or regulatory measures. The Director, when requested by proper authority, or when the interests of the City of Atlanta so require, shall make investigations in connection with matters referred to in this Code and render written reports on the same. To enforce compliance with law, to remove illegal or unsafe conditions or to secure the necessary safeguards, the Director shall issue such notices or orders as may be necessary.

102.2. INSPECTIONS REQUIRED.

(a) Inspections required under the provisions of this Code shall be made by the Director of the Bureau of Buildings or his duly authorized representatives. Upon presentation of proper credentials, the Director or his duly authorized representatives may enter, at reasonable times, any building, structure or premises in the City of Atlanta to perform any duty imposed by this Code. The Director of the Bureau of Buildings or authorized representatives are hereby authorized and directed to enforce all provisions of this Code, and are hereby invested with all police power necessary for the purpose of making arrests, issuing copies of charges and prosecution of any person or persons as may be charged with any violations of this or other ordinances of the City of Atlanta.

(b) All installations of any equipment, appliance or system for which a permit has been issued as prescribed in this Code shall be subject to inspection by the Director of the Bureau of Buildings or duly authorized representatives.

(c) The director or duly authorized representatives upon notification from the permit holder shall make such inspections as may be necessary, and shall either approve that portion of the construction as completed or shall notify the permit holder or agent wherein the same fails to comply with the law.

(d) It shall be unlawful for any person, firm or corporation, their agents or employees, to cover or conceal any electrical wiring until it has been inspected and approved.

(e) Electrical power shall not be turned on until final approval is granted by the Director of the Bureau of Buildings. This Section will not prevent the issuance of temporary approvals.

Where electrical power has been turned on to any installation which violates this Code, the Director of the Bureau of Buildings may cause said electrical power to be immediately

terminated.

(f) Failure to obtain a final inspection within 30 days of job completion or prior to tenant occupancy shall be a violation of this Code, unless otherwise approved.

102.3. RULES.

(a) The Director of the Bureau of Buildings shall promulgate rules as prescribed in this Code and consistent therewith. It being the intent of this requirement that the standards of federal and state bureaus, national technical organizations or fire underwriters, as the same may be amended from time to time, shall serve as a guide in establishing the minimum rules of practice under this Code.

(b) For the purpose of insuring public safety, materials, equipment, appliances, or systems intended for the use in the City of Atlanta for which conditions of use are not provided for in this code, the Director or duly authorized representatives shall make or cause to be made investigations, or may accept duly authenticated reports from recognized sources, from which rules will be set forth by the Director.

(c) No rule of the Director of the Bureau of Buildings shall become effective until four weeks after notice of intention to enforce it shall have been given through the publication in a newspaper in general circulation in the City of Atlanta and until a public hearing on the same shall have been held, provided that said public hearing shall not be necessary unless a request shall have been made for such hearing during the said period of publication, by notice to the Director of the Bureau of Buildings. Such rule must be drawn in its proposed form and open to public inspection at the time the notice to enforce is published.

102.4. RECORDS.

(a) The Director of the Bureau of Buildings shall keep comprehensive records of applications or permits issued, of inspections made, of reports rendered, and of notices or orders issued.

(b) All such records shall be open to public inspection for good and sufficient reasons at office hours observed by the City of Atlanta, but shall not be removed from the office of the Director of the Bureau of Buildings.

SECTION 103. APPLICATION FOR PERMIT

103.1. WHEN REQUIRED.

It shall be unlawful to construct, erect, install, alter or repair or to commence the construction, erection, installation, alteration or repair of any equipment, appliance or system provided for in this Code without first filing with the Director of the Bureau of Buildings an application in writing and obtaining a formal permit in conformity with Section 104.

EXCEPTION: 1. Emergency installations resulting from unexpected conditions which developed suddenly and required immediate action shall be exempt from this section for a maximum period of forty-eight (48) hours subject to approval of the Director of the Bureau of Buildings if telephoned to the Electrical Division.

(a) An application for a permit shall be submitted in such form as the Director of the Bureau of Buildings may prescribe.

(b) Such application shall be made by the owner or the owner's authorized licensed representative. It shall be the responsibility of the owner to see that a permit is obtained by a licensed individual (See Section 103.4), before any installation or work is started.

(c) Such application shall contain the full names and addresses of the applicant and of the owner.

(d) Such application shall describe briefly the proposed work and shall give such additional information as may be required by the Director of the Bureau of Buildings for an intelligent understanding of the work.

(a) When required by the Director of the Bureau of Buildings, two or more copies of specifications and drawings to scale with sufficient clarity and detail to indicate the nature and character of

the work shall accompany every application. Such drawings and specifications shall contain name and address of designer and information in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with this Code. Such information shall be specific, and this Code shall not be cited as a whole or in part, nor shall the term "legal" or its equivalent be used, as a substitute for specific information. The Director of the Bureau of Buildings may require details, computations, load studies and other data necessary to describe the construction and basis of calculations and they shall bear the signature of the person responsible for the design.

(b) It shall be unlawful for any private or commercial entity to engage in the construction of any work or structures involving professional engineering which by the nature of their function or existence could adversely affect or jeopardize the health, safety, or welfare of the public unless the plans and specifications have been prepared under the direct supervision or review of and bear the seal of, and the construction is executed under the direct supervision of or review by, a registered professional engineer or architect.

(c) Nothing in this section shall be held to apply to any construction, including alterations, of which the completed cost is less than $100,000.00 or which is used exclusively for private or noncommercial purposes, or to private residences, or to noncommercial farm buildings, or to residence buildings not exceeding two stories in height, excluding basements.

(a) Only partnerships or corporations engaged in the business of electrical contracting, installation or repairing shall be entitled to a permit under this Code for such business activities where there is regularly connected with such partnership or corporation a person or persons, actually engaged in the business of electrical contracting, installation or repairing, who holds a valid Electrical or Low-Voltage Contractor's License issued by the State of Georgia Construction Industry Licensing Board.

(b) Only a person engaged in the business of electrical contracting, installation or repairing shall be entitled to receive a permit under this Code for such business activities where such person holds a valid Electrical or Low-Voltage Contractor's License issued by the State of Georgia Construction Industry Licensing Board.

(c) All work requiring a permit under this Code shall be performed by an individual, firm, or corporation holding a valid business license in the City of Atlanta.

(d) It shall be unlawful for any person, firm or corporation who is not an Electrical contractor duly licensed by the State of Georgia to display a sign stating or implying that he or they are carrying on the business of this Code or fails to comply therewith or with any of the requirements thereof, shall be deemed guilty of an offense and upon conviction thereof, in the City of Atlanta Municipal Court, shall be assessed a fine of not less than $50.00 nor more than $1,000.00 and/or sentenced to no more than 60 days in the City Stockade. Where any offense continues from day to day, each day's continuance thereof shall be deemed a separate offense.

SECTION 104. PERMITS

104.1. ACTION ON APPLICATION.

(a) In accordance with Section 103.4 (Mandatory License Requirements), applications for permits shall be examined, within a reasonable time after filing. If, after examination, no objection is found to the same and it appears that the proposed work will be in compliance with the laws and ordinances applicable thereto, the application shall be approved and a permit issued for the proposed work. If examination reveals otherwise, such applications shall be rejected, and the applicant notified by a written report or otherwise informed.

(b) The issuance or granting of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of any violation of any of the provisions of this Code.

(c) The issuance of a permit based on applications, plans and/or specifications shall not prevent the Director of the Bureau of Buildings from thereafter requiring the correction of errors in said applications, plans and/or specifications or from preventing the work from being carried on thereunder when in violation of this Code or of other ordinances of the City of Atlanta.

(d) No partnership or corporation engaged in the business of electrical contracting, installation or repairing shall be entitled to a permit under this Code for such business activities unless there is regularly connected with such partnership or corporation a person or persons actually engaged in the business of electrical contracting, installation or repairing who holds a valid State of Georgia Electrical or Low-Voltage Contracting License.

CODE AND FEE SCHEDULES.

The following equipment or systems are required to be permitted in accordance with this Code, and Table I, Permit Inspection Fee Schedule.

(a) Any person obtaining a permit shall pay to the City of Atlanta fees in accordance with Table I, City of Atlanta Electrical Division/Schedule of Permit Fees.

[Table I not available for printing. See Director, Bureau of Buildings]

(b) Any person obtaining a permit shall pay to the City of Atlanta fees as follows:

1. Temporary Pole, each . $50.00

2. Disconnect or reconnect

4. Change of Contractor . 50.00

5. Service/Disconnects:

201—800 amps, each . . 20.00 801—1,200 amps, each 60.00 1,201—2,000 amps, 2,001—4,000 amps, Over 4,000 amps, each 300.00

6. Feeders:

31—100 amps, each . . . 5.00 101—200 amps, each . . 10.00 201—800 amps, each . . 20.00 801—1,200 amps, each 60.00 1,201—2,000 amps, 2,001—4,000 amps, Over 4,000 amps, each 300.00

7. Branch Circuits:

31—100 amps, each . . . 5.00 101—200 amps, each . . 10.00 201—800 amps, each . . 20.00 801—1,200 amps, each 60.00 1,201—2,000 amps, 2,001—4,000 amps, Over 4,000 amps, each 300.00

8. Low Voltage, per 1,000

(c) A reinspection fee of $50.00 shall be imposed for each reinspection after the initial inspection when a written notice has been issued requiring a correction of inferior work.

(d) In the event that any work under this code for which a permit is required is

started without a permit first being obtained, the permit fee will be doubled for that permit. However, in no event shall

the penalty portion of said fee exceed $1,000.00. In addition, if any work is found to have been performed which is not listed on an existing permit, the cost of adding that work to the permit shall be double the usual fee. However, in no instance shall the penalty portion of that fee exceed $1,000.00.

(Ord. No. 1998-9, § 2, 2-16-98; Ord. No. 2002-11, § 2, 3-5-02; Ord. No. 2002-35, § 2, 5-28-02)

(a) All work performed under a permit issued shall conform to the approved application and plans and all codes or ordinances governing the work or equipment for which permits were issued.

All work shall be performed by an individual, contractor, firm or corporation licensed to perform such work. Permits shall not be transferable except as provided in Section 104.7.

(b) Individuals, contractors, firms or corporations licensed to perform work governed by this Code shall register their Georgia State Electrical and/or Low Voltage Contractor's license number with the Director of the Bureau of Building before obtaining permits.

(c) One set of approved plans and specifications shall be retained by the director and one set of approved plans and specifications shall be returned to the applicant, which shall be kept on such building or work at all times during which the work authorized thereby is in progress.

A permit under which no work is commenced within six months after issuance, or where the work commenced is suspended or abandoned for six months, shall expire by limitation, and fees paid shall be forfeited. The application, plans, and specifications shall be reviewed and a new permit required before work is started or resumed.

104.6. REVOCATION OF PERMIT.

(a) The Director of the Bureau of Buildings may revoke a permit or approval, issued under the provisions of this Code, in case there have been any false statements or misrepresentation as to a material fact in the application or plans on which the permit or approval was based.

(b) Failure at any time to comply with the requirements of the City of Atlanta Electrical Code.

(c) Upon determination by the Director of the Bureau of Buildings that an electrical installation is unsafe and hazardous to life and safety.

(d) Failure to follow the plans and specifications on file with the Bureau of Buildings relative to a particular permit.

104.7. NEW CONTRACTOR OR ALTERNATE

CONTRACTOR ON JOB.

(a) In the event that a contractor leaves or abandons a job to which a permit has been issued before the final inspection, that contractor remains responsible for any work on that job that is not in compliance with this Code.

(b) Any new contractor on any job which has not received final approval must apply for a new permit for all work on that job that has not been finalized and assumes all responsibility. A minimum fee permit of $30.00 shall be issued for the change of contractor.

104.8. REFUND OF PERMIT FEES.

Within six (6) months from the date of issuance of a permit, a refund request may be granted, as follows:

(a) When a permit has been issued in error as determined by the Director, the total fee may be refunded provided no work has

commenced on that permit.

(b) When a permit has been issued and the job has been cancelled, 50% of the permit fee may be refunded provided no work has commenced on that permit.

(c) Any overpayment or refund request of $50.00 or less shall not be refunded.

(d) No refund shall be issued for less than $50.00

All applications for refunds shall be in writing and shall state the reasons for the request.

(Ord. No. 1998-9, § 2, 2-16-98; Ord. No. 2002-11, § 2, 3-5-02)

104.9. TEMPORARY SERVICES.

Temporary electrical service may be installed at a location when proper forms have been submitted to the Chief Electrical Inspector for the following purposes:

(a) To supply power for the purpose of hoisting material used in buildings under construction or remodeling, and for the purpose of lighting said buildings or structures during the construction of said buildings.

(b) The lighting of tents or buildings used for temporary gatherings or performances

where said tents or buildings will only be used for a short duration. In addition,

temporary service may be installed where lighting is to be used for decorative purposes for a short duration.

(c) To allow electrical service to parts of wiring installations which have been made safe to the satisfaction of the Electrical Division so that the testing of certain

electrical equipment may occur, and in order to allow tenants, leasees, or owners the use of certain completed parts of buildings before all the work is completed.

(d) The application for temporary service shall state the period of time the service is

required and the necessity for same. No temporary approval shall be issued for a period of more than 90 days, except when specifically authorized, in writing, by the Director of the Bureau of Buildings. Requests for extensions shall be made in writing to the Electrical Division. It shall be made in writing by the person, firm or corporation holding the permit. Upon expiration of temporary approval, such service shall be immediately discontinued.

SECTION 105. UNSAFE SYSTEMS,

APPLIANCES OR EQUIPMENT

105.1. UNSAFE SYSTEMS, APPLIANCES OR

EQUIPMENT.

(a) Systems, appliances or equipment covered by this Code that may be or shall be found upon inspection to have become dangerous or unsafe, shall unless made safe and so certified by the Director of the Bureau of Buildings, shall be removed or the use of such equipment or systems discontinued.

(b) The term dangerous or unsafe systems, appliances or equipment shall include systems, appliances or equipment structurally unsafe, unstable or unsanitary; constituting a fire hazard, unsuitable or improper for the use to which they are put; constituting a hazard to health or safety because of inadequate maintenance, dilapidation or obsolescence; or otherwise dangerous to life or property.

105.2. NOTICE OF UNSAFE SYSTEMS, APPLIANCES OR EQUIPMENT.

(a) Upon receipt of information that systems, appliances or pieces of equipment covered by this Code are unsafe, the Director of the Bureau of Buildings shall make or cause to be made an inspection; and if it is found that an unsafe condition exists, shall serve or cause to be served on the owner, or any one of the owners, executors, administrators, agents, lessees or other persons who may have a vested or contingent interest in the same, a written notice containing a description of the particulars in which the systems, appliances or equipment are unsafe, and an order requiring the same to be made safe, as may be deemed necessary by him.

(b) If the person to whom such notice and order is addressed cannot be found, after diligent search, then such notice and order shall be sent by registered mail to the last known address of such person; and a copy of such notice shall be posted in a conspicuous place on the premises to which it relates. Such mailing and posting shall be deemed adequate notice.

105.3. DISREGARD OF NOTICE.

If a person served with a notice or order to remove existing unsafe conditions from systems, appliances or equipment or discontinue the use of same, should fail within a reasonable time as set by the Director of the Bureau of Buildings to comply with the requirements thereof, the Director of the Bureau of Buildings shall institute an appropriate action in the courts to compel a compliance and/or may cause the electrical power to be disconnected to the location to ensure safety.

SECTION 106. VIOLATIONS

106.1. NOTICE.

Whenever the Director of the Bureau of Buildings is satisfied that systems, appliances or equipment, or any work in connection therewith that is covered by this Code, is being erected, installed, altered or repaired in violation of the provisions or requirements of this code, or in violation of plans or specifications submitted and approved thereunder, or of a permit issued thereunder, a written notice or order shall be served by the Director upon the person responsible therefor directing discontinuance of such illegal action and the remedying of the condition that is in violation of the provisions or requirements of this Code.

(a) Whenever, in the opinion of the Director of the Bureau of Buildings, defective or illegal work in violation of a provision or requirement of this Code is in progress, he shall order, in writing or otherwise, such work to be stopped, and may require suspension of all work until the condition in violation has been corrected.

(b) The Director of the Bureau of Buildings shall have authority, after due notice, to cut off electrical power to any electric wiring equipment or appliance which, in his opinion, is unsafe to life or property and to require discontinuance of the same until the electric wiring, equipment or appliance is made safe in conformance with this Code.

(a) Any person who shall violate a provision of this Code or fails to comply therewith or with any of the requirements thereof shall be deemed guilty of an offense and upon conviction thereof shall be punished as provided in Section 18-1008 (General Penalty) of the Code of Ordinances of the City of Atlanta, which provides:

"Whenever in this code or in any ordinance of the city any act is prohibited or is made or declared to be lawful or an offense, or whenever in this code or ordinance the doing of any act is required or the failure to do any act is declared to be unlawful, where no specific penalty is provided therefor, the violation of a provision of this code or that ordinance shall be punished by a fine not to exceed $1,000.00 and costs or imprisonment in the city jail for not more than 60 days, or work on the public streets or on public works of the city for not more than 60 days, or by any one (1) or more of these punishments, subject to all limitations contained in the charter of the city. Each day any violation of this code or of any ordinance shall continue shall constitute a separate offense.

In addition to the penalties hereinabove provided, any condition caused or permitted to exist in violation of any of the provisions of this code or any ordinance shall be deemed a public nuisance and may be abated by the city as provided by law, and each day that the condition continues shall be regarded as a new and separate offense."

(b) The owner of a building, structure or premises, where anything in violation of this Code shall be placed or shall exist, and an architect, engineer, builder, contractor, agent, person or corporation employed in connection therewith who may have assisted in the commission of such violation shall each be guilty of a separate offense and upon conviction thereof shall be fined as herein provided.

(c) Any work performed after the issuance of a Stop Work Order shall be demolished promptly and completely at the expense of the responsible party. Demolition shall be carried out in accordance with applicable regulations and safety standards.

(d) No permits shall be issued for further construction, renovation, or alteration of the structure in question until it has been restored to its state as of the date the Stop Work Order was issued.

(Ord. No. 2024-49(24-O-1093), § 2, 8-19-24) The imposition of the penalties herein

prescribed shall not preclude the City of Atlanta from instituting an appropriate civil action or proceeding to prevent an unlawful erection, construction, reconstruction, alteration, repair, conversion, maintenance or use, or to restrain, correct or abate a violation, or to prevent the use of any equipment, appliance or system covered by this Code.

SECTION 107. ADVISORY BOARD

§ 1107.1 107.1. APPOINTMENT.

There is hereby created a Board to be known as the Electrical Advisory Board, consisting of five (5) members to be appointed by the Mayor and approved by the Council. Each member shall be either an engineer or contractor with not less than six (6) years experience in the field of heating and air conditioning. The Board will elect one of its members as Chairman. Five members of said Board shall constitute a quorum thereof for the transaction of any and all business properly coming before them. All terms shall be for a period of two (2) years, except that any term shall be automatically extended until such time as the Mayor appoints a successor.

The Bureau of Buildings shall provide secretarial services to the Advisory Board and shall make a detailed record of all its proceedings, which shall set forth the reasons for the decisions and the vote of each member participating therein, the absence of a member, and the failure of a member to vote. These records shall be submitted to the Board for their approval and then kept on file as a public record in the Bureau of Buildings.

The Board shall establish rules and regulations for its own procedure not inconsistent with the provisions of this Code. The Board shall meet at regular intervals, to be determined by the Chairman, or in any event, the Board shall meet within ten (10) days after notice of appeal has been received.

Whenever any person shall be dissatisfied with any ruling, decision or order of the Director of the Bureau of Buildings, such person may make a written request to the Chairman of the Advisory Board for a hearing thereon. The Chairman of the Board shall thereupon call the Board to meet to hear and investigate such complaints.

After a full and complete hearing on all questions in controversy, the Advisory Board shall render its opinion, concurring in, or recommending such changes in the order, ruling or decision of the Director of the Bureau of Buildings as it may deem fit or proper under the circumstances.

Each action of the Board shall be by resolution, copies of which shall be certified to the Director of the Bureau of Buildings and the complaining party or parties. When the Director of the Bureau of Buildings has a question relating to any matter affecting this Code, the Director may call for the Board to meet to advise the Bureau on the problem.

Any appellant, or complaining party requesting a hearing before the Advisory Board shall pay the sum of Fifty ($50.00) Dollars to the City of Atlanta.

Each member of the Advisory Board shall be paid Twenty-Five ($25.00) Dollars by the City of Atlanta for each meeting attended by him.

108. LIABILITY.

This Code shall not be construed as imposing upon the City of Atlanta any liability or responsibility for damages to any person or property caused by any defect in the system, equipment, nor shall the City of Atlanta or any official or employee thereof, be held as assuming any such liability or responsibility by reason of the inspection authorized hereunder or the certificate of approval issued by the Inspector.

SECTION 2: That the National Electrical Code, 1990 (NFPA 70) be adopted except as amended herein.

SECTION 3: Repealed (Ord. No. 1993-56, § 1, 12-27-93)

SECTION 4: That Chapter 1, entitled General, and that Article 100, entitled Definitions, be amended by adding the following definitions:

Director: The Director of the Bureau of Buildings is the administrative authority to administer and enforce the provisions of this Code as adopted or amended.

Person: This shall include an individual, partnership, joint venture, association, corporation and any other legal entity recognized by the laws of the State of Georgia.

SECTION 5: That Chapter 5, entitled Special Occupancies, Article 517-17(a) be deleted in its entirety and inserting the following Section 517- 17(a):

(a) Feeders. Where ground-fault protection is provided for operation of the service disconnecting means or feeder disconnecting means as specified by Section 230-95 or 215-10, an additional step of ground-fault protection shall be provided in the next level of feeder disconnecting means downstream toward the load.

Such protection shall consist of overcurrent devices and current transformers or other equivalent protective equipment which shall cause the feeder disconnecting means to open.

SECTION 6: This ordinance shall become effective upon approval by the Mayor or upon becoming law without approval, except as to cases pending in any court, the previous Electrical Code of the City of Atlanta shall remain in full force and effect until those cases are finally determined.

SECTION 7: All ordinances and parts of ordinances in conflict with this ordinance are hereby repealed.

APPENDIX C

PLUMBING CODE AMENDMENTS*

CHAPTER I. ADMINISTRATION

101.1. TITLE.

This ordinance shall be known and may be cited as “The Plumbing Code of the City of Atlanta, Georgia 1992” hereafter referred to as “this code.”

102[101.2]. SCOPE.

This Code provides for matters concerning, af-fecting or relating to the installation, erection, alteration, replacement, repair, use and mainte-nance of every plumbing system, to include sani-tary drain, waste and vent systems, storm drain-age systems, water supplies, equipment, appliances, fixtures, fittings and appurtenances when con-nected to a water or sewage system in the City of Atlanta, except insofar as such matters are other-wise provided as follows:

(a) BUILDING CODE

For regulations governing the construc- tion, maintenance, alterations, repair, dem-olition or removal of structures and build-ings, see Building Code, Bureau of Buildings, City of Atlanta.

(b) ELECTRICAL CODE

For regulations governing electrical in-stallations, see the Electrical Code, Bureau of Buildings, Electrical Division, City of Atlanta.

(c) ELEVATOR CODE

For regulations governing elevator instal-lations, see the Elevator Ordinance, Bu-reau of Buildings, Electrical Division, City of Atlanta.

LDC C:3

(d) (e) (f) (g) (h) (i) @ (k) (1)

COMMERCIAL MAINTENANCE CODE

For regulations governing maintenance of existing commercial buildings, see the Commercial Maintenance Code, Bureau of

Buildings, Buildings Division.

HEATING AND AIR CONDITIONING

CODE

For regulations governing heating, ven- tilating and air conditioning see the Heat-ing and Air Conditioning Code, Bureau of Buildings, Heating and Air Conditioning

Division.

FIRE PREVENTION CODE

For regulations governing fire preven- tion, see the Fire Prevention Code, City of Atlanta.

ZONING ORDINANCE

For regulations governing zoning, see the Zoning Ordinance, City of Atlanta.

GEORGIA FIRE SAFETY LAW

For regulations governing means of egress and safety to life requirements, see also Georgia Fire Safety Law and the rules of the Safety Fire Commissioner pertaining

thereto.

AIR POLLUTION

For regulations governing the control of air pollution and air contamination, see regulations promulgated by Georgia Envi-ronmental Protection Division and appro-priate Federal regulations.

GAS CODE

For regulations governing gas piping, see Gas Code, Bureau of Buildings, HVAC Di-

vision.

GEORGIA STATE CODE FOR HANDI-

CAP ACCESSIBILITY

Where any requirement of this Code is less restrictive than those above listed, then such code or rules shall take prece-dence over the requirements of this Code.

GEORGIA STATE ENERGY CODE FOR

BUILDINGS

For regulations governing the use of en-ergy, see Georgia State Energy Code.

For regulations governing the installa- tion of boiler, see rules and regulations of the State of Georgia Department of Labor, Engineering Division.

(n) COUNCIL OF AMERICAN BUILDING OF-

FICIALS—ONE AND TWO FAMILY

DWELLING CODE

Provided however that Mechanical Part IV (chapters 10—19) and Plumbing Part V (chapters 20—25) of the One and Two Fam-ily Dwelling Code are hereby deleted.

101.3. PURPOSE.

The purpose of this Code is to provide minimum standards and/or regulations to safeguard life, limb, health, property, and public welfare of the citizens of the City of Atlanta, Georgia.

101.4. ALL NEW WORK TO CONFORM.

(a) No equipment, appliance or system, as here-inafter specified in this Code, shall be installed, constructed, erected, altered or repaired, except in conformity with the provisions of this Code.

(b) No equipment, appliance or system, as here-inafter specified in this Code, shall be altered in any manner that would be in violation of the provisions of this Code or of any authorized rules or approval of the Director of Buildings made and issued thereunder.

(c) The provisions of this Code shall not apply to the installation, alteration or repair of plumb-ing, air conditioning and heating, or electrical services up to and including the meters where such work is performed by or is an integral part of the system owned or operated by a public service corporation or the water, or gas department of any city in this state, in rendering its duly autho-rized service as such.

(d) The provisions of this Code shall not apply to the installation, alteration or repair of plumb-ing, air conditioning and heating, or electrical systems, where such work is an integral part of the system owned operated in rendering its duly authorized service as such, by a railroad company, pipeline company, mining company, public utility in the exercise of its normal functions as a public utility, or where such work is an integral part of any irrigation system on farms, ranches, or other open, unpopulated areas where such work will not be located within 30 feet of any dwelling or any building devoted to animal husbandry.

(e) The installation of all boilers shall be sub-ject to the jurisdiction of the State of Georgia Department of Labor, Engineering Division, which shall issue all permits and certifications for such equipment. Provided, however, all such approval certification shall be submitted to the Bureau of Buildings, Plumbing Division, in order to obtain final approval on plumbing systems. (See Section 103.1.)

101.5. USE AND MAINTENANCE.

(a) It shall be unlawful to maintain, use, re-pair, or alter any equipment, appliance or system that has been or will be installed, constructed or erected after the adoption of this Code, that is in violation or will violate the provisions as herein-after specified.

(b) No equipment, appliance or system, as here-inafter specified in this Code, shall be used unless it is in a safe condition. The owner shall be responsible for insuring all plumbing systems are properly maintained.

101.6. EQUIPMENT, APPLIANCES OR SYS-

TEM AFFECTED.

The provisions of this Code shall apply to any equipment, appliance or system installed, con-structed, erected, altered, repaired, maintained or used in the City of Atlanta, Georgia, except as may be otherwise specifically provided for by statute or ordinance.

101.7. APPLICATION TO EXISTING BUILD-

INGS.

Equipment, appliances or systems installed at the passage of this Code may have their existing use maintained, if approved at the time of pas-sage of this Code, provided such continued use is not dangerous to life.

LDC C:4

SECTION 102. DIRECTOR OF THE BUREAU

OF BUILDINGS TO HAVE SUPERVISION,

MAKE TEST AND INSPECTIONS

102.1. CREATION OF DUTIES.

The Director of the Bureau of Buildings shall receive applications required by this Code, issue permits and furnish the prescribed certificates.

The Director shall examine the equipment, appli-ance or system for which permits have been issued and shall make necessary inspections to see that the provisions of the law and this Code are met. The Director shall enforce all laws relat-ing to the construction, alteration, repair, instal-lation, erection, removal, demolition, use, loca-tion, and maintenance of equipment, appliances or systems, except as may be otherwise provided for in other ordinances or regulatory measures.

The Director, when requested by proper authority, or when the interests of the City of Atlanta so require, shall make investigations in connection with matters referred to in this Code and render written reports on the same. To enforce compli-ance with law, to remove illegal or unsafe condi-tions or to secure the necessary safeguards, the Director shall issue such notices or orders as may be necessary.

102.2. INSPECTIONS REQUIRED.

(a) Inspections required under the provisions of this Code shall be made by the Director of the Bureau of Buildings or his duly authorized repre-sentatives. Upon presentation of proper creden-tials, the director or his duly authorized represen-tatives may enter, at reasonable times, any building, structure or premises in the City of Atlanta to perform any duty imposed by this Code. The Director of the Bureau of Buildings or his authorized representatives are hereby autho-rized and directed to enforce all provisions of this Code, and are hereby invested with all police power necessary for the purpose of making ar-rests, issuing copies of charges and prosecution of any person or persons as may be charged with any violations of this Code or other ordinances of the City of Atlanta.

(b) All installations of any equipment, appli-ance or system for which a permit has been issued as prescribed in this Code shall be subject to inspection by the Director of the Bureau of Build-ings or his duly authorized representatives.

(c) The director or his duly authorized repre-sentatives upon notification from the permit holder shall make such inspections as may be necessary, and shall either approve that portion of the con-struction as completed or shall notify the permit holder or agent wherein the same fails to comply with the law.

(d) Failure to obtain a final inspection within 30 days of job completion or prior to tenant occupancy shall be a violation of this Code.

102.3. RULES.

(a) The Director of the Bureau of Buildings shall promulgate rules as prescribed in this Code and consistent therewith, it being the intent of this requirement that the standards of federal and state bureaus, national technical organiza-tions or fire underwriters, as the same may be amended from time to time, shall serve as a guide in fixing the minimum rules of practice under this Code.

(b) For the purpose of securing for the public the benefits of new developments and yet insur-ing public safety, the Director of the Bureau of Buildings shall make or cause to be made inves-tigations, or may accept duly authenticated re-ports from recognized sources of new materials, equipment, appliances, or systems intended for use in the City of Atlanta which are not provided for in this Code, and shall promulgate rules setting forth the conditions under which such materials, appliances, equipment or systems may be used.

(c) No rule of the Director of the Bureau of Buildings shall become effective until four weeks after notice of intention to enforce it shall have been given through the publication in a newspa-per in general circulation in the City of Atlanta and until a public hearing on the same shall have been held, provided that said public hearing shall not be necessary unless a request shall have been made for such hearing during the said period of publication, by notice to the Director of the Bu-

LDC C:5

reau of Buildings. Such rule must be drawn in its proposed form and open to public inspection at the time the notice to enforce is published.

102.4. RECORDS.

(a) The Director of the Bureau of Buildings shall keep comprehensive records of applications or permits issued, of inspections made, of reports rendered, and of notices or orders issued. The Director shall retain on file copies of required plans and all documents relating to equipment, appliances or systems for which a permit has been issued.

(b) All such records shall be open to public inspection for good and sufficient reasons at office hours observed by the City of Atlanta, but shall not be removed from the office of the Director of the Bureau of Buildings.

SECTION 103. APPLICATION FOR PERMIT

103.1. WHEN REQUIRED.

It shall be unlawful to construct, erect, install, alter or repair or to commence the construction, erection, installation, alteration or repair of any equipment, appliance or system provided for in this Code without first filing with the Director of the Bureau of Buildings an application in writing and obtaining a formal permit in conformity with Section 104.

EXCEPTION:

1. Emergency installations resulting from un-expected conditions which developed sud-denly and required immediate action shall be exempt from this section for a maximum period of forty-eight (48) hours subject to approval of the Director of the Bureau of Buildings if telephoned to the Plumbing

Division.

2. Boilers for domestic hot water 200,000 BTU and greater are subject to the jurisdiction of the State of Georgia Department of La-bor, Engineering Division however it shall be the responsibility of the installer of any such boiler to provide approved certifica-tion issued by the State of Georgia Depart-ment of Labor to the Plumbing Division.

103.2. APPLICATION FORM.

(a) An application for a permit shall be submit-ted in such form as the Director of the Bureau of Buildings may prescribe.

(b) Such application shall be made by the owner or the owner’s authorized representative, and it shall be the responsibility of the owner to see that a permit is obtained before any installation or work is started.

(c) Such application shall contain the full names and addresses of the applicant and of the owner.

(d) Such application shall describe briefly the proposed work and shall give such additional information as may be required by the Director of the Bureau of Buildings for an intelligent under-standing of the work.

(e) Applications for plumbing installations shall be first reviewed and approved for compliance with the zoning ordinance, and applications or installations which are not in compliance with the provisions of that ordinance shall not be approved or permitted.

103.3. PLANS AND SPECIFICATIONS.

(a) When required by the Director of the Bu-reau of Buildings, two or more copies of specifica-tions and drawings to scale with sufficient clarity and detail to indicate the nature and character of the work shall accompany every application. Such drawings and specifications shall contain name and address of designer and information in the form of notes or otherwise, as to the quality of materials, where quality is essential to confor-mity with this Code. Such information shall be specific, and this Code shall not be cited as a whole or in part, nor shall the term not be cited as a whole or in part, nor shall the term “legal” or its equivalent be used, as a substitute for specific information. The Director of the Bureau of Build-ings may require details, computations, stress diagrams and other data necessary to describe the construction and basis of calculations and they shall bear the signature of the person respon-sible for the design.

(b) The Director of the Bureau of Buildings may require details, computations and other data

LDC C:6

necessary to describe the construction and basis of calculations and they shall bear the signature of the person responsible for the design.

103.4. MANDATORY LICENSE REQUIREMENTS.

(a) Only partnerships or corporations engaged in the business of plumbing contracting, installation or repairing shall be entitled to a permit under this Code for such business activities where there is regularly connected with such partnership or corporation a person or persons, actually engaged in the business of plumbing contracting, installation or repairing, who holds a valid Plumbing Contractor's License issued by the State of Georgia Construction Industry Licensing Board.

(b) Only a person engaged in the business of plumbing contracting, installation or repairing shall be entitled to receive a permit under this Code for such business activities where such person holds a valid Plumbing Contractor's License issued by the State of Georgia Construction Industry Licensing Board.

(c) All work requiring a permit under this Code shall be performed by an individual, firm, or corporation holding a valid business license in the City of Atlanta unless said work is by a homeowner in the single family dwelling occupied by that individual.

SECTION 104. PERMITS

104.1. ACTION ON APPLICATION.

(a) In accordance with Section 103.4 (Mandatory License Requirements), applications for permits shall be examined, within a reasonable time after filing. If, after examination, no objection is found to the same and it appears that the proposed work will be in compliance with the laws and ordinances applicable thereto, the application shall be approved and a permit issued for the proposed work. If examination reveals otherwise, such applications shall be rejected and the applicant notified by a written report or otherwise informed.

(b) The issuance or granting of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of any violation of any of the provisions of this Code. No permit presuming to give authority to violate or cancel the provisions of this Code shall be valid, except insofar as the work or use which it authorizes is in accordance with this Code.

(c) The issuance of a permit based on applications, plans and/or specifications shall not prevent the Director of the Bureau of Buildings from thereafter requiring the correction of errors in said applications, plans and/or specifications or from preventing the work from being carried on thereunder when in violation of this Code or of other ordinances of the City of Atlanta.

104.2. PLUMBING PERMITS NOT REQUIRED UNDER THIS CODE.

The following equipment or systems do not require the issuance of permits in accordance with this Code provided such equipment or systems are installed in accordance with manufacturers requirements and applicable state and federal laws regulating such installation:

For repairs which involve only the working parts of a faucet or valve, the clearance of stoppages, the repairing of leaks where such repairing does not require the replacement of more than five feet of pipe, the replacement of defective faucets or valves or the removal. For repair of appliances already permitted may be made without permit provided no alterations are made in the existing piping fixtures.

104.3. PERMITS REQUIRED UNDER THIS

CODE AND FEE SCHEDULES.

The following equipment or systems are required to be permitted in accordance with this Code, and Table I Fee Schedules.

(a) Any person obtaining a permit shall pay to the City of Atlanta fees in accordance with Table I, City of Atlanta Plumbing

Division/Schedule of Permit Fees.

(b) Table I. City of Atlanta Plumbing Division.

Schedule of Permit Fees No plumbing permit shall be valid until the fees prescribed in this section have been paid to the City of Atlanta. Schedule of permit fees is as follows:

Permit Inspection Fees Minimum Permit Fee . $50.00 Each Plumbing fixture 10.00 Residential House Sewer - Roof Drain or Area Any Repairs, Alterations Residential Disposal Commercial Disposal Unit (not to exceed 11 /2 H.P.) 20.00 Commercial, Industrial Commercial Industrial and Multi-family Water Service Mains, per Mobile Homes—Each

unit (Same rate per fixture as residential) Autopsy Table with Repair or Alteration of Vacuum Breakers or Backflow Preventers or Fire Protection Sprinkler Systems—Per Head 0.40 Inspection of Sewer

Plug, Standpipes, per Change of Contractor/ Where additional trips are required to inspect inferior work or installations which have been rejected by the plumbing division, a reinspection fee of $50.00 shall be imposed for each reinspection after the

initial inspection when a written notice has been issued requiring the correction of inferior work.

(c) At the discretion of the director, a fee of double the usual permit shall be charged for any installation to which work has

begun without a permit in lieu of serving citations to Municipal Court. Such permit fee penalty shall not exceed $1,000.00.

(Ord. No. 1998-9, § 3, 2-16-98; Ord. No. 2002-11, § 3, 3-5-02; Ord. No. 2002-35, § 3, 5-28-02)

104.4. CONDITIONS OF PERMIT.

(a) All work performed under a permit issued shall conform to the approved application and plans and all codes or ordinances governing the work or equipment for which permits were issued.

All work shall be performed by an individual, contractor, firm or corporation licensed to perform such work except when performed by an individual installing, altering or repairing plumbing, plumbing fixtures, air conditioning and heating, air conditioning and heating fixtures, or electrical services in a single family dwelling owned and occupied by him.

(b) Individuals, contractors, firms or corporations licensed to perform work governed by this Code shall register their Georgia State Plumbing Contractor's license number with the Director of the Bureau of Buildings, with current and accurate information regarding address and phone number, before obtaining permits.

(c) One set of approved plans and specifications shall be retained by the Director and one set of approved plans and specifications shall be returned to the applicant, which shall be kept on such building or work at all times during which the work authorized thereby is in progress.

104.5. EXPIRATION OF PERMIT.

A permit under which no work is commenced within six (6) months after issuance, or where the work commenced is suspended or abandoned for six (6) months, shall expire by limitation, and fees paid shall be forfeited. The application, plans, and specifications shall be reviewed and a new permit required before work is started or resumed.

The Director of the Bureau of Buildings may revoke a permit or approval, issued under the provisions of this Code, in case there have been any false statements or misrepresentations as to a material fact in the application or plans on which the permit or approval was based.

104.7. NEW CONTRACTOR OR

ALTERNATE CONTRACTOR ON

JOB.

(a) In the event that a contractor leaves or abandons a job to which a permit has been issued before the final inspection, that contractor remains responsible for any work on that job that is not in compliance with this Code.

(b) Any new contractor on any job which has not received final approval must apply for a new permit for all work on that job that has not been finalized and assume all responsibility. A minimum fee permit may be issued in accordance with Section 104.3(b).

104.8. REFUND OR PERMIT FEES.

Within six (6) months from the date of issuance of a permit, a refund request may be granted, as follows:

(a) When a permit has been issued in error as determined by the Director, the total fee may be refunded provided no work

has commenced on that permit; or

(b) When a permit has been issued and the job has been cancelled, 50% of the permit fee may be refunded provided no work

has commenced on that permit.

(c) Any overpayment or refund request of $50.00 or less shall not be refunded.

(d) No refund shall be issued for less than $50.00.

All applications for refunds shall be in writing and shall state the reasons for the request.

(Ord. No. 1998-9, § 3, 2-16-98; Ord. No. 2002-11, § 3, 3-5-02)

SECTION 105. UNSAFE SYSTEMS,

APPLIANCES OR EQUIPMENT

105.1. UNSAFE SYSTEMS, APPLIANCES

OR EQUIPMENT.

(a) Systems, appliances or equipment covered by this Code that may be or shall be found upon inspection to have become dangerous or unsafe, shall unless made safe and so certified by the Director of the Bureau of Buildings, shall be removed or the use of such equipment or systems discontinued.

(b) The term dangerous or unsafe systems, appliances or equipment shall include systems, appliances or equipment structurally unsafe, unstable or unsanitary; constituting a fire hazard, unsuitable or improper for the use to which they are put; constituting a hazard to health or safety because of inadequate maintenance, dilapidation or obsolescence; or otherwise dangerous to life or property.

105.2. NOTICE OF UNSAFE SYSTEMS,

APPLIANCES OR EQUIPMENT.

(a) Upon receipt of information that systems, appliances or pieces of equipment covered by this Code are unsafe, the Director of the Bureau of Buildings shall make or cause to be made an inspection; and if it is found that an unsafe condition exists, shall serve or cause to be served on the owner, or someone of the owners, executors, administrators, agents, lessees or other persons who may have a vested or contingent interest in the same, a written notice containing a description of the particulars in which the systems, appliances or equipment are unsafe, and an order requiring the same to be made safe, as may be deemed necessary by him.

(b) If the person to whom such notice and order is addressed cannot be found, after diligent search, then such notice and order shall be sent by registered mail to the last known address of such person; and a copy of such notice shall be posted in a conspicuous place on the premises to which it relates. Such mailing and posting shall be deemed adequate notice.

105.3. DISREGARD OF NOTICE.

If a person served with a notice or order to remove existing unsafe conditions from systems, appliances or equipment or discontinue the use of same, should fail within a reasonable time as set by the Director of the Bureau of Buildings to comply with the requirements thereof, the Director of the Bureau of Buildings shall institute an appropriate action in the courts to compel a compliance.

SECTION 106. VIOLATIONS

106.1. NOTICE.

Whenever the Director of the Bureau of Buildings is satisfied that systems, appliances or equipment, or any work in connection therewith that is covered by this Code, is being erected, installed, altered or repaired in violation of the provisions or requirements of this code, or in violation of plans or specifications submitted and approved thereunder, or of a permit issued thereunder, a written notice or order shall be served by the Director upon the person responsible therefor directing discontinuance of such illegal action and the remedying of the condition that is in violation of the provisions or requirements of this Code.

106.2. STOPPING WORK.

Whenever, in the opinion of the Director of the Bureau of Buildings, defective or illegal work in violation of a provision or requirement of this Code is in progress, he shall order, in writing or otherwise, such work to be stopped, and may require suspension of all work until the condition in violation has been corrected.

106.3. PENALTIES.

(a) Any person who shall violate a provision of this Code or fails to comply therewith or with any of the requirements thereof shall be deemed guilty of an offense and upon conviction thereof shall be punished as provided in Section 18-1008 of the Code of Ordinances of the City of Atlanta.

Where any offense continues from day to day, each day's continuance thereof may be deemed a separate offense.

(b) The owner of a building, structure or premises, where anything in violation of this Code shall be placed or shall exist, and an architect, engineer, builder, contractor, agent, person or corporation employed in connection therewith and who may have assisted in the commission of such violation shall each be guilty of a separate offense and upon conviction thereof shall be fined as herein provided.

(c) Any work performed after the issuance of a Stop Work Order shall be demolished promptly and completely at the expense of the responsible party. Demolition shall be carried out in accordance with applicable regulations and safety standards.

(d) No permits shall be issued for further construction, renovation, or alteration of the structure in question until it has been restored to its state as of the date the Stop Work Order was issued.

(Ord. No. 2024-49(24-O-1093), § 3, 8-19-24)

106.4. ABATEMENT.

The imposition of the penalties herein prescribed shall not preclude the City of Atlanta from instituting an appropriate civil action or proceeding to prevent an unlawful erection, construction, reconstruction, alteration, repair, conversion, maintenance or use, or to restrain, correct or abate a violation, or to prevent the use of any equipment, appliance or system covered by this Code.

SECTION 107. ADVISORY BOARD

107.1. APPOINTMENT.

There is hereby created a Board to be known as the Plumbing Advisory Board, consisting of five (5) members to be appointed by the Mayor and approved by the Council. Each member shall be either an engineer or contractor with not less than six (6) years experience in the field of plumbing. The Board will elect one of its members as Chairman. Three members of said Board shall constitute a quorum thereof for the transaction of any and all business properly coming before.

All terms shall be for a period of two (2) years, except that any term shall be automatically extended until such time as the Mayor appoints a successor.

107.2. RECORDS.

The Bureau of Buildings shall provide secretarial services to the Advisory Board and shall make a detailed record of all its proceedings, which shall set forth the reasons for the decisions and the vote of each member participating therein, the absence of a member, and the failure of a member to vote. These records shall be submitted to the Board for their approval and then kept on file as a public record in the Bureau of Buildings.

107.3. PROCEDURE.

The Board shall establish rules and regulations for its own procedure not inconsistent with the provisions of this Code. The Board shall meet at regular intervals, to be determined by the Chairman, or in any event, the Board shall meet within ten (10) days after notice of appeal has been received.

107.4. APPEALS.

Whenever any person shall be dissatisfied with any ruling, decision or order of the Director of the Bureau of Buildings, such person may make a written request to the Chairman of the Advisory Board for a hearing thereon. The Chairman of the Board shall thereupon call the Board to meet to hear and investigate such complaints.

After a full and complete hearing on all questions in controversy, the Advisory Board shall render its opinion, concurring in, or recommending such changes in the order, ruling or decision of the Director of the Bureau of Buildings as it may deem fit or proper under the circumstances.

Each action of the Board shall be by resolution, copies of which shall be certified to the Director of the Bureau of Buildings and the complaining party or parties. When the Director of the Bureau of Buildings has a question relating to any matter affecting this Code, the Director may call for the Board to meet to advise the Bureau on the problem.

107.5. EXPENSE TO APPELLANT.

Any appellant, or complaining party requesting a hearing before the Advisory Board shall pay the sum of Fifty ($50.00) Dollars to the City of Atlanta.

107.6. COMPENSATION.

Each member of the Advisory Board shall be paid Twenty-Five ($25.00) Dollars by the City of Atlanta for each meeting attended by him.

SECTION 108. LIABILITY

This Code shall not be construed as imposing upon the municipal, county or state authority any liability or responsibility for damages to any person or property caused by any defect in any piping or appliance mentioned herein, or by installation thereof, nor shall the local governing body or any official or employee thereof, be held as assuming any such liability or responsibility by reason of the inspection authorized hereunder or the certificate of approval issued by the Inspector.

SECTION 2: That Section 202, Definition of Terms, be altered by adding the following definitions in their proper places, and that the definition on "Safe Waste System" be replaced as follows:

DIRECTOR: The Director of the Bureau of Buildings is the administrative authority to administer and enforce the provisions of this Code as adopted or amended.

SAFE WASTE SYSTEM: A horizontal waste system composed of main waste line, branch waste lines, auxiliary vents and a master trap with a fresh air vent. (See Section 1605 and Drawings A15, A16 and A17 of Appendix K.)

SECTION 3: That Section 404 entitled Trenching, Excavation and Backfill be amended by adding, Section 404.6 entitled Excavating and Trenching Safety, to read as follows:

"All excavations or trenching over 5 feet deep shall be sloped or supported and provided with an adequate means of exit, in accordance with Occupational Safety and Health

Administration Federal Register 29CFR 1926.650, 1926.651 and 1926.652."

SECTION 4: That Section 504 entitled Limitations of use of materials listed in Table 500 be amended by deleting, Section 504.8.1 and substituting the following in lieu thereof:

"504.8.1 Approved air admittance valves may be permitted for installation in plumbing systems five branch intervals or less, with prior approval from the Director of the Bureau of Buildings, or his authorized representative.

Such valves shall comply with ASSE 1051 listed in Table 500."

SECTION 5: That Chapter 9, entitled Plumbing Fixtures, be amended as follows:

1. That Section 914.1.4 be deleted and the following substituted in lieu thereof:

"914.1.4 Floor drain trap seals subject to evaporation shall be fed from an approved plumbing fixture or by means of an approved automatic priming device designed and

approved for that purpose."

2. That a new Section 921.9 entitled Thermal Expansion, be added as follows:

921.9 Thermal Expansion.

(a) When water is heated in a distribution system or branch of the system that has been closed by the installation of a backflow preventer, a pressure reducing valve, or any other checking device, an approved auxiliary relief valve shall be installed at an accessible location downstream from the check device to limit thermal expansion of the heated water to not more than 80 psi no-flow pressure at any fixture on the system. A discharge line not less than 1

/4-inch inside diameter shall be piped to an approved location where no water damage would result from the discharge, and any water in the discharge pipe would drain by gravity, and be protected from freezing.

(b) The auxiliary relief valve shall be in addition to the water heater safety relief valve. This thermal expansion control device shall be designed and trimmed for repeated operation. The valve shall be a minimum

1 /2-inch pipe size, shall be adjustable and calibrated, and shall include a tag describing its function. The maximum adjustable range of the thermal expansion valve shall be not more than 125 pounds (psi). The maximum

setting of the calibrated relief valve shall provide not more than 80 pounds static (noflow) pressure at any fixture in the system, but in no case shall the setting be less than 25 pounds below that of the water heater safety relief valve.

EXCEPTION: In lieu of the above auxiliary relief valve, an approved pre-charged expansion chamber that is permanently separated from the water may be used. The chamber

shall have a rated working pressure not less than the pressure setting of the water heater safety relief valve, and a corresponding temperature rating not less than 210°F. The chamber shall have the capacity to limit thermal expansion to the above specified 80 psi maximum.

109. CAR WASH REQUIREMENTS.

(a) This section and all sections beginning with "109" in Appendix C of Part III ("Land Development Code") of the Atlanta City Code shall be collectively known as the "City of Atlanta Car Wash Water Recycling Ordinance" and may be referred to throughout sections beginning with "109" as "this ordinance."

(b) The City of Atlanta has the authority to adopt this ordinance pursuant to Article 9, Section 2, Paragraphs II and III of the Constitution of the State of Georgia; Title 12, Chapter 5, Article 10 of the Official Code of Georgia Annotated (O.C.G.A. § 12-5-570 et seq.), and Section 1-102(c)(9) of the Atlanta City Charter (1996 Ga. L. (Act No. 1019), p. 4469).

(Ord. No. 2010-71(10-O-1972), § 1, 12-15-10)

109.01. GENERAL PROVISIONS.

(a) Purpose and Intent. The purpose of this ordinance is to reduce water consumption from commercial car wash facilities by requiring all new conveyor car washes to install operational recycled water systems.

(b) Applicability. This ordinance applies to all new conveyor car washes permitted and

constructed after January 1, 2011.

(c) Exemptions. The following are exempt from this ordinance:

(1) Conveyor commercial car washes that were permitted or constructed before January 1, 2011; and

(2) Self-service car washes or in-bay car washes.

(Ord. No. 2010-71(10-O-1972), § 2, 12-15-10)

109.02. DEFINITIONS.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Car Wash means any commercial enterprise operated for profit and open to the public for the purpose of cleaning, washing, waxing, vacuuming, polishing, detailing, or a combination thereof.

Conveyor Car Wash means a commercial car wash where the car moves on a conveyor belt during the wash, and the driver of the vehicle remains in the vehicle or waits outside of the vehicle.

In-Bay Automatic Car Wash means a commercial car wash that utilizes mechanical equipment to wash, rinse, and sometimes dry a stationary occupied vehicle. The vehicle remains stationary while a machine moves back and forth over the vehicle to clean it, instead of the vehicle moving through a tunnel.

Owner means any and all person(s) who have any ownership interest in the car wash establishment.

Self-Service Car Wash means a car wash operating without the assistance of a full-time on-site attendant where the customers wash their cars themselves with spray wands and brushes.

Water Recycling System means a plumbing system that captures and reuses water previously used in wash or rinse cycles.

(Ord. No. 2010-71(10-O-1972), § 3, 12-15-10)

109.03. CONVEYOR CAR WASH WATER

RECYCLING REQUIREMENTS.

Conveyor car washes permitted and constructed after January 1, 2011 which utilize City of Atlanta water shall install, utilize, and maintain a water recycling system which recycles and reuses at least fifty (50) percent of wash and rinse water. Failure to install, utilize, or maintain the water recycling system shall be a violation of this code.

(Ord. No. 2010-71(10-O-1972), § 4, 12-15-10)

3. That Section 922 entitled Minimum Plumbing Facilities, be deleted in its entirety and substitute the following in lieu thereof:

922 MINIMUM PLUMBING FACILITIES

922.1. MINIMUM NUMBER OF FIXTURES.

Plumbing fixtures shall be provided for each type of building occupancy in accordance with Table 8-1, Minimum Number of Plumbing Fixtures and Occupancy Content. Theoretical populations shall be based on occupancy load factors, or conditions, with the general proportioning of toilet facilities between men and women based upon a 50-50 distribution with a maximum travel distance to a rest room not to exceed 200 feet.

922.2. SEPARATE FACILITIES.

In other than residential installations and Section 922.3 where toilet and bathing facilities are

APPENDIX C—PLUMBING CODE AMENDMENTS $5

provided to serve members of both sexes and are designed for use by more than one person at a time, separate facilities shall be installed for each sex.

922.3. COMMON FACILITIES.

Common facilities may be provided for both sexes when the number of persons specified in Table 922 is 10 or less, or in retail stores less than 2500 sq. ft. in strip shopping centers.

4. That a new Section 925 entitled Water Con-servation Measures, be added as follows:

925 WATER CONSERVATION MEASURES

925.1. GENERAL.

a. In order to conserve water usage the follow-ing restrictions are required for all new plumbing installations and the replacement of existing fa-cilities. Provided however, that this section shall not apply to plumbing fixtures specifically de-signed for use for plumbing fixtures installed for penal institutions or emergency needs.

b. The manufacturer shall certify compliance with the standards listed in this section by label-ing the fixture and packaging as described below and providing upon request, appropriate certifi-cation by an independent national testing organi-zation acceptable to the Director of the Bureau of Buildings or his duly authorized representatives.

Effective April 1, 1992, all toilets, urinals, showerheads or faucets shall be clearly labeled to indicate the maximum flow rate or water usage of the fixture at the specified test pressure. Toilets and urinals shall additionally be labeled ASME A112.19.2M. The label shall be affixed to the fixture and remain there until the proper building and/or plumbing inspections have been con-ducted. Also, the packaging must be clearly marked to identify water use rates when offered for retail.

c. All showerheads, kitchen, bathroom and lav-atory faucets shall be tested in accordance with ANSI/ASME A112.18.1M-1989 Plumbing Fixture Fittings, as amended; except that maximum flow rates may not exceed those given in this section.

d. All toilets and urinals shall be certified to meet the hydraulic performance standards for “low consumption” water closets specified in ANSI/ ASME A112.19.2-1990 Vitreous China Plumbing Fixtures, as amended, and ANSI/ASME A112.19.6- 1990 Hydraulic Requirements for Water Closet and Urinals, as amended.

925.2. APPLICATION TO RESIDENTIAL

USE.

The following water flow restrictions shall not be exceeded for the futures listed:

a. Gravity tank-type flushometer-valve or flushometer-tank toilet shall not require more than an average of 1.6 gallon per

flush (gpf).

b. Shower heads shall not be installed that allow a flow of more than an average of 2.5 gallons of water per minute at 60 pounds per square inch of pressure.

c. Urinals shall not be installed that use more than an average of 1.0 gallons of water per minute at 60 pounds per square inch of

pressure.

d. Lavatory faucets or lavatory replacement aerators shall not be installed that allow a flow of more than 2.0 gallons of water per minute.

e. Kitchen faucets or kitchen replacement aer-ators shall not be installed that allow a flow of more than 2.5 gallons of water per minute.

925.3. APPLICATION TO NONRESIDENTIAL

USES.

The following water flow restrictions shall not be exceeded for the fixtures listed:

a. Gravity tank-type flushometer-valve or flushometer-tank toilet shall not require more than an average of 1.6 gallon per

flush (gpf).

b. Shower heads shall not be installed that allow a flow of more than an average of 2.5 gallons of water per minute at 60 pounds per square inch of pressure.

LDC C:13

c. Urinals shall not be installed that use more than an average of 1.0 gallons of water per minute at 60 pounds per square inch of

pressure.

d. Lavatory faucets or lavatory replacement aerators shall not be installed that allow a flow of more than 2.0 gallons of water per minute.

e. Kitchen faucets or kitchen replacement aer-ators shall not be installed that allow a flow of more than 2.5 gallons of water per minute.

925.4. EXTERIOR IRRIGATION & WATER-

ING SYSTEMS.

Reserved at this time.

925.5. EFFECTIVE DATE.

The effective date of this section shall be April 1, 1992, for Section 924.2; provided however, that all water closets designed for use by the physi-cally handicapped and the requirements of Sec-tion 924.3(a) shall have an effective date of July 1, 1992, for flushometer-valve toilets to allow the opportunity for the manufacture of such water conserving fixtures or devices that do not exist as of the effective date of ordinance.

SECTION 6: That Chapter 12 entitled Water Supply and Distribution, be amended as follows:

1. That a new Section 1204 entitled Protection of Potable Water Supply, be deleted in its entirety and the following submitted in lieu thereof:

SECTION 1204. PROTECTION AGAINST

BACKFLOW AND BACK SIPHONAGE

1204.1. MINIMUM REQUIRED AIR GAP.

(a) How Measured. The minimum required air gap shall be measured vertically from the lowest end of a potable water outlet to the flood rim or line of the fixture or receptacle into which it discharges.

(b) Size. The minimum required air gap shall be twice the effective opening of a potable water outlet unless the outlet is a distance less than three times the effective opening away from a wall or similar vertical surface in which cases, the minimum required air gap shall be three times the effective opening of the outlet. In no case shall the minimum required air gap be less than shown in Table 12.1.

1204.2. DEVICES FOR PROTECTING THE

POTABLE WATER SUPPLY.

(a) Vacuum breakers and backflow preventers shall be selected on the degree of hazard and the type cross-connection involved. The degree of haz-ard is determined by whether the impurities are contaminants or pollutants. The type protection shall be determined as follows:

(1) Non-Pressure Type Cross Connection. Alow inlet connection shall be protected by an approved vacuum breaker or backflow

preventer when not protected by a mini- mum air gap.

(2) A pressure type cross-connection shall be protected by an appropriate backflow

preventer only.

(3) Atmospheric or pressure type vacuum break-ers may not be used on pressure type

cross-connections.

(b) Backflow preventer assemblies, fittings, com-ponents and accessories two (2) inches or smaller shall be bronze with threaded connections. Sizes two and one-half (21/2) inches and larger may be iron or bronze, with flanged connections. See Appendix D for Selection Guide.

(c) When a backflow preventer (RPZ-BFP) is required at the service-connection to contain a premises from the main, and when the water purveyor and the plumbing official agree to allow the BFP to be installed in the service pipe imme-diately inside a building on premises, it shall be unlawful to tap into this service pipe between the BFP and the service-connection. Any branch con-nection(s) on an existing service pipe, that is to be contained by a BFP immediately inside a build-ing, shall be permanently disconnected or equipped with backflow preventer(s) that are commensu-rate with the degree(s) of hazard.

LDC C:14

1204.3. APPROVAL OF DEVICES.

All vacuum breakers and backflow preventers shall be certified or bear a label, seal or tag and be listed by a nationally recognized testing labora-tory indicating compliance with ASSE Standards and individually factory tested. See Appendix D.

EXCEPTION: Devices not listed in Appendix D may be used if approved by the Administrative Authority.

1204.4. INSTALLATION OF DEVICES.

(a) General: Vacuum breakers and backflow preventers equipped with atmospheric vents or relief openings shall be installed and located to prevent any vent or relief opening from being submerged. They shall be installed as recom-mended by the manufacturer and protected from freezing.

(1) Vacuum breaker atmospheric type (VB-AT) shall be installed at least six (6) inches above the highest outlet or the overflow level on the non-potable system and down-stream of the last shut-off valve.

(2) Vacuum breaker pressure type (V-PT) shall be installed twelve (12) inches above the highest outlet or the overflow level on the non-potable system. It may be installed

upstream of the last shut-off valve.

(3) Vacuum breaker hose type (V-HT) if not an integral part of the faucet or hydrant, this device shall be attached directly to the hose threads of the faucet and not be subjected to continuous pressure, static or flowing;

nor shall it be attached to a freezeless type hydrant unless it is designed for this ser-vice.

(4) Backflow preventer with intermediate at-mospheric vent (BFP-IAV): Installation of this device below grade is prohibited. Where relief valve discharge from the device could cause water damage, it shall be piped via an air gap or a funnel, from the relief valve port to a floor drain or other approved

location. A union shall be installed at the inlet and the outlet connections of the de-vice, and a shut-off valve on the inlet and the outlet sides of the device. A strainer (5)

(6) (7)

LDC C:15

shall be included between the first shut-off valve and the device. Maximum permissi-

ble size is three-fourths (°/4) inch.

Backflow preventer, double check valve (BFP-DCV). This device shall not be buried in earth but may be installed below ground in a meter box or pit provided the device is equipped with ball valve test cocks fitted with brass plugs. An approved shut-off valve shall be installed near the inlet and outlet sides of the device. A union or flange shall be near the inlet side of the device; when below ground, on both sides.

Backflow preventer, dual check (BFP-DuC):

This device shall not be buried in earth but may be installed below ground in a meter box or pit. An approved shut-off valve and union shall be installed near the inlet side of the device; when below ground, on both sides.

Backflow preventer, reduced pressure zone (BFP-RPZ). Installation of this device be-low grade is prohibited. An approved shut-off valve and a union or flange shall be near the inlet and outlet sides. Where relief valve discharge from the device could cause water damage, it shall be piped via an air gap or a funnel from the relief valve port to an approved location. On sizes two (2)

inches and smaller, a bronze strainer with 20-mesh stainless steel screen shall be in-stalled between the first shut-off valve and the BFP head. On sizes larger than two (2) inches a strainer shall be used where re-quired by the Administrative Authority.

A. When the reduced pressure zone (RPZ) device is installed in a line subject to periodic no-flow conditions and the sup-ply pressure is subject to periodic pres-sure dips, an auxiliary directional check valve with soft-disc shall be installed

between the inlet shut-off valve and the BFP head. Makeup lines to chilled water systems and hydronic heating systems are examples of such installa- tions.

EXCEPTION: The auxiliary direc- tional check valve will not be required when a water pressure reducing valve is installed in the same line with RPZ device and the reducing valve is lo- cated upstream of the device.

B. The two shut-off valves that are neces-sary for periodic testing of a backflow

preventer need not be attached di- rectly to the inlet and the outlet con- nections of the device. They may be installed remotely from the backflow preventer provided such relocations do not interfere with the normal testing of the device and provided there are no

intervening connections between the backflow preventer and the valves.

1204.5. MAINTENANCE AND TESTING OF

DEVICES.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:atlanta/zoning/whole@2026-10-21-50512ebb78

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.