Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations.

Section 5.3.10. Installation of Utilities.

Sobre este texto

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed within two feet (2') of each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at fifty-foot (50') intervals to insure proper utility locations as specified by the Sole County Commissioner. The developer should coordinate the location of all utilities and provide a copy of all as-built and proposed locations with the final plat.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pulaski-county/code/5.3.10@2023-06-05-b309b4b9f9

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Pulaski County Code of Ordinances, Section 5.3.10. Installation of Utilities | Georgia Commons